Basin 15 Drainage Improvements - Phase 3 – Hiatus Road Canal Culvert Reinforcement
Closed State & local contract opportunity Posted
- Solicitation number
- BID-26-71-05-HR-0-2026/hr
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Sunrise is soliciting bids for Basin 15 Drainage Improvements—Phase 3, a culvert reinforcement project at Hiatus Road canal crossing, with bids due June 25, 2026 at 2:00 p.m. EDT and a non-mandatory pre-bid conference and site visit on June 8, 2026 at 9:00 a.m. at City Hall.
The scope encompasses installation of a 54-inch reinforced concrete pipe constructed parallel to an existing 54-inch RCP culvert to upgrade hydraulic flow capacity to that of a single 72-inch RCP. Work includes sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, dewatering, canal bypass pumping, construction of two endwalls and two manhole structures, connections to existing street drainage pipe, demolition, pavement restoration and resurfacing, restoration of pavement markings, sodding, and miscellaneous incidental items. The contractor is responsible for preparation of as-built record drawings. The project is located within the 496-acre City of Sunrise Drainage Basin 15, at the Hiatus Road crossing between NW 53rd Street and NW 55th Street in Sunrise, Florida.
A bid bond is required for submission. Eight planholders are currently registered. The site visit conducted by the City will be the only time contractors are granted access to the site; contractors are responsible for bringing any required sub-contractors. No specific contract value, contract term, evaluation criteria, set-aside or preference program, or incumbent contractor information is detailed in the available solicitation materials.
Opportunity text
The project is located within the 496 acre CITY OF SUNRISE DRAINAGE BASIN 15. The Basin is bordered on the south by NW 44th Street, on the north by Commercial Boulevard, on the west by the South Florida Water Management District C-42 Canal and a portion of the Sawgrass Expressway and on the east by Nob Hill Road. The culvert reinforcement work is located at the Hiatus Road canal crossing between NW 53rd Street and NW 55th Street in the City of Sunrise. The City has instituted an overall project for roadway culvert replacements or reinforcement within the Basin 15 area, which includes the current project work. This project is for the installation of a 54 reinforced concrete pipe (RCP) to be constructed parallel to the existing 54 RCP culvert, and rerouting existing street drainage. The parallel pipe and replacement pipe section are intended to upgrade the hydraulic flow capacity of the culvert crossing to that of a single 72 RCP. The existing canal culvert is designated in the Basin as Culvert R-15-110A. The Work is generally described as follows: Project work includes sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, dewatering, canal bypass pumping, installing 54 RCP, construction of two endwalls and two manhole structures, cutting into and connecting to existing street drainage pipe, demolition, restoration of pavement and curbs, pavement milling and resurfacing, restoration of pavement markings, sodding and other miscellaneous and incidental items for a complete project. The Contractor will be responsible for preparation of as-built record drawings.
Files
| File | Type | Posted |
|---|---|---|
| sunrise 2 OpenBids-DemandStar.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity