BAK Air Traffic Control Tower Minimum Equipment List Package
Open State & local contract opportunity Posted
- Solicitation number
- 10022974.00
- State
- Indiana
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- David R. Woods david.woods@woolpert.com (678) 859-8431
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Bartholomew County, Indiana is soliciting bids for supply, installation, testing, and commissioning of air traffic control equipment, console systems, furniture, and fixtures for a new 9-level Airport Traffic Control Tower (ATCT) facility at Baker Airport, with proposals due November 10, 2026.
The scope encompasses communications systems, weather equipment, operations-floor and non-operations building equipment as specified in FAA Order 7210.78 Appendix A, slatwall-style console installations, rooftop communications antenna and cabling, facility furniture, miscellaneous fixtures including supply cabinets and bulletin boards, and appliances. The contractor is responsible for delivering a fully operational communications system that complies with FAA requirements for a Federal Contract Tower and must perform quality assurance throughout supply, installation, and commissioning to ensure the facility achieves full operational capability upon turnover to the FAA and airport authorities.
All equipment and systems must conform to FAA standards and specifications, with emphasis on communications system reliability and redundancy necessary for safe air traffic operations. The facility is a 9-level structure including the Control Cab.
A detailed Minimum Equipment List (MEL) package document (10022974.00.pdf, 351 KB) is attached and establishes the technical and operational requirements the selected contractor must meet.
Opportunity text
Project consists of providing the air traffic control equipment, slatwall style console system, furniture and fixtures (i.e.: supply cabinets, etc.) for the new Airport Traffic Control Tower (ATCT) facility at BAK. The new ATCT is a 9-level facility including the Control Cab. The work includes, but not be limited to, the supply, installation, testing, and commissioning of the new communications, weather, operations floor, non-operations and building equipment listed in Appendix A of Federal Aviation Administration (FAA) Order 7210.78. The contractor is responsible for delivering a fully operational communications system that complies with the FAAs requirements for a Federal Contract Tower. In addition, the work includes installation of new slat-wall style consoles, installation of various communication antenna & cabling on roof, facility furniture, facility miscellaneous fixtures (i.e.: supply cabinets, bulletin boards, etc.), and appliances.
Files
| File | Type | Posted |
|---|---|---|
| 10022974.00.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity