Badger Lift Station
Closed State & local contract opportunity Posted
- Solicitation number
- EN-24-9598
- State
- Wisconsin
- Responses due
Opportunity facts
- Jurisdictions
- NIGP code
- Point of contact
-
- Johanna Johnson jjohnson@cityofmadison.com (608) 264-9274
Opportunity details come from vendornet.wi.gov. Updated .
About this opportunity
The City of Madison Engineering Department and the Madison Metropolitan Sewerage District (MMSD) are seeking professional design services for the comprehensive replacement of the Badger Lane Lift Station located at 101 Nob Hill Rd. The procurement is a Request for Proposals (RFP) for planning and design services focused on replacing aging pumps and control equipment, with a comprehensive project scope that includes removing the existing lift station building, installing new pumping and electrical equipment, constructing a new wet well and valve vault, and related infrastructure improvements. Key deliverables include preliminary design recommendations due by January 6, 2024, 90% plans and specifications by January 31, 2024, and final plans and specifications by February 27, 2024. The RFP requires consultants to conduct soil borings, complete GIS mapping of sewer and force main, design a new submersible pump wet well, implement telemetry systems, and consider future basin growth when sizing new pumps. Proposals are due by November 11, 2024, with the City planning to select a design firm by November 20, 2024. Evaluation criteria will likely focus on technical approach, project understanding, team qualifications, and past performance in similar municipal infrastructure projects.
The procurement does not explicitly mention specific set-aside designations or restrictions for disadvantaged business enterprises. Payment for the project will be based on actual time and materials, not to exceed the budgeted price range of $1,000,000 to $1,250,000. The project is not anticipated to be funded through a Clean Water Fund Loan, and no incumbent vendors are identified in the documentation. The existing lift station infrastructure requires complete replacement rather than rehabilitation, with the new facility to be located within the public right-of-way and no additional property acquisition needed. The project will require integration with existing telemetry systems and consideration of historical pump runtime data to inform new equipment specifications. The City will provide construction staking, and the project aims to address current capacity and condition limitations of the existing lift station infrastructure, with an aggressive design schedule targeting project bidding in 2025.
Opportunity text
The City of Madison Engineering Department (hereon referred to as the City) and the Madison Metropolitan Sewerage District (hereon referred to as MMSD) have reviewed the age, condition, and capacity of the Badger Lane Lift Station, located at 101 Nob Hill Rd, and determined that the pumps and control equipment are in need of replacement.
Files
| File | Type | Posted |
|---|---|---|
| Badger LS RFP Addendum 1.pdf | ||
| RFP Bid Package.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity