The State of Hawaii Department of Transportation Highways Division is soliciting bids for the Kaahumanu Avenue Sidewalk Gaps project (Federal-Aid Project No. NH-032-1(011)), located in Maui County's Waipio Acres CDP. The procurement involves infrastructure improvements along Kaahumanu Avenue, specifically installing curb, gutter, and sidewalk on the south side between Mile Post 0.92 and 1.11 (approximately 1,005 linear feet). Key project deliverables include removing the existing guardrail system, installing new guardrails with end treatments, and executing minor asphalt concrete paving improvements to facilitate sidewalk and curb construction. Bidders must possess a valid State of Hawaii General Engineering "A" license and submit proposals via the HIePRO online bidding system by December 10, 2024. A virtual pre-bid conference is scheduled for November 1, 2024, and the project has a 180-working-day completion timeline. Bidders will be evaluated based on compliance with technical specifications, licensing requirements, and adherence to federal-aid project guidelines.

The contract includes a 6.40% Disadvantaged Business Enterprise (DBE) goal, with bidders required to submit DBE Confirmation and Commitment Agreements and Contract Goal Verification documentation within five calendar days after bid opening. Eligible respondents must comply with Davis-Bacon Act prevailing wage requirements, as the project is funded through federal-aid funds. The estimated construction cost ranges between $600,000 and $800,000, with the State reserving the right to reject any or all proposals. Contractors must utilize the Certification and Contract Compliance Management System for online payment tracking and demonstrate comprehensive understanding of environmental compliance, traffic maintenance, utility protection, and site restoration requirements. The project will require detailed erosion control measures, waste disposal procedures, and strict adherence to state right-of-way construction protocols. Successful bidders must implement comprehensive site management strategies to minimize infrastructure disruption and maintain safe traffic conditions throughout the construction period.

Opportunity text

The project includes installing curb, gutter, and sidewalk improvements on the south side of Kaahumanu Ave., between M.P. 0.92 & M.P. 1.11 (+/-1,005 feet). The existing guardrail system will be removed, and new guardrails and end treatments will be installed. Minor asphalt concrete paving improvements will also be constructed to facilitate the installation of a new curb and gutter, within the shoulder area, and the new guardrail system behind the new sidewalk.

Files

File Type Posted
FINAL SPECIFICATIONS w NTB NH 032 1 011.pdf PDF
FINAL ADDENDUM NO 1 NH 032 1 011.pdf PDF
FINAL PLANS NH 032 1 011.pdf PDF