B1610 and 2310 Boiler Replacement

Closed State & local contract opportunity Posted

Solicitation number
FA489726Q0008
State
Idaho
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Mountain Home Air Force Base is soliciting bids for the dismantling and replacement of boilers in Buildings B1610 and 2310 under a Total Small Business Set-Aside, with proposals due May 6, 2026. This is a NAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors) opportunity restricted to small businesses.

The scope requires removal of existing Lochinvar KnightXL boilers (Model KBX-1000N-M13 in Building 2310 and Model KBX-0400N in Building 1610, or approved equal units) and installation of fully integrated replacement systems meeting specified salient characteristics: 7-inch touchscreen LCD display, 97% thermal efficiency, flow switch, condensate trap neutralizer, and 10:1 turndown modulating burner system. The contractor must furnish all labor, equipment, supervision, and materials; connect to existing electrical, water, and gas infrastructure; install isolation valves, tee connections, wye strainers, flow switches, and condensate neutralizer kits; provide BACnet (over IP) cards for Building Management Systems integration; insulate new piping; and program boilers to a 140-degree set-point with outdoor reset capability. Work is scheduled for late spring, summer, and/or early fall 2026, with all boilers required to be installed and functioning by October 2, 2026. The contractor must submit operation and maintenance manuals and manufacturer start-up performance sheet results (two copies). All contract personnel must be fluent in English, obtain base identification and vehicle passes, and wear distinctive company identification. Work must comply with Mountain Home AFB Temporary Environmental Controls standards and manufacturer specifications. No service interruptions are permitted during cold-weather months when boilers are required for facility heat.

A mandatory pre-construction meeting (approximately one hour) will be conducted on base prior to work commencement. Base Civil Engineering Quality Assurance will conduct site visits during three inspection phases: Dismantling, Installation, and Final. A final acceptance meeting demonstrating boiler operation is required prior to final inspection.

Opportunity text

Total Small Business Set-Aside, 238220 - Plumbing, Heating, and Air-Conditioning Contractors. MHAFB has an construction requirement for the dismantling and replacement/ installation of boilers in building B1610 and 2310 IAW the SOW provided. Coordinate boilers replacement for late spring, summer, and/or early fall 2026, boilers must be installed and functioning by 2 October 2026.

Files

File Type Posted
Statement_of_Work_for_Bldg._2310_and_1610-_Final.pdf PDF