Assiscunk Creek Levee Pipe Replacement
Open State & local contract opportunity Posted
- Solicitation number
- BCSEX24012
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Burlington, New Jersey is soliciting bids through Invitation for Bid for the Assiscunk Creek Levee Pipe Replacement project in Burlington County, with bids due December 9, 2026. No set-aside is indicated in the attached file.
The scope covers levee embankment site preparation and restoration. The contractor installs limit-of-disturbance silt fence 15 feet from the levee toe or along the chain-link fence, and clears brush and trees from the upland side of the embankment to 15 feet from the toe of slope under Section 2.8c of the U.S. Army Corps of Engineers Levee Owner's Manual for Non-federal Flood Control Works. Clearing is phased so no more area is cleared than can be stabilized within 7 days. Trees are cut flush with ground, leaving stumps in place. The contractor excavates and fills animal burrows and embankment voids with well-compacted I-5 embankment material, then restores the slope with topsoil, seed, and pegged jute matting. The contractor monitors weather and coordinates the schedule with the engineer, because stabilizing disturbed areas before storm events and high tides is critical.
Opportunity text
Scope: 1. Install Limit Of Disturbance Fence (silt Fence) 15 Feet From The Foot Of The Levee Or Along The Chain Link Fence. 2. Clear All Brush And Trees From The Upland Side Of The Embankment And To A Point 15-feet From The Toe Of Slope In Accordance With Section 2.8c Of The Us Army Corps Of Engineers "levee Owner's Manual For Non-federal Flood Control Works." Clearing Shall Be Phased So That No More Is Cleared At Any Given Time Than Can Be Stabilized In 7 Days. Stabilization And Protection Of Disturbed Areas Is Critical In Advance Of Storm Events And High Tides. It Is The Contractor's Responsibility To Monitor Weather And Coordinate Schedule With The Engineer. 4. Cut Trees Flush With Ground. Leaving The Stumps In Place. 5. Thoroughly Excavate All Animal Burrows And Fill In Animal Burrows And All Voids In The Embankment With I-5 Embankment Material, Well Compacted. 6. Restore The Embankment Slope With Topsoil, Seed, And Jute Matting (pegged In Place).
Files
| File | Type | Posted |
|---|---|---|
| burlington IFB-Assiscunk-Creek-Levee-Pipe-Replacement-Project.pdf |