About this opportunity
Jersey City, New Jersey is requesting bids on Arlington Park Improvements (Project #2019-033), a comprehensive site renovation encompassing demolition, earthwork, electrical infrastructure, concrete work, site furnishings, and landscaping, with proposals due September 1, 2026.
The scope includes demolition and responsible disposal of existing site amenities — electrical fixtures, foundations, underground conduit, pavements, fencing, concrete sidewalks, curbs, retaining walls, and water park items — followed by site excavation, grading, and import/export per plan requirements. New work comprises electrical service installation (conduit, wiring, poles, fixtures, and site lighting in accordance with PSE&G standards), foundations for site and sport lighting and flag pole lighting, reinforced concrete curbing and flatwork including sidewalks and retaining walls, and site furnishings (water features, dog park with canine synthetic turf, drainage and water infrastructure, flagpole with lighting, benches). The contractor shall prepare and install specified landscaping — fencing, trees, shrubs, herbaceous plants, and ornamental grasses — and acquire all necessary permits from relevant agencies having jurisdiction.
A detailed specifications document (3MB) is attached and establishes technical requirements and standards for construction materials, installation methods, and quality assurance across all project components. Work is performed at the Arlington Park site in Jersey City. The contractor is responsible for coordinating electrical work with PSE&G requirements and complying with all contract documents, including drawings and specifications.
Opportunity text
The Project Work is defined by the Contract Documents and consists of the following: 1. Demolish, removal and responsible disposal of existing site amenities as designated on the drawings, that include but are not limited to; electrical fixtures and foundations, abandonment of existing underground electric conduit and wire, clearing & grubbing, tree removal, excavation, pavements, fencing, concrete sidewalk, curb, retaining walls, concrete slab & foundations, water park items and pipe removals. 2. Earthwork. Site excavation for improvements and grading, all cuts and fills/import export per plan requirements. 3. New electrical service electrical conduit, pull wires, poles & fixtures and connect site lighting (IAW PSE & G). Contractor shall install foundations for site lighting. Contractor shall install foundations, conduit, pull wires poles & fixtures and connect to source the sport lighting, flag pole lighting and outlet pedestals. 4. Installation of new concrete; curbing and flatwork including concrete slab and sidewalk surfaces in walking areas as designated on the plans, reinforced concrete retaining walls. 5. Installation of new site furnishings (water features, dog park, canine synthetic turf, drainage, water infrastructure, flagpole with light, benches, etc) as specified or as shown on the drawings. 6. Preparation and installation of specified landscaping items, including but not limited to: fencing, trees, shrubs, herbaceous plants and ornamental grasses as shown on the drawings. 7. Acquisition of all necessary permit(s) from various agencies having authority.
Files
| File | Type | Posted |
|---|---|---|
| jersey city Final 19-033 Arlington Imprvmnts Specs w Law Edits.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity