Americus 2025 CDBG
- The City of Barnesville, Georgia is requesting sealed proposals for FY 2025 CDBG Water and Sewer System Improvements (C&S Project No. B2595.014), with proposals due July 28, 2026 at 11:00 a.m. at the Barnesville Civic Center. The project is subject to Section 3 of the HUD Act of 1968 and Build America, Buy America Act requirements, mandating that iron, steel, manufactured products, and construction materials be produced in the United States absent approved waivers — a compliance filter...
- The City of Elberton, Georgia is requesting sealed bids for the 2026 Galvanized Main Replacement project involving water main installation and meter work, with bids due July 30, 2026 at 10:00 a.m. at City Hall, 203 Elbert Street. The project is federally funded through the Georgia Environmental Facilities Authority Revolving Loan Fund and triggers Davis-Bacon prevailing-wage compliance, DBE and EEO requirements, American Iron and Steel provisions, and Build America, Buy America (BABA) Act...
- The City of Americus, Georgia is requesting sealed bids for roadway construction along multiple paved roads in the Americus 2025 Local Resurfacing Area (LRA) project, with bids due August 11, 2026. The scope includes traffic control, erosion control measures, construction of approximately 1,485 tons of 9.5 mm RAC Superpave topping, variable depth milling of approximately 7,533 square yards, striping, and all appurtenances necessary for project completion. Work is performed on paved roads...
- The City of Hallandale Beach, Florida is requesting bids on Community Development Block Grant (CDBG) drainage improvements and street resurfacing under ITB BID 25-26-12, with bids due July 16, 2026 at 11:00 a.m. and a mandatory in-person pre-bid meeting on June 22, 2026 at 11:45 a.m. This is a federally funded HUD project subject to Davis-Bacon prevailing wage requirements, Section 3 provisions, and Build America, Buy America (BABA) Act compliance — iron, steel, manufactured products, and...
The City of Americus, Georgia is requesting sealed bids for a 2025 Community Development Block Grant infrastructure project encompassing storm drain system improvements and water system expansion, with bids due August 11, 2026 at 11 a.m. at Americus City Hall. The project is a Section 3 Covered Contract under HUD; Section 3 Business Concerns are encouraged to apply, and Section 3 documentation is required prior to Notice of Award. Build America, Buy America (BABA) compliance applies under 41 USC 8301 note, subject to HUD's phased implementation waiver for FY 2022 and 2023. The scope comprises storm drain system improvements with traffic control and erosion control measures, including construction of 208 linear feet of 54-inch reinforced concrete pipe and 198 linear feet of 36-inch reinforced concrete pipe. The water system improvement component includes approximately 3,772 linear feet of 6-inch PVC C900 water main installation with all necessary appurtenances. All work must be completed within 180 consecutive calendar days from the date of notice to proceed. Sealed bids must be accompanied by a Bidder's Bond equal to 10 percent of the bid amount, payable to the City of Americus, forfeitable as liquidated damages if the bidder fails to execute the contract and provide required Performance and Payment Bonds and Insurance Certificates. Bid documents, plans, and specifications are available for review at the Mayor's office and at Hofstadter and Associates, Inc., Consulting Engineers in Macon, Georgia, with copies obtainable upon deposit of $200 per set with no refund for returned documents. Bids arriving after the designated time will be returned unopened. No bids may be withdrawn for 60 days after bid opening. The City reserves the right to reject any or all bids and to overlook informalities or irregularities. The City is committed to affirmative fair housing and equal access regardless of race, color, national origin, religion, sex, familial status, disability, or age.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
3_ AD_BID (Americus 2025 CDBG).pdf | 103KB | 6/26/26 |