Almeda Sims Wastewater Treatment Plant Sludge Tanks 110 and 120 Repair

Closed State & local contract opportunity Posted

Solicitation number
CB-2026-0045
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Houston Public Works Department is requesting bids for complete demolition and reconstruction of Sludge Holding Tanks 110 and 120 at the Almeda Sims Wastewater Treatment Plant, with proposals due September 3, 2026. The project is subject to the City of Houston's Minority, Women, and Small Business Enterprise (MWSBE) Program participation goals and prevailing wage requirements.

The scope encompasses demolition of the two existing sludge holding tanks including structures, foundations, mechanical piping, valves, aeration equipment, and associated electrical components; construction of two new sludge holding tanks with installation of all new mechanical equipment and electrical systems to restore original design functions; and site grading and paving restoration. The tanks are located at 12319 1/2 Almeda Road, Houston, Texas 77045. Work must achieve substantial completion within 400 days from commencement.

The project manual spans 16 specification divisions organized by system (general requirements, site work, concrete, metals, mechanical, electrical) with 78 detailed drawing sheets. The contractor must comply with OSHA requirements, provide proof of injury records and safety impact position certifications prior to award, and carry performance bonds, statutory payment bonds, and one-year maintenance bonds. The contract includes liquidated damages for delays, storm water pollution prevention control measures, trench safety protocols, equal employment opportunity compliance, and drug-free workplace policies. Project design is by Binkley & Barfield, Inc., Consulting Engineers. The project is identified as WBS No. R-000298-004A-4.

Opportunity text

The project scope includes demolition and removal of the existing two (2) Sludge Holding Tanks no. 110 and 120, including tank structure with foundation, mechanical piping, valves, aeration equipment, electrical components associated with these two (2) tanks, and electrical connections to Tank 130; construction of two (2) new Sludge Holding Tanks no. 110 and 120 with installation of all new mechanical equipment and electrical systems to restore the original design functions of Sludge Holding Tanks no. 110 and 120, plus site grading and paving complete in place as described in the Project Manual, and as shown on the Plans.

Files

File Type Posted
R-000298-004A-4_Project Manual.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors