Adjacent Box Beam Bridge Bundle
Open State & local contract opportunity Posted
- Solicitation number
- 107019
- State
- Pennsylvania
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
PennDOT, administered through the SEDA-COG Joint Rail Authority, is soliciting bids for the SEDA-COG Bridge Rehabilitation Project, with public bid opening on December 10, 2026 at 11:00 a.m. Bidders must be prequalified, the project carries a 0 percent Disadvantaged Business Enterprise (DBE) set-aside requirement, and prevailing wage rates apply.
The scope covers two bridge rehabilitations that replace non-composite asphalt overlays with composite concrete decks, two superstructure rehabilitations on existing abutments, and associated roadway approaches, guide rail, sidewalk, curb, and miscellaneous construction. Work sites are Paperdale Road in Stillwater Borough, Railroad Street in Danville Borough, T-312 (Sullivan Falls Road) in Sugarloaf Township, and T-583 (Bottom Road) in Greenwood Township, all within Columbia and Montour counties. The bid package includes over 130 line items, including clearing and grubbing, excavation, asphalt mixture design and placement, concrete work, guide rail, drainage, and specialized coatings. Structure work represents 52 percent of project cost, and heavy construction wage rates apply to bridge work over watercourses. Federal provisions include Buy America, Davis-Bacon compliance, and National Pollutant Discharge Elimination System (NPDES) requirements, with special provisions covering erosion and sediment control, infiltration testing for stormwater control measures, and asphalt testing. Work involving North Shore Railroad Company requires Railroad's Protective Public Liability Insurance of $2,000,000 per occurrence and $6,000,000 aggregate, along with railroad protective services protocols.
The project budget ranges from $1,000,000 to $2,499,999.99 and is federally funded under PennDOT oversight. Anticipated notice to proceed is January 25, 2027, with required completion by September 27, 2028. No pre-bid meeting is scheduled, but a pre-construction conference is required.
Opportunity text
The description and location of the project are as follows: Includes two bridge rehabilitations of a non-composite asphalt overlay with a composite concrete deck, two bridge superstructure rehabilitations on existing abutments, roadway approaches, guide rail, sidewalk, curb, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for the SEDA-COG Bridge Rehabilitation Project in Columbia And Montour Counties Greewnwood Township, Sugarloaf Township, Stillwater Borough, And Danville Borough, Paperdale Road site is approximately 0.4 miles East of intersection with Lower Raven Creek Road to approximately 1.2 miles WEST of intersection with Buck Road, Columbia County, Stillwater Borough. Railroad Street site is approximately 0.1 mile Northeast of intersection with E. Market Street to approximately 0.2 miles Northwest of intersection with Walnut Street, Montour County, Danville Borough. T-312 (Sullivan Falls Road) site is approximately 433 feet Southeast of intersection with Jamison City Road to approximately 4.6 miles Southwest of intersection with SR 487 Columbia County Sugarloaf Township. T-583 (Bottom Road) site is approximately 0.8 miles East of intersection with SR 4011 to approximately 1.0 miles West of intersection with SR 4037 Columbia County Greenwood Township.
Files
| File | Type | Posted |
|---|---|---|
| 854018padot107019.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity