854018padot107019.pdf
PDF 625 KB Posted
- Attached to
- Adjacent Box Beam Bridge Bundle
- Solicitation number
- 107019
- Issued by
- Cumberland County, Pennsylvania
About this file
This Proposal Report concerns a Pennsylvania Department of Transportation (PennDOT) bridge rehabilitation project administered through the SEDA-COG Joint Rail Authority for multiple municipalities in Columbia and Montour Counties. The project encompasses two bridge rehabilitations featuring non-composite asphalt overlays with composite concrete decks, two bridge superstructure rehabilitations on existing abutments, roadway approaches, guide rail installation, sidewalk and curb work, and miscellaneous construction across four sites: Paperdale Road in Stillwater Borough, Railroad Street in Danville Borough, T-312 (Sullivan Falls Road) in Sugarloaf Township, and T-583 (Bottom Road) in Greenwood Township. The bid package includes over 130 line items with quantities ranging from individual units to thousands of tons of materials, including clearing and grubbing, excavation, asphalt mixture design and placement, concrete work, guide rail installation, drainage systems, and specialized coatings. The project is scheduled for public bid opening on December 10, 2026 at 11:00 AM, with an anticipated notice to proceed of January 25, 2027 and required completion by September 27, 2028. No pre-bid meeting is scheduled, though a pre-construction conference is required.
The project budget ranges from $1,000,000 to $2,499,999.99 and is classified as a federally-funded undertaking subject to PennDOT oversight, with heavy construction wage rates applicable to actual bridge work on structures spanning watercourses. Structure work represents 52 percent of the project cost. The contract includes a 0 percent Disadvantaged Business Enterprise (DBE) set-aside requirement. Prevailing wage rates apply, and prequalification is required for bidders. The project involves coordination with the North Shore Railroad Company, requiring specialized insurance (Railroad's Protective Public Liability Insurance of $2,000,000 per occurrence/$6,000,000 aggregate) and adherence to railroad protective services protocols. Applicable federal provisions include Buy America requirements, Davis-Bacon prevailing wage compliance, and environmental compliance under the National Pollutant Discharge Elimination System (NPDES). Notable special provisions address erosion and sediment control, infiltration testing for stormwater control measures, asphalt mixture design specifications with specific testing requirements, and worker protection and investment certification compliance per Executive Order 2021-06.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL REPORT
Project: 107019 Bid Package: 1
Current Let: 12/10/2026 11:00:00 AM Version: Current
Addendum Count: 0
District: 03 County: Columbia
SR/SEC/Group ID: 0000/LBR/BRIDGE REHAB LOCAL
Description Adjacent Box Beam Bridge Bundle
PROPOSAL Report - Project 107019
Page 1 of 64October 29, 2026 10:24:42 AM
TABLE OF CONTENTS
BID PACKAGE SUMMARY 4
PROJECT ITEMS AND QUANTITIES 5
SPECIAL PROVISIONS 11
G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) 11 G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW 11 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 12 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 19 C173B - a00173 CHANGES TO SPECIFICATIONS: SECTION 106 25 G1601A - a01601 E.E.O. COVERED AREA 28 G1901B - a01901 INSURANCE--GENERAL APPLICATION 28 G2201A - a02201 RAILROAD COMPANY CONTACT PERSON 29 G2301B - a02301 MAINTENANCE AND PROTECTION OF RAILROAD TRAFFIC 30 G2302A - a02302 Worker Protection and Investment 31 G2401B - a02401 RAILROAD PROTECTIVE SERVICES COSTS 32 N10550B - a10550 HEAVY CONSTRUCTION WAGE RATES 32 S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH 33 G30020E - r300020 EMERGENCY RESPONSE PROVISIONS 34 G30240D - r300280 ADVANCE NOTICE OF TRAFFIC RESTRICTIONS 34 G30434D - r300434 CONSTRUCTION RESTRICTIONS 35 S30045D - s0304132 SECTION 413.3(k) Joints. 1. Longitudinal Joints. 1.a General 37 S30035F - s0304133 SECTION 413.3(k) Joints. 3.Other Joints 38 S30070D - s0306010 SECTION 601 PIPE CULVERTS 38 S30073C - s0306011 SECTION 601.3(c) LAYING PIPE 39 S30096E - s0306300 SECTION 630 PLAIN CEMENT CONCRETE CURB 39 S30098D - s0306760 SECTION 676 CEMENT CONCRETE SIDEWALKS 40 S30931A - s0309311 SECTION 931 POST MOUNTED SIGNS, TYPE B 40 S30935A - s0309351 SECTION 935 POST MOUNTED SIGNS, TYPE F 41 S30117E - s0309620 SECTION 962 WATERBORNE PAVEMENT MARKINGS 41 S30971A - s0309711 SECTION 971 REMOVE POST MOUNTED SIGNS, TYPE B 42 S30975A - s0309751 SECTION 975 REMOVE POST MOUNTED SIGNS, TYPE F 42 S30128E - s0310011 SECTION 1001 CEMENT CONCRETE STRUCTURES 43 S30170G - s0311090 SECTION 1109 GUIDE RAIL AND METAL MEDIAN BARRIER 44 I30010C - t0302010 ITEM 0201-0001 THRU 0004 - CLEARING AND GRUBBING 44 I30040E - t0302050 ITEM 0205-0364 - SELECTED BORROW EXCAVATION ROCK, CLASS R-4 45 I30050G - t0302051 ITEM 4205-0363/0364/0368 - SELECTED BORROW EXCAVATION ROCK
CLASS R-3/4/8 (ETC.) 45
I6091L - t03060909 ITEM 0609-0009 EQUIPMENT PACKAGE 46 00 - t030677002 ITEM 4677-0002 – SELECTED MATERIAL SURFACING (SUBBASE NO. 2A) 48 I30350E - t0309012 ITEM 0901-0001,0003-0004 - MAINTENANCE AND PROTECTION OF
TRAFFIC DURING CONSTRUCTION 48
I30330D - t0309012 ITEM 0901-0002 - MAINTENANCE AND PROTECTION OF TRAFFIC DURING 49
Page 2 of 64October 29, 2026 10:24:42 AM
CONSTRUCTION
00 - t0309711 ITEM 4971-0001 – REMOVE POST MOUNTED SIGNS, TYPE B (BOROUGH
PROPERTY) 50
00 - t0309751 ITEM 4975-0001 – REMOVE POST MOUNTED SIGNS, TYPE F (BOROUGH
PROPERTY) 51
I30480B - t0310010 ITEM 5001-0611 - 6" STRUCTURE FOUNDATION DRAIN OUTLET (PVC
PIPE, SCHEDULE 40) 51
00 - t0310011 ITEM 5001-1120 CLASS A CEMENT CONCRETE (SCC) 52 00 - t0310185 ITEM 1018-0051 THRU 0054 – REMOVAL OF PORTION OF EXISTING BRIDGE 54 I30595A - t0310190 ITEM 5019-0040 - PROTECTIVE COATING FOR REINFORCED CONCRETE
SURFACES (SUBSTRUCTURE) ETC 55
I30596A - t0310191 ITEM 5019-0050 - PROTECTIVE COATING FOR REINFORCED
CONCRETESURFACES(SUPERSTRUCTURE) ETC. 56
I31159A - t0310440 ITEM 5044-0001 AESTHETIC COATINGS FOR CONCRETE SURFACES
(EPOXY RESIN) 57
00 - t0390001 ITEM 9000-0001 – BRIDGE PLAQUE 57 00 - t0390002 ITEM 9000-0002 – BRIDGE RAILING REPAIR 59 00 - t0390123 ITEM 9000-0123 GROUTING BEAM JOINTS 59 00 - t0390140 ITEM 9000-0140 BEAM SPALL REPAIRS 60 I31045D - t0390304 ITEM 9000-0304/0305 ADHESIVE ANCHOR, NO. 4/5 BAR, EPOXY COATED 61 I68C - t0395101 ITEM 9000-5101 ELECTRONIC TICKETING (E-TICKETING) FOR
CONSTRUCTION AGGREGATE 62
I70C - t0395103 ITEM 9000-5103 ELECTRONIC TICKETING (E-TICKETING) FOR
CONSTRUCTION CONCRETE 63
Page 3 of 64October 29, 2026 10:24:42 AM
BID PACKAGE SUMMARY
Project: 107019 Bid Package: 1
Project Type: Standard Posted:
Federal Project Status: PENNDOT Oversight Non-NHS State Type of Work: BRIDGE
Prequalification Required: Yes Pre-Bid Meeting: None
408 Version: 2026-1
Scheduled Let: 12/10/2026 11:00:00 AM Project Cost Range: $1,000,000.00 - $2,499,999.99 Anticipated NTP: 01/25/2027 Structure Work: 52.00%
Required Completion: 09/27/2028 DBE: 0% Wage Rates: Yes
Description:
The description and location of the project are as follows: Includes two bridge rehabilitations of a non-composite asphalt overlay with a composite concrete deck, two bridge superstructure rehabilitations on existing abutments, roadway approaches, guide rail, sidewalk, curb, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for the SEDA-COG BRIDGE REHABILITATION Project in COLUMBIA AND MONTOUR COUNTIES GREEWNWOOD TOWNSHIP, SUGARLOAF TOWNSHIP, STILLWATER BOROUGH, AND DANVILLE BOROUGH, Paperdale Road site is approximately 0.4 miles EAST of intersection with Lower Raven Creek Road to approximately 1.2 miles WEST of intersection with Buck Road, COLUMBIA COUNTY, STILLWATER BOROUGH. Railroad Street site is approximately 0.1 mile NORTHEAST of intersection with E. Market Street to approximately 0.2 miles NORTHWEST of intersection with Walnut Street, MONTOUR COUNTY, DANVILLE BOROUGH. T- 312 (Sullivan Falls Road) site is approximately 433 feet SOUTHEAST of intersection with Jamison City Road to approximately 4.6 miles SOUTHWEST of intersection with SR 487 COLUMBIA COUNTY SUGARLOAF TOWNSHIP. T-583 (Bottom Road) site is approximately 0.8 miles EAST of intersection with SR 4011 to approximately 1.0 miles WEST of intersection with SR 4037
COLUMBIA COUNTY GREENWOOD TOWNSHIP.
Additional Information:
This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
Page 4 of 64October 29, 2026 10:24:42 AM
PROJECT ITEMS AND QUANTITIES
Alt Item Work Class Code Unit Of
Measure Quantity Unit Price PDP Spec
Prov Add Action
0201-0001 A Lump Sum 1.0000 N Std
CLEARING AND GRUBBING
0201-0002 A Lump Sum 1.0000 N Std
0201-0003 A Lump Sum 1.0000 N Std
0201-0004 A Lump Sum 1.0000 N Std
0203-0001 C Cubic Yard 456.0000 N
CLASS 1 EXCAVATION
0204-0100 C1, S1, T1 Cubic Yard 144.0000 N
CLASS 3 EXCAVATION
0205-0297 C1, S4 Cubic Yard 56.0000 N
STRUCTURE BACKFILL, COARSE AGGREGATE NO. 57
4205-0363 C1 Ton 769.0000 N Std
SELECTED BORROW EXCAVATION ROCK, CLASS R-3
0205-0364 C1 Ton 24.0000 N Std
SELECTED BORROW EXCAVATION ROCK, CLASS R-4
4205-0364 C1 Ton 23.0000 N Std
SELECTED BORROW EXCAVATION ROCK, CLASS R-4 (INCLUDES EXCAVATION)
4205-0368 C1 Ton 256.0000 N Std
SELECTED BORROW EXCAVATION ROCK, CLASS R-8
0205-0390 C1 Ton 107.0000 N
SELECTED BORROW EXCAVATION, COARSE AGGREGATE, NO. 2A
0212-0014 C3, H, M2 Square Yard 2,268.0000 N
GEOTEXTILE, CLASS 4, TYPE A
0224-0010 M2 Square Yard 1,214.0000 N
GEOTEXTILE, CLASS 4, TYPE C STABILIZATION LAYER (GSBA)
0224-0011 M2 Square Yard 926.0000 N
GEOTEXTILE, CLASS 4, TYPE A SEPARATION LAYER (GSBA)
0313-0322 E Square Yard 1,382.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, < 0.3 MILLION ESALs, 25.0 MM MIX, 4" DEPTH
0350-0106 C, E Square Yard 1,418.0000 N
SUBBASE 6" DEPTH (NO. 2A)
Page 5 of 64October 29, 2026 10:24:42 AM
0350-0121 C, E Ton 501.0000 N
SUBBASE (NO. 2A)
0413-0195 F Square Yard 1,418.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, < 0.3 MILLION ESALS, 9.5 MM MIX, 1 1/2"
DEPTH, SRL-L
0460-0004 F4 Gallon 101.0000 N
ASPHALT TACK COAT (NTT/CNTT)
0601-3877 H Linear Foot 360.0000 N
84" CORRUGATED GALVANIZED STEEL PIPE, TYPE I, (3" X 1" CORRUGATIONS), 14 GAGE (WITH RESILIENCY
MEASURES)
0608-0001 X Lump Sum 1.0000 N
MOBILIZATION
0609-0004 X Lump Sum 1.0000 N
INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE C
0609-0009 X Lump Sum 1.0000 N Std
EQUIPMENT PACKAGE
0619-0459 J1, J3 Each 5.0000 N
PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, TANGENT (MASH)
0620-0400 J Each 4.0000 N
TERMINAL SECTION, SINGLE
0620-0503 C1, J Linear Foot 187.0000 N
REMOVE EXISTING GUIDE RAIL (CONTRACTOR'S PROPERTY)
0620-0872 J Each 1.0000 N
BURIED-IN-BACKSLOPE TERMINAL, SINGLE PANEL
0620-1600 J Linear Foot 550.0000 N
TYPE 31-S GUIDE RAIL
0620-1650 J Each 6.0000 N
TYPE 31-STRONG POST END TREATMENT
0620-1670 J Each 1.0000 N
TYPE 31-STRONG POST IN-LINE ANCHOR
0620-2010 J Each 12.0000 N
THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE BARRIER TRANSITION WITHOUT CURB
0630-0021 K Linear Foot 20.0000 N
PLAIN CEMENT CONCRETE CURB, 4" HEIGHT
0630-0041 K Linear Foot 33.0000 N
PLAIN CEMENT CONCRETE CURB, 8" HEIGHT
0676-0001 K Square Yard 8.0000 N
CEMENT CONCRETE SIDEWALK
0676-0004 K Square Yard 12.0000 N
Page 6 of 64October 29, 2026 10:24:42 AM
DRIVEWAY APRONS AND SIDEWALKS THROUGH DRIVEWAYS
4677-0002 C1, E Ton 37.0000 N Proj
SELECTED MATERIAL SURFACING (SUBBASE NO. 2A)
0680-0121 K2, S1 Square Yard 139.0000 N
MEMBRANE WATERPROOFING SYSTEM INSTALLED ON OTHER SURFACES
0686-0060 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE D, MODIFIED
0686-0061 X Lump Sum 1.0000 N
0686-0062 X Lump Sum 1.0000 N
0686-0063 X Lump Sum 1.0000 N
0689-0003 X Lump Sum 1.0000 N
CPM SCHEDULE
0690-0001 X Dollar 2,000.0000 $1.00 Y
INTERNAL FACILITATION
0695-0004 K Square Foot 10.0000 N
DETECTABLE WARNING SURFACE, POLYMER COMPOSITE
0703-0025 C1, H Cubic Yard 312.0000 N
NO. 57 COARSE AGGREGATE
0804-0025 M3 Pound 11.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA B RESIDENTIAL MIX, INCLUDING MULCH
0804-0027 M3 Pound 127.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA L CLEAR ZONE MIX, INCLUDING MULCH
0804-0032 M3 Pound 20.0000 N
SEEDING - FORMULA T TEMPORARY GRASS MIX, INCLUDING MULCH
0806-0113 M2 Square Yard 441.0000 N
TEMPORARY SHORT-TERM, ROLLED EROSION CONTROL PRODUCT, TYPE 2D
0810-0052 A, M1 Each 4.0000 N
SELECTIVE TREE REMOVAL
0811-0003 J2, M Linear Foot 82.0000 N
TEMPORARY PROTECTIVE FENCE
0867-0012 M2 Linear Foot 619.0000 N
COMPOST FILTER SOCK, 12" DIAMETER
0901-0001 Q Lump Sum 1.0000 N Std
MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION
Page 7 of 64October 29, 2026 10:24:42 AM
0901-0002 Q Lump Sum 1.0000 N Std
0901-0003 Q Lump Sum 1.0000 N Std
0901-0004 Q Lump Sum 1.0000 N Std
0931-0001 R Square Foot 70.0000 N
POST MOUNTED SIGNS, TYPE B
0935-0001 R Square Foot 18.0000 N
POST MOUNTED SIGNS, TYPE F
0937-0105 J, R Each 29.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE B, (Y/Y)
0937-0107 J, R Each 4.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE B, (W/W)
0937-0114 J, R Each 25.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE D, (W/W)
0937-0303 R Each 3.0000 N
FLEXIBLE DELINEATOR POST, SURFACE-MOUNT TYPE SM-1, RED POST WITH WHITE SHEETING
0937-0323 R Each 8.0000 N
FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-1, RED POST WITH WHITE SHEETING
0962-1005 O Linear Foot 373.0000 N
4" YELLOW WATERBORNE PAVEMENT MARKINGS
0962-1050 O3 Each 1.0000 N
WHITE WATERBORNE PAVEMENT LEGEND, "RR CROSSING", 6'-6", 10' LANE WIDTH (INCLUDES "X", "RR", AND 2
TRANSVERSE BANDS)
0971-0001 R Each 17.0000 N
REMOVE POST MOUNTED SIGNS, TYPE B
4971-0001 R Each 8.0000 N Proj
REMOVE POST MOUNTED SIGNS, TYPE B (BOROUGH PROPERTY)
0975-0001 R Each 7.0000 N
REMOVE POST MOUNTED SIGNS, TYPE F
4975-0001 R Each 10.0000 N Proj
REMOVE POST MOUNTED SIGNS, TYPE F (BOROUGH PROPERTY)
1001-0227 S7 Pound 360.0000 N
4X4 EPOXY COATED STEEL WWF W4 X W4
1001-0611 T7 Linear Foot 191.0000 N
6" STRUCTURE FOUNDATION DRAIN
5001-0611 T7 Linear Foot 42.0000 N Std
6" STRUCTURE FOUNDATION DRAIN OUTLET (PVC PIPE, SCHEDULE 40)
Page 8 of 64October 29, 2026 10:24:42 AM
1001-1000 S9 Cubic Yard 198.0000 N
CLASS AAAP CEMENT CONCRETE
1001-1080 S2 Cubic Yard 38.0000 N
CLASS AA CEMENT CONCRETE
1001-1120 S2 Cubic Yard 10.0000 N
CLASS A CEMENT CONCRETE
5001-1120 S2 Cubic Yard 12.0000 N Proj
CLASS A CEMENT CONCRETE (SCC)
1002-0053 S7 Pound 37,474.0000 N
REINFORCEMENT BARS, EPOXY COATED
1002-0220 S7 Pound 97.0000 N
STAINLESS STEEL REINFORCEMENT BARS
1003-0011 S2 Each 12.0000 N
DOWEL HOLES, 24" DEPTH
1018-0051 T1 Lump Sum 1.0000 N Proj
REMOVAL OF PORTION OF EXISTING BRIDGE
1018-0052 T1 Lump Sum 1.0000 N Proj
1018-0053 T1 Lump Sum 1.0000 N Proj
1018-0054 T1 Lump Sum 1.0000 N Proj
5019-0040 K2 Square Yard 103.0000 N Std
PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (PENETRATING SEALERS, REINFORCED
CONCRETE SUBSTRUCTURE SURFACES) (100% SILANE)
5019-0050 K2 Square Yard 473.0000 N Std
PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (PENETRATING SEALERS, BRIDGE
SUPERSTRUCTURE) (100% SILANE)
5044-0001 K2 Square Yard 217.0000 N Std
AESTHETIC COATINGS FOR CONCRETE SURFACES (EPOXY RESIN)
1080-0403 S6 Linear Foot 129.0000 N
PRESTRESSED CONCRETE SPREAD BOX BEAMS, 36" X 21"
1080-0434 S6 Linear Foot 210.0000 N
PRESTRESSED CONCRETE SPREAD BOX BEAMS, 48" X 24"
9000-0001 R Each 3.0000 N Proj
BRIDGE PLAQUE
9000-0002 S2 Each 9.0000 N Proj
BRIDGE RAILING REPAIR
Page 9 of 64October 29, 2026 10:24:42 AM
9000-0123 T9 Linear Foot 413.0000 N Proj
GROUTING BEAM JOINTS
9000-0140 S2 Square Foot 63.0000 N Proj
BEAM SPALL REPAIRS
9000-0304 S7 Each 2,169.0000 N Std
ADHESIVE ANCHOR, NO. 4 BAR, EPOXY COATED
9000-0305 S7 Each 389.0000 N Std
ADHESIVE ANCHOR, NO. 5 BAR, EPOXY COATED
9000-5101 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGRATE
9000-5103 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE
Page 10 of 64October 29, 2026 10:24:42 AM
SPECIAL PROVISIONS
Special Provision: G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:
Action:
Item(s) Associated:
Header:
APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)
Provision Body:
APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.
DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.
DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.
DSP12. Executive Order 11246, with Appendix A and B.
DSP13. Buy America.
DSP15. Commonwealth Standard Terms and Conditions.
DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.
Project Specific Details:
Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:
CONTRACT PROVISIONS - RIGHT TO KNOW LAW
Page 11 of 64October 29, 2026 10:24:42 AM
Provision Body:
I. Contract Provisions – Right to Know Law 8-K-1532
a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.
b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.
c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:
1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and
2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.
f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.
g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.
i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.
Special Provision: C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413
Addendum:
Action:
Item(s) Associated:
Page 12 of 64October 29, 2026 10:24:42 AM
CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413
Provision Body:
SECTION 313—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, BASE COURSE
Section 313.3(m) Tests for Depth. Revise to read as follows:•
(m) Tests for Depth.
(m) Tests for Depth. Replace with the following:
Control the loose depth of each layer to construct the base course to the compacted depth indicated and within the specified tolerance. On the top lift and in the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed base course and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course.
The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.
SECTION 314—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, ASPHALT RICH BASE COURSE
Section 314.3(m) Tests for Depth. Revise to read as follows:•
(m) Tests for Depth.
(m) Tests for Depth. Replace with the following:
Control the loose depth of each layer to construct the ARBC to the compacted depth indicated and within the specified tolerance. In the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed ARBC and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with ARBC.
The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.
SECTION 360—ASPHALT TREATED PERMEABLE BASE COURSE
Section 360.2(e)3. Production. Revise to read as follows:•
3. Production. During the first day of production, take at least three asphalt content and gradation tests to verify the mixture conforms to the JMF. After the first day, perform tests for asphalt content and aggregate gradation according to the QC Plan and PTM No. 1. Produce ATPBC conforming to the gradation requirements in Table A and with an asphalt content within 0.8% of the JMF (n=1). Ensure the aggregate is uniformly coated with asphalt and no runoff of excess asphalt is observed.
Section 360.3(m). Tests for Depth. Revise to read as follows:•
(m) Tests for Depth: Binder and Wearing Courses. Replace with the following:
Carefully dig or drill one random 6-inch diameter test hole selected by the Representative according to PTM No. 1 to the full depth of the ATPBC for each 3,000 square yards, or less, of completed base course. The Representative may require additional test holes in areas the Representative suspects are deficient in depth. The Representative will measure the depth of the base course. Using material acceptable to the Representative, backfill the test holes and compact the material to fill the test hole flush with the completed base course.
Page 13 of 64October 29, 2026 10:24:42 AM
ATPBC deficient in depth by 1/2 inch or more is defective. Immediately delineate the limits of ATPBC deficient in depth from the location by proceeding longitudinally, forward and backward, obtaining additional test holes every 50 feet until the depth is less than 1/2 inch deficient of the indicated depth. The defective course will be the full width of the affected lane.
SECTION 410—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT FINE-
GRADED COURSES
Section 410.3. CONSTRUCTION. Revise to read as follows:•
410.3 CONSTRUCTION—Section 413.3 using the test procedures, limits, and tolerances for a 9.5 mm nominal maximum aggregate size mixture except where procedures, limits and tolerances are specifically indicated for a 9.5 mm fine-graded nominal maximum aggregate size mixture and as modified as follows:
Revise Table G to include 9.5 mm Fine Grade Wearing Course as follows:
TABLE G
Mixture Minimum Indicated Compacted Depths
Mixture Minimum Depth
9.5 mm Fine Grade Wearing Course 1 inch
SECTION 412—SUPERPAVE MIXTURE DESIGN, CONSTRUCTION OF PLANT-MIXED 6.3 MM ASPHALT OVERLAY COURSES
Section 412.3(a)2. Preplacement Meeting. Revise to read as follows:•
2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.
Section 412.3(h)1.a. Placing. Revise to read as follows:•
1.a Placing. Unless otherwise allowed, deliver, place, and compact 6.3 mm paving mixtures during daylight hours. Ensure the mixture does not contain lumps of cold material. Deliver and place 6.3 mm paving mixtures at the laying temperatures specified in Table B.
Material placed outside the temperature limits as specified in Table B is defective.
Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for 6.3 mm paving mixtures unless otherwise approved by the Representative.
Section 412.4(a)4.b. Dispute Resolution. Revise TABLE H to read as follows:•
TABLE H
Dispute Resolution Retest Cost Table
Test Method
Mixture Acceptance Retest Cost if Retest Results Indicate
100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were met for Partial Lots (n < 3)**
Mixture Acceptance Retest Cost if Retest Results Indicate
< 100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were not met for Partial Lots (n < 3)**
PTM No.
702/739 $900 $3,500
PTM No. 757 $500 $2,000
Page 14 of 64October 29, 2026 10:24:42 AM
* For full lots (n ≥ 3) where the original test results indicated a defective lot, only the pay factor(s) where original test results indicated a defective lot for asphalt content or percent passing the 75 μm (No. 200) sieve will be utilized to determine the retest cost.
** For partial lots (n < 3) where the original test results indicated a pay parameter (asphalt content, percent passing the 75 µm (No. 200) sieve, or both) did not meet the Single Sample (n = 1) requirements in Table B, only the pay parameter(s) that did not meet the Single Sample (n =1) requirements will be utilized to determine the retest cost.
SECTION 413—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT
COURSES WITH PERCENT WITHIN LIMITS AND LTS TESTING (PWS-LTS)
Section 413.2(e)1. Recycled Asphalt Material. Revise to read as follows:•
1. Virgin Material Mixtures. Size, uniformly grade, and combine aggregate fractions, asphalt binder, and either WMA Technology additive(s) or modifier(s) in proportions to produce a JMF that conforms to the material, gradation, and volumetric Superpave Asphalt Mixture Design requirements according to Bulletin 27, Chapter 2A. Produce an asphalt mixture for the specified nominal maximum aggregate size and design ESALs except as procedurally modified by the WMA Technology Manufacturer Technical Representative (Technical Representative) to address laboratory procedures when preparing, compacting and testing asphalt mixtures to achieve a uniform blend. Special additive(s) or modifier(s) need not be used if mixture temperature, workability, and compaction can be achieved solely through plant mechanical modification to produce foamed asphalt. Do not incorporate the WMA Technology additive, modifier or process during the volumetric asphalt mixture design process, so that the JMF volumetrics and material percentages are based on a mixture with no WMA Technology. Only use the WMA Technology additive, modifier or process to evaluate results from moisture susceptibility testing during the mix design process. Develop an asphalt mixture JMF, then incorporate the WMA Technology additive, modifier, or process into that JMF during production. Create an asphalt JMF cover sheet (Form TR-448A) for approval containing the WMA Technology used, additive dosage rate or percent water added for foaming, material code, and the TSR data from the moisture susceptibility testing.
Submit a copy of each completed JMF, signed by a certified Asphalt Level 2 plant technician, to the DME/DMM at least 3 weeks before the planned start of mixture production. Include a list of all material sources and the asphalt mixture producer in the JMF.
Provide the calibration factors (Cf and 200 Cf) according to PTM No. 757 with the JMF. Do not start mixture production until after the DME/DMM reviews the JMF.
Submit a new JMF with a change in material sources or if a new JMF is necessary to produce a mixture conforming to this specification.
No additional revisions were made to Section 413.2(e)1.•
Section 413.2(e)1.d.5. Volumetric Analysis of Compacted Specimens. Revise TABLE A as follows:•
TABLE A
Job-Mix Formula Composition Tolerance Requirements of the Completed Mix
Single Sample (n=1) Multiple
Samples (n > 3)
Gradation Passing 12.5 mm (1/2 inch) and Larger Sieves +8% +6% Passing 9.5 mm (3/8 inch) to 150 µm (No. 100) Sieves (Inclusive) +6% +4%
Passing 75 µm (No. 200) Sieve +3.0% +2.0% Asphalt Content
19.0 mm Asphalt mixtures and smaller +0.7% +0.4%
25.0 mm Asphalt mixtures and larger +0.8% +0.5%
Temperature of Mixture (F) Chemical, Organic, Foaming Additives
Mechanical Foaming Equipment/Process
Class of Material
Type of Material Maximum*
Page 15 of 64October 29, 2026 10:24:42 AM
Minimum* Minimum* PG 58S-28 Asphalt Binder 215 230 310 PG 64S-22 Asphalt Binder 220 240 320 PG 64E-22 Asphalt Binder 240 260 330
All other Binders Asphalt Binder
The higher of 215 or the minimum temp.
specified in Bulletin 25 minus 45F
The higher of 230 or the minimum temp.
specified in Bulletin 25 minus 30F
As specified in Bulletin
* Outline in the Producer QC Plan and follow more restrictive temperature requirements provided by the WMA technology manufacturer or Technical Representative(s) for production and placement of the mixture. Determine the SGC compaction temperature for the production QC which yields the same target air voids as the designed JMF. Include the SGC compaction temperature in the Producer QC Plan. Compact the completed mixture in the SGC for QC volumetric analysis at the SGC compaction temperature according to the guidelines provided by the Technical Representative.
Section 413.2(i)2. Certification Acceptance. Revise to read as follows:•
2. Certification Acceptance. Acceptance by certification is appropriate for the following mixtures, conditions, or applications:
Scratch courses, leveling courses less than 2-inch depth and driveway adjustments.•
Mixtures used by Department maintenance forces.•
Mixtures purchased by local or municipal governments.•
Mixtures placed in quantities not exceeding 500 tons in a continuous placement operation unless otherwise directed by the Representative.
Mixtures used for parking lots.•
All 4.75 mm NMAS asphalt mixtures.•
Other mixtures, conditions, or applications as approved by the Representative.•
2.a General. Obtain certification from the mixture Producer. Use all QC tests during mixture production as acceptance tests. Certify mixtures using Form CS-4171B. Include, or attach, the QC test results on the form. Provide the form to the Inspector-in-Charge within 1 working day after completing the QC tests. Certify mixtures as specified in Section 106.03(b)3 and the requirements below.
2.b Certification of Mixture. Certify each mixture daily if QC test results conform to the single sample and multiple sample JMF production tolerances of Table A. The acceptance values will be:
Asphalt Content.•
Percent Passing the 2.36 mm (No. 8) sieve (not applicable for 4.75 mm NMAS asphalt mixtures).•
Percent Passing the 75 µm (No. 200) sieve.•
If using printed ticket results in place of laboratory test results for asphalt content, certify that at least 90% of each day’s printed ticket results for asphalt content are within 0.2 percentage points of the JMF.
If the mixture does not conform to the above requirements, do not certify the mixture. Instead, provide all QC test results to the Inspector-in-Charge. If using printed ticket results for asphalt content, provide the percentage of daily printed ticket results within 0.2 percentage points of the JMF to the Inspector-in-Charge. Payment will be determined according to Table H based on the QC test results.
If a day’s production is interrupted by corrective action, material produced after the corrective action may be certified if QC test results conform to production tolerances.
2.c Maintaining Approval to Certify Mixtures. The Department may suspend a plant’s approval to certify mixtures if QC is not performed according to the Producer QC Plan, mixtures are not produced according to Bulletin 27, a mixture cannot be certified on 2
Page 16 of 64October 29, 2026 10:24:42 AM consecutive production days, or as described below.
The Department may take IA samples of the completed mixture at the plant. In the presence of the Department, test the IA samples for asphalt content and gradation according to the test methods indicated in the Producer QC Plan. Take immediate corrective actions if the mixture does not conform to Table A.
The Department may take QA samples of the completed mixture at the plant or on the roadway directly from the uncompacted mixture placed by the paving equipment specified in Section 413.3(e). The Department will test QA samples according to PTM No. 757 or PTM No. 702, Modified Method D, if previously identified problematic aggregates are used in the mixture, for conformance to Table A. If the results of the QA samples do not comply with Table A, review the Producer QC Plan and the QC test results that followed the QA samples for conformance to Table A. If QC results do not conform to Table A, perform the corrective actions necessary to provide a mixture conforming to Table A.
After completing corrective actions or the sample review, the Department will perform an on-site evaluation of the Producer’s plant operation and QC and then take a sample of the completed mixture at the plant. In the presence of the Representative, test the sample.
If the sample does not comply with Table A, the Department will suspend certification. Immediately suspend shipping mixtures accepted by certification to the project.
After testing verifies that the produced mixture conforms to Tables A and B and with the Representative present, conduct JMF verification according to the Producer QC Plan. After successfully completing JMF verification, resume both certification and shipping mixtures accepted by certification to the project.
Section 413.3(a)2. Preplacement Meeting. Revise to read as follows:•
2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.
Section 413.3(d). Hauling Equipment. Revise to read as follows:•
(d) Hauling Equipment. Haul the mixtures in tightly sealed vehicles that do not contain petroleum oils, solvents, or other materials that adversely affect asphalt mixture. Provide covers of sufficient size and quality to protect the entire load under all conditions.
Maintain the proper and uniform placement temperature as specified in Section 413.3(h)1. Provide insulation on all sides of the truck body, a double-walled truck body, or a heated truck body when the air temperature is below 50F from October 1 to April 30. Provide a 3/8-inch diameter hole near the center and approximately two-thirds the distance down from the top of the vehicular box, on both sides, to allow for asphalt mixture temperature checks. If trucks cannot be provided with these holes, provide the Representative with two infrared temperature devices along with documentation that the devices were verified annually through an independent verification service or with a blackbody calibration block before paving for asphalt mixture temperature checks.
Section 413.3(f). Rollers. Revise to read as follows:•
(f) Rollers. Use steel wheel, pneumatic tire, vibratory, or oscillating rollers as specified in Sections 108.05(c)3.a, 3.b, 3.c, 3.e, 3.f, 3.h, or (c)4. Operate rollers according to manufacturer's recommendations. Use vibratory and oscillating rollers with separate controls for frequency and amplitude.
Section 413.3(h)1.a. Placing. Revise to read as follows:•
1.a Placing. Unless otherwise allowed or indicated, deliver, place, and compact asphalt paving mixtures during daylight hours.
Ensure the mixture does not contain lumps of cold material. Deliver and place mixtures at the laying temperatures specified in Table A for the type and class of material used. Do not incorporate any material delivered outside the temperature limits as specified in Table A. Material placed outside the temperature limits as specified in Table A is defective.
Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for RPS pavements unless otherwise approved by the Representative.
Section 413.3(h)1.e. Safety Edge. Revise to read as follows:•
1.e. Safety Edge. Construct the Safety Edge as the standard edge treatment on the outside edge of asphalt pavements and shoulders. Use the Safety Edge for both wearing and binder courses with a depth of 1.5 inches or greater. Do not place the Safety Edge at total depths greater than 5 inches. The Safety Edge is not required where curb or sidewalk are encountered or where the face of guiderail is directly over the edge of pavements. Do not place the Safety Edge for base, leveling, or scratch courses.
Page 17 of 64October 29, 2026 10:24:42 AM
Construct the Safety Edge with the same material used to construct the roadway course being placed or, if specified, the paved shoulders. Attach a device to the paver to confine material at the end gate and extrude the asphalt material in a wedge shape. Use an adjustable device that allows the operator to vary the slope extruded at the paver to account for the angle becoming steeper during compaction (roll up). Before construction, the Safety Edge device must be approved by the Representative(s).
Compact the roadway or paved shoulder as required by the specifications. Do not delay rolling of the mat adjacent to the Safety Edge. After compaction of the mat is complete, provide a Safety Edge meeting the final shape requirements as shown on the Standard Drawings. The completed angle of the Safety Edge must be 26 degrees to 40 degrees measured from the pavement cross slope extended. At the beginning of each day’s paving, measure the angle of the Safety Edge from the pavement cross slope extended. Perform measurements after final compaction is complete. If the angle of the Safety Edge does not meet the slope requirements, stop paving, and provide corrective action. Do not resume production paving until final shape requirements of Safety Edge are achieved.
Allow automatic transition to intersections, driveways, guiderail sections, and obstructions.
Use the device to constrain the asphalt head, reducing the area and increasing the density of the extruded profile. A single plate strike-off method is not allowed. Do not place the Safety Edge on organic material.
Section 413.3(h)2.a.1. Partially Completed Lots (n=2 or less). Revise to read as follows:•
2.a.1 Partially Completed Lots (n=2 or less). When process conditions change to an extent that a partially completed lot cannot be combined with the most recently completed lot, samples will be independently evaluated on the partially completed lot. For asphalt content and percent passing the 75 μm (No. 200) sieve, mixture acceptance samples will be evaluated individually as specified in Section 413.2(e), Table A (n=1) criteria. For density, mat density acceptance samples will be evaluated individually using the criteria in Table E.
If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve meet the n=1 criteria of Table A, and samples tested for density meet the criteria in Table E, payment will be 100% of the contract unit price. If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve do not meet the n=1 criteria of Table A, the material will be considered defective. If samples tested for density are no more than 2.0% below the minimum or no more than 2.0% above the maximum limits of Table E, payment will be 90% of the contract unit price. If samples for density are more than 2.0% below the minimum or more than 2.0% above the maximum limits of Table E, the pavement will be considered defective.
Unless otherwise directed in writing by the District Executive, remove and replace defective work.
No additional revisions were made to Section 413.3(h)2.a.1.•
Section 413.3(h)2.c.1. LTS Testing. Revise to read as follows:•
2.c.1 LTS Testing. The LTS will test the mixture acceptance samples according to PTM No. 757 or PTM No. 702, Modified Method D and PTM No. 739, if previously identified problematic aggregates are used in the mixture, to determine asphalt content and the percent passing the 75 μm (No. 200) sieve. The LTS will use the calibration factors (Cf and 200 Cf) provided with the JMF for PTM No. 757. For individual increment test results outside of the single sample (n=1) tolerances in Table A, the LTS will analyze the test results for extreme values according to PTM No. 4 at the 5% significance level. If discarding an extreme value reduces a lot to less than three remaining test results, the Department will accept the lot as specified in Section 413.3(h)2.a.1. The Department will accept lots with three or more test results as specified in Section 413.4(a)4 or Section 413.4(b).
If the asphalt content or the percent passing the 75 μm (No. 200) sieve is not within the single sample (n=1) or multiple sample (n≥3) tolerances in Table A for two consecutive lots or a total of three lots, stop all production of the JMF. Determine the cause of the problem and provide a proposed solution to the Department.
Do not resume production of the JMF until the Representative reviews the proposed solution and authorizes production to continue.
The LTS will test Gmm verification samples as specified in Section 413.3(j)4.d.
Section 413.3(j)4.a. General. Revise to read as follows:•
4.a General. Pavement cores are required for accepting the density of RPS construction. Pavement cores are required for standard construction of extended-season paving, unless waived by the Representative as specified in Section 413.3(b)1. Pavement cores are appropriate for accepting the density of standard construction if all the following materials, conditions, or applications exist:
Materials placed at indicated compacted depths greater than or equal to the minimum depths specified in Table G.•
Page 18 of 64October 29, 2026 10:24:42 AM
Materials placed on stable and uniform bases.•
TABLE G
Mixture Minimum Indicated Compacted Depths
Mixture Minimum Depth
9.5 mm Wearing Course 1 1/2 in.
12.5 mm Wearing Course 2 in.
19 mm Binder Course 2 1/2 in.
25 mm Binder Course 3 in.
Section 413.3(m). Tests for Depth: Binder and Wearing Courses. Revise to read as follows:•
(m) Tests for Depth: Binder and Wearing Courses. Construct the pavement to the depth indicated and within the specified tolerances.
For courses with a designed course depth and density acceptance by non-movement or optimum rolling pattern, the Inspector will calculate the weight per square yard for verification of yield. If yield results indicate insufficient course depth, drill one 6-inch diameter core for each 500 tons of material placed to determine the extent of the deficient depth as defined below. Core locations will be determined according to PTM No. 1.
For courses with density acceptance by lots, the inspector will measure the depth of each sublot according to PTM No. 737 using the density acceptance samples. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course. Deficient depth core(s) resulting in defective work should not be submitted for density acceptance testing. Once the defective work has been removed and replaced, obtain a new density acceptance sample for the sublot(s) as specified in Section 413.3(j)4.c.
Pavement deficient in depth by more than 1/8 inch in three or more adjacent acceptance core locations is defective. The extent of the defective work is the entirety of all sublots represented by the adjacent deficient acceptance core samples. The defective course will be the full width of the affected lane.
Pavement deficient in depth by more than 1/4 inch at a single acceptance core location is defective. Immediately delineate the limits of pavement deficient in depth from the acceptance core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is within 1/4 inch of the design depth. The defective course will be the full width of the affected lane.
Section 413.3(o). Defective Work. Revise to read as follows:•
(o) Defective Work. As specified in Section 105.12 and as follows:
Department acceptance and QA testing will not relieve the Contractor of responsibility for material or work that the Representative determines is defective before the Department issues the acceptance certificate. Remove and replace or repair defective work as directed.
The BOCM, CQAD will review Representative determinations of defective material or work.
Remove and replace pavement defective for temperature as specified in Section 413.3(h)1.a. for pattern segregation as specified in Section 413.3(h)3, for flushing as specified in Section 413.3(h)4, surface tolerance as specified in Section 413.3(l) or Section 313.3(l) and depth as specified in Section 413.3(m), or Section 313.3(m). Remove and replace pavement defective for percent within limits or Payment Factor Percentages as specified in Tables H and I.
Special Provision: C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876
Addendum:
Page 19 of 64October 29, 2026 10:24:42 AM
CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876
Provision Body:
SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:•
107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS—Install and maintain erosion and sediment (E&S) pollution control devices as indicated or submit an alternate plan for accomplishing equal or better temporary and permanent erosion and water pollution control. If an alternate plan is submitted, do not start work until the plan is approved by the County Conservation District and the Department. If a National Pollutant Discharge Elimination System (NPDES) Permit is involved, do not start work until the plan is approved by the DEP or the authorized County Conservation District and the Department. Concrete clean out areas, either contractor designed or indicated within the contract documents, are incidental to the contract items.
When a general or individual NPDES Permit is involved:
At the preconstruction conference, submit a Preparedness, Prevention and Contingency (PPC) Plan and identify a licensed professional (Professional Engineer, Geologist, Land Surveyor or Landscape Architect) registered in the Commonwealth and if applicable, their designee to be present onsite and responsible for implementing critical stages of the approved Post Construction Stormwater Management (PCSM) Plan.
Do not start earth disturbance activities until an environmental preconstruction meeting is held with DEP or delegated CCD.•
Conduct confirmation testing for infiltration, if applicable, as specified in Section 876.•
Within 14 days of completing the construction of a post-construction stormwater management (PCSM) stormwater control measure (SCM) as determined by the licensed professional or designee, submit a completed Chapter 102 SCM Construction Certification Form for each PCSM SCM to the Representative through PPCC. Form CS-102 has information required to complete the Chapter 102 Form(s). Ensure the General Project and SCM Information, Construction Information, and Licensed Professional Certification sections are completed by the identified licensed professional responsible for overseeing the critical stages of the approved PCSM plan.
Prepare an as-built (record) PCSM Plan to be sealed and signed by the identified licensed professional registered in the Commonwealth. All construction survey, plan preparation, and engineering required for the as-built (record) PCSM Plan will be incidental to the contract items. The as-built (record) PCSM Plan must accurately reflect deviations from the approved PCSM Plan including, but not limited to, plan locations, dimensions, inverts/elevations, materials used and grading. Update the as-built (record) PCSM Plan as construction of the project’s PCSM features progresses. Have the identified licensed professional immediately notify the Representative of all deviations from the approved PCSM Plan. Deviations to the approved PCSM Plan must be submitted for approval. Assist with the determination and documentation if the as-built deviations require a permit amendment or if the PCSM features must be removed and replaced as indicated on the PCSM Plan.
Assist the Representative in performing visual site inspections weekly and after each precipitation event greater than 0.25 inches to ensure the project's E&S Best Management Practices (BMPs) are functioning properly. Immediately initiate corrective actions, at no additional cost to the Department, upon notification by the Representative of noncompliance with the provisions of this section that the Representative has determined requires immediate corrective action under Department policies. For all other notifications of noncompliance, initiate corrective actions within 24 hours.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .