Addendum 4 BDC18-25/26 Manatee Springs - Connect to the Municipalities
Closed State & local contract opportunity Posted
- Solicitation number
- ITB-15292
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91360 Construction, Water System/Plants, Main And Service Line
- 91327 Construction, Highway And Road
- 91345 Construction, Sewer And Storm Drain
- 91340 Construction, Pipeline
- 91356 Construction, Utility/Underground Projects
- 91313 Construction, Bridge And Drawbridge (Includes Reconstruction/Rehabilitation)
- 91068 Septic Tank Maintenance And Repair Services (Includes Absorption/Leach Field Construction)
- UNSPSC codes
- 72121504 Waste disposal plant construction service
- 72141120 Sewer line construction service
- 72141125 Pumping station construction service
- 72141106 Gravel or dirt road construction service
- 72141124 Pipe laying service
- 72121505 Waste water and sewage treatment plant construction service
- 72141126 Underground utilities construction service
- 72141205 Drainage system construction service
- 72151101 Septic system construction service
- Point of contact
-
- Logan Lee-Marple logan.leemarple@floridadep.gov (850) 245-2519
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
The Florida Department of Environmental Protection (FDEP), Bureau of Design and Construction, is soliciting competitive sealed bids for construction services related to the Manatee Springs State Park - Connect to the Municipalities project (DEP BID NO. BDC18-25/26) in Leon County, Florida. This procurement encompasses multiple construction scopes of work including underground installations, plumbing, mechanical, and electrical systems at an active state park facility. Key deliverables include septic system specifications, tank configurations, force mains utilizing PVC C900 or HDPE materials with SDR 11 specifications, and value engineering options permitting combined solids and aerobic treatment unit tanks and C3 configuration tanks as alternatives to specified C4 tanks, provided all regulatory and performance requirements are satisfied. Required qualifications include bidder prequalification, which can be obtained prior to bid opening or at the time of bid opening by submitting Sunbiz and DBPR profiles, with General Contractor licensing to be verified through local permitting agencies. Bidders should note that no mandatory site visit is required; however, prospective bidders may schedule voluntary on-site visits through the park contact specified in bid documents. The bid submission deadline is March 17, 2026, and all bids must include a signed copy of Addendum No. 4, dated March 6, 2026, submitted to Logan Lee-Marple, Contracts Specialist, at the FDEP Bureau of Design and Construction office in Tallahassee, Florida, with failure to include the signed addendum potentially resulting in bid rejection.
The procurement does not indicate specific set-aside designations for disadvantaged enterprises or restrictions limiting organizational types from responding. No prior FDEP project experience or state park construction background is mandated as a qualification requirement for bidders, allowing a broad range of qualified contractors to compete. The original project estimate is $400,000; however, contractors are instructed to bid whatever amount is necessary to fulfill the specified work rather than being constrained by the estimated budget. No incumbent vendors or current contractors are identified in the available procurement documents. The addendum emphasizes that bidders must comply with all local building permits and obtain any special permits due to zoning, ordinances, and environmental requirements from the Water Management District, Department of Environmental Protection, and other applicable local, state, or federal agencies prior to construction commencement.
Opportunity text
March 6, 2026
NOTICE TO APPLICANTS
ADDENDUM NO. FOUR (4)
Manatee Springs State Park - Connect to the Municipalities
DEP BID NO. BDC18-25/26
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
_______________________________________
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
1. Question: On Page 19 of the Instructions to Bidders, it states, "Bidder Prequalification is required for all bids". Please confirm that this is in fact applicable to this bid and needed with bid submission, as well as bids will not be accepted by companies that are not prequalified.
Answer: Yes, bidder prequalification is required for all bids. No, bids will not necessarily be rejected if submitted without prequalification. You can become prequalified prior to the bid opening, or at the time of the bid opening by attaching a copy of your Sunbiz and DBPR profiles.
2. Question: On page 32 of the Instructions to Bidders, it states, "Local building permits are required, and special permits due to zoning and ordinances also may be required. Water Management District, Department of Environmental Protection, and other local, state, or federal environmental permits may be necessary before construction can start", as permits are to be obtained by the contractor and the project includes multiple scopes of work (underground, plumbing, mechanical, electrical, etc.), please confirm that a General Contractor's license is required for this bid.
Answer: Please reach out to the local permitting agency to verify which licenses are required for this particular project.
3. Question: On page 14 under special conditions the estimate for this project is $400,000.00, our preliminary budget for this project appears to exceed your project budget. Please advise whether the projected budget is firm or if bids will be considered that are above the budget.
Answer: Please bid whatever amount you deem necessary to fulfill the work specified in the bid documents.
4. Question: What is the location and size of the existing septic
drain fields on page C109 of the plans?
Answer: Based on the as-built documentation provided by the
Florida Department of Environmental Protection (FDEP) and the
Park, the existing drain field is believed to be located west of the
existing septic tank/residence. (See sheet C109 where this
information is noted.) However, no additional records were found to
confirm the precise location or dimensions of the drain field. The
Contractor to assume requirement for removal of the existing drain
fields in accordance with FAC 62-6.
5. Question: The permit calls for a 2400 GPD aerobic unit.
Can a 3000-gallon single compartment and split system be used to
supply Two 1500 GPD FAST systems?
Answer: The Restroom/Concession system is designed with two septic tanks to accommodate the two outlets from the existing building. The septic tanks discharge by gravity into a lift station, from which the sewage is lifted to the ATU. The ATU specified in the design is one (1) MicroFast 1.5. The referenced 2,400-gallon tank is an example of a tank capable of housing a single MicroFast 1.5 unit, not an account for anticipated GPD. All tanks and associated components, however, shall be reviewed and confirmed during the shop drawing submittal process
6. Question: What is the specified material for the 2" force main on page C107 of the plans?
Answer: PVC C900 or HDPE with an SDR of 11 or equivalent
material.
7. Question: Given the site restrictions and difficulties that come with working at an active state park, would it be possible to set up a Mandatory Site Visit for this project? We believe that this requirement would be key to making sure all bidders are able to provide the most comprehensive and competitive bid to the FDEP, as well as ensuring the project is done to the highest standards for the FDEP, and all costs are accounted for.
Answer: No. No pre-bid visitation is required for this project. We welcome all potential bidders to visit the site location by reaching out to the park contact specified in the bid documents and scheduling an on-site meeting.
8. Question: In our experience working in State Parks with limited resources poses difficulties that may not be known if you do not have the experience. For project references, would the FDEP consider adding in that it is a requirement to have completed at least one previous project for the FDEP in a state park?
Answer: No. There is no requirement of previous FDEP project experience to bid on this project.
Value Engineering Clarification
1. The specified tank callouts are approved tanks on the
Approved FDEP Tank List for required capacity and FAST
Unit purposes only. The Contractor shall be responsible for
selecting the specific tank manufacturer and model for
installation and shall submit the proposed tank(s) through the
shop drawing process for review and approval prior to
procurement.
2. As a value engineering consideration, the APMR and Ranger
Station systems may be able to utilize a tank configuration
such as Model 09-030-BM1D-C3, which combines the solids
tank and ATU tank into a single unit.
3. As an additional value engineering option, proposed tanks
may be C3 configuration tanks in lieu of the currently
specified C4 tanks, provided all regulatory and performance
requirements are met. The Hickory Campground and
Restroom/Concession Stand systems may be able to utilize a
tank such as Model 09-030-11S-C3.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.
Files
| File | Type | Posted |
|---|---|---|
| Addendum 4 BDC18-25-26.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity