Addendum #2 BDC07-25/26 Office of Resilience & Coastal Protection-SE Region Quayside Dock Shoreline
Closed State & local contract opportunity Posted
- Solicitation number
- ITB-14296
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- Point of contact
-
- Alisha Sadler alisha.sadler@floridadep.gov (850) 245-3127
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
The Florida Department of Environmental Protection's Office of Resilience & Coastal Protection is seeking a contractor for the Quayside Dock Shoreline Stabilization project, designated as Bid No. BDC07-25/26, located in Leon County. The procurement involves comprehensive dock and shoreline infrastructure development, with specific focus on designing and installing a fixed dock, gangway, and floating dock system. Critical technical requirements include precise handrail connections meeting safety codes, gangway design that ensures a minimum 1-foot width difference between fixed and floating elements, and floating dock stability calculations to manage load transfer and prevent structural stress. The bid solicitation requires contractors to submit detailed shop drawings for approval, particularly for the gangway and floating dock components. Interested bidders must submit their proposal by November 18, 2025, to Alisha Sadler, Contracts Specialist, at the Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Submissions must include the signed Addendum #2, with failure to do so potentially resulting in bid rejection.
While specific set-aside designations are not explicitly detailed in the document, the project appears to be a standard competitive procurement open to qualified marine construction and infrastructure development contractors. The project involves complex marine engineering requirements, suggesting that respondents will need demonstrable expertise in dock construction, marine structural design, and coastal infrastructure projects. No incumbent vendor information is provided, and specific budget ranges are not disclosed in the available documentation. The procurement seems focused on technical capability, with emphasis on contractors' ability to meet precise engineering specifications and safety standards for dock and gangway construction. Potential bidders will need to demonstrate advanced technical skills in marine structural design, load calculations, ADA compliance, and the ability to produce comprehensive shop drawings for complex maritime infrastructure components.
Opportunity text
November 7, 2025
NOTICE TO APPLICANTS
ADDENDUM NO. TWO (2)
DEP- Office of Resilience & Coastal Protection - SE Region - Quayside Dock Shoreline Stabilization
DEP BID NO. BDC07-25/26
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
_______________________________________
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
- Question: Fixed Dock and Gangway Connection
No section detail is provided for the joint between the fixed dock and the gangway.
By code, an inclined gangway must maintain continuous handrails within the level area, which requires the gangway to be narrower-allowing at least 6 in per side (1 ft total) for clearance between railings to avoid collision or hand entrapment.
👉 Please clarify how the handrail connection will be handled and whether the width of either element will be adjusted to provide the required 1 ft difference.
Answer: Gangway is a submittal item in the project plans. Contractor to submit shop drawings for approval
- Question: Floating Dock Stability
The gangway transfers approximately 650-800 lb to the floating dock. Because this load is offset about 1 ft from the edge, it will create a torsional moment that tends to tilt the float and overstress the pile guides.
👉 Please clarify how this unbalanced loading condition will be prevented, and whether the gangway landing will be centered on the float.
Answer: Floating dock and gangway are submittal items in the project plans. If a compensation float is required for the gangway or floating dock submitted by the Contractor, item is to be included in the submittal.
- Question: Transition Plate and Access Area
A transition plate (typically 4-5 ft long) is required and must include guardrails.
With only a 5 ft wide float and an off-center gangway, the remaining flat walk surface is less than 1 ft wide, which is not code-compliant nor safe.
👉 Please clarify the intended transition-plate length and landing configuration ensuring safe, ADA-compliant access.
Answer: Floating dock and gangway are submittal items in the project plans. If a compensation float is required for the gangway or floating dock submitted by the Contractor, item is to be included in the submittal.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.
Files
| File | Type | Posted |
|---|---|---|
| BDC07-25-26 - Bid Addendum #2.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity