The Florida Department of Environmental Protection, Bureau of Design and Construction, has issued Addendum No. 1 to BDC01-26/27 for sewer improvements at Curry Hammock State Park, with bids due August 12, 2026. The addendum must be signed by contractors and included with bid submissions to Alisha Sadler, Contracts Specialist, at 3800 Commonwealth Boulevard, MS #520, Tallahassee, Florida 32399-3000; failure to include the signed addendum may result in bid rejection.

The addendum clarifies a material specification: 2-inch diameter ductile iron pipe (DIP) is not available from vendors. Contractors are authorized to substitute high-density polyethylene (HDPE) pipe, using the same material specification as the remainder of the project's force main piping system. All other contract documents and attachments remain in full force and effect.

Opportunity text

July 24, 2026

NOTICE TO APPLICANTS

ADDENDUM NO. ONE (1)

Curry Hammock State Park - Sewer Improvements

DEP BID NO. BDC01-26/27

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________

Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

  1. Question: Our pipe vendor has informed us that 2" DIP does not exist. Please advise which type of pipe to use in lieu of DIP.

Answer: HDPE can just be used here as well (same material as the rest of the force main for this project).

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Files

File Type Posted
BDC01-26-27 - Bid Addendum #1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity