Ada County Courthouse Pump Replacement Project
Closed State & local contract opportunity Posted
- Solicitation number
- BID 26049
- State
- Idaho
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 031 Air Conditioning, Heating, And Ventilating Equipment, Parts And Accessories
- 910 Building Maintenance, Installation And Repair Services
- 670 Plumbing Equipment, Fixtures, And Supplies
- 720 Pumping Equipment And Accessories
- 03110 Air Purifiers, Accessories And Supplies
- 658 Pipe, Tubing, And Accessories, Not Fittings
- 659 Pipe And Tubing Fittings
- 03191 Unit Heaters, Electric (Duct And Suspended Types)
- 72056 Pumps, Miscellaneous (Not Otherwise Classified)
- 90924 Building Construction, Commercial And Institutional
- UNSPSC codes
- 40160000 Industrial filtering and purification
- 40170000 Pipe piping and pipe fittings
- 40000000 Distribution and Conditioning Systems and Equipment and Components
- 40101800 Heating equipment and parts and accessories
- 40140000 Fluid and gas distribution
- 40150000 Industrial pumps and compressors
- 40151700 Pump parts and accessories
- 72000000 Building and Facility Construction and Maintenance Services
- 72121100 Commercial and office building construction services
Opportunity details come from adacounty.bonfirehub.com. Updated .
About this opportunity
Ada County, Idaho is soliciting sealed bids for the Ada County Courthouse Pump Replacement Project (BID 26049), a mechanical systems replacement initiative located at 200 West Front Street in Boise, Idaho. The procurement encompasses the demolition, removal, and replacement of four existing pump units in the sixth-floor penthouse and two sewer ejector pumps in the sally port basement, including all associated fittings, piping, valves, and appurtenances necessary to complete the installations. Bidders must be licensed in Idaho in accordance with the Public Works Contractor Act and must list all HVAC, plumbing, and electrical subcontractors with subcontract amounts on the bid form; failure to provide this information will render bids non-responsive. The project includes a Base Bid for penthouse and sally port pump replacements and one Additive Alternate Bid for the replacement of four chilled water pumps and one condensing water pump in the basement, contingent on funding availability. A mandatory pre-bid meeting is scheduled for May 27, 2026, at 10:00 a.m. in Room 2210 of the Ada County Courthouse, with attendance required for bid eligibility. Sealed bids must be submitted electronically through the Bonfire platform at https://adacounty.bonfirehub.com no later than 4:00 p.m. local time on June 15, 2026. The Board of Ada County Commissioners will consider the bid recommendation on June 23, 2026, at 9:00 a.m., with a Notice to Proceed expected within ten days of contract execution, Substantial Completion required by September 7, 2026, and Final Completion by September 16, 2026.
No set-aside designations or disadvantaged enterprise restrictions are identified in the procurement documents. The successful bidder must furnish performance and payment bonds equal to 100 percent of the contract amount through a surety company with an AM Best rating of A-VIII or better and must maintain comprehensive insurance coverage including Workers' Compensation, Employers' Liability, Commercial General Liability, Business Automobile Liability, Installation Floater, and Equipment Floater policies. The Base Bid must include a $7,500 Owner's Contingency Allowance, and liquidated damages are assessed at $250 per day for late completion. No state or federal funding will be utilized on this project. The specific contract award value or budget range is not disclosed in the available procurement documents, though the detailed technical drawings and specifications serve as the design documentation that bidders must reference when preparing their cost estimates and proposals.
Opportunity text
The work is generally described as providing demolition, removal, and replacement of four existing pump units located in the sixth floor penthouse of the Ada County Courthouse and two existing sewer ejector pumps located in the sally port basement, together with all associated fittings, piping, valves, and appurtenances necessary to complete those replacements.
Files
| File | Type | Posted |
|---|---|---|
| 3-Bid26049 Drawings.pdf | ||
| 1-Bid26049 Bidders Bid Form.pdf | ||
| 2-Bid26049 Specifications.pdf |