The state and local contract opportunity is a roof repair and recover project for the Colorado Northwestern Community College (CNCC) Academic Building, located in Craig, Colorado, within Ouray County. The procurement involves comprehensive roof system modifications, including the removal of existing roof layers and installation of a new fully adhered black EPDM membrane roof assembly system. Specific project requirements include relief cutting existing membrane in a 10'x10' grid pattern, installing new fire-treated gypsum coverboard, and replacing wet or damaged insulation. The project mandates furnishing and installing new flashings and sheet metal components such as fascia metal, parapet caps, counter-flashings, and roof jacks. A critical project timeline stipulates substantial completion within 30 calendar days from the Notice to Proceed, with sealed bids due on August 25, 2023, at 9:00 AM. A mandatory pre-bid conference was held virtually on August 17th, 2023, and the anticipated construction start is scheduled for September-October 2023.
While no specific set-aside designations or restrictions on responding organizations were explicitly detailed, the project may trigger prevailing wage requirements if the construction contract reaches or exceeds $500,000. The contract appears to be open to qualified roofing contractors capable of executing complex roof system modifications. Although a specific budget range was not provided, the comprehensive scope of work suggests a potentially significant project investment. The project requires technical expertise in roof system assemblies, including working with metal roof decks, EPDM membranes, and specialized installation techniques. Contractors must demonstrate proficiency in mechanical attachment of materials, particularly ensuring fasteners penetrate tongue and groove decking to a minimum 1-inch depth without compromising exposed soffits. The project is identified under the procurement code CNCC FY23-010 and involves precise technical specifications for roof system recovery and replacement.
Opportunity text
This project includes the removal of existing roof systems and associated flashing for in-scope roof replacement areas as well as recovering existing in-scope roof areas where the existing roof system will remain in place. The Contractor will be required to furnish and install a new fully adhered black EPDM membrane roof assembly system at all roof replacement areas and a new aggregate embedded asphalt flood coat over existing to remain built-up roof areas. All work will include new flashings and new sheet metal (fascia metal, parapet cap, counter-flashings, roof jacks, etc.) as shown per roof deck assembly on drawings. All work noted above to be performed as a specified in accordance with the design drawings, specification, and governing building codes. The Principal Representative has determined that the entire project shall be substantially complete within 30 calendar days from the date of the Notice to Proceed. This project may have prevailing wage requirements if construction contract is $500,000 or greater. The scope of this project is a roof recover over the existing EPDM roof assembly. The existing roof systems consist of: • A fully adhered EPDM membrane over gypsum cover board over one fully adhered layer of polyisocyanurate insulation over one mechanically fastened layer of polyisocyanurate insulation over an existing metal roof deck. • Contractor to relief cut existing membrane (10'x10' grid pattern) prior to roof recover installation. All existing roof layers below the existing membrane are to remain in place, with the installation of a new roof recover assembly consisting of: o Metal Deck (Structural Slope) - All roof areas 1/R-102: New 0.060-Inch (60 MIL) non-reinforced black EPDM membrane - Fully adhered over. New ½'' fire-treated, gypsum coverboard with glass mat facers (48''x48'' boards) - R-0.56 (Mechanically attached through prepared existing roof assembly below to deck). o Existing roof system over metal roof deck. o Contractor to remove and replace all wet or damaged insulation to match existing.
Files
| File | Type | Posted |
|---|---|---|
| CNCC FY24-001 - Addendum 2.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity