Addendum #2 for the Colorado Northwestern Community College (CNCC) Academic Building Roof Repair and Recover project details modifications and clarifications to the original bid documents. The addendum, issued on August 22nd, 2023, addresses two key questions from potential bidders: a request to substitute EPDM membrane with TPO (which was declined), and a technical inquiry about installation methods for fire-rated board at the building's wood overhang. The document provides specific guidance on mechanical attachment of materials, requiring contractors to ensure fasteners penetrate the tongue and groove decking to a minimum 1-inch depth without compromising the exposed soffit.
The project, located at 2801 W. 9th Street in Craig, Colorado, involves a roof recover for the Academic Building, with a scope that includes removing existing roof systems, installing a new fully adhered black EPDM membrane, and applying a new aggregate embedded asphalt flood coat. The project is part of CNCC FY23-010 and may trigger prevailing wage requirements if the contract exceeds $500,000. The mandatory pre-bid conference was held virtually on August 17th, 2023, with sealed bids due on August 25th, 2023, at 9:00 AM. The anticipated construction start is scheduled for September-October 2023, with an expectation of substantial completion within 30 calendar days from the Notice to Proceed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #2 August 22nd, 2023
CNCC FY23-010
Academic Building Roof Repair, Recover
Addendum #2
Questions/Answers:
1. We are wondering if we would be able to substitute the EPDM membrane for TPO and bid TPO on this project?
a. Answer: CNCC does not anticipate using TPO.
2. Over the finished wood overhang along the front of both sections of roofing about 6 foot out, there is existing material that is glued directly to the plywood decking that appears to be directly over the finished wood planking exposed on the soffit. To install the required fire rated board, the screws for attachment must extend ¾” beyond the substrate being attached to, laving screws sticking out of the soffit. I recommend removing the material over this area and fully adhering the fire board to the decking.
This will add a bit of cost but is necessary to complete properly. There is also some positive pressure causing ballooning on a large HVAC unit that will need to be addressed as well.
a. Answer: Based on roof coring previously performed, the subject soffit area consists of a 2” thick tongue and groove decking with an adhered plywood above it. Contractor will be responsible for providing mechanical attachment that will not penetrate the underneath side of exposed tongue and groove decking at soffits.
Mechanical attachment will be required to penetrate tongue and groove decking minimum 1” depth. See forthcoming Addendum #01 for additional information.
End of Addendum #1.
1720 South Bellaire Street Suite 1200 Denver, Colorado 80222 Tel: (303) 738-0823 www.amtechsls.com
ADDENDUM 1
DATE: August 21, 2023 TO: Invited Roofing Contractor Bidder RE: Addendum One (1) PROJECT: CNCC Academic Building Roof Project 2801 West 9th Street Craig, CO 81625
PROJECT NO.: DEN.2023.001003
To Whom it May Concern:
The following changes, clarifications and/or corrections to the bid documents and schedule are made subsequent to the pre-bid meeting held Thursday, August 17, 2023. Please note the following items/modifications to the scope of project to be included as part of the bid:
1. Drawing Sheet R-102:
a. Roof plan A was updated to reflect in-scope roof areas.
b. Roof assembly detail 1 was updated to clarify existing roof conditions.
2. Drawing Sheets R-200:
a. Roof plan B was updated to reflect in-scope roof areas.
3. Drawing Sheet R-300:
a. Roof plan C was updated to reflect in-scope roof areas.
b. Callouts on roof plan C and Keynote 3 were added or edited for clarity.
4. Detail 5 on sheet R-502 was revised for clarity.
The full drawing set with the revised sheets referenced above has been included at the end of this Addendum.
This Addendum does not include a date change for submission of proposals.
This Addendum does not include a time extension for the performance of work described herein.
Receipt of this addendum is to be acknowledged on the submitted Bid Form.
Sincerely, Robert Piane, AIA, NCARB General Manager Denver Email: robertpiane@amtechsls.com
End of Addendum 1 mailto:robertpiane@amtechsls.com
VICINITY MAP:REGION MAP:
ROOF WORK AREAS
TRUE
NORTH
· R-100 COVER SHEET
· R-101 DESIGN NOTES
· R-102 ROOF ASSEMBLIES
· R-200 WIND DESIGN
· R-300 ROOF PLAN
· R-500 ROOFING DETAILS
· R-501 ROOFING DETAILS
· R-502 ROOFING DETAILS
SHEET INDEX:
AERIAL MAP:
APPLICABLE DESIGN CODES:
1. 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2. 2021 INTERNATIONAL BUILDING CODE (IBC)
3. 2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
4. BUILDING DATA:
4.1. FIRE SPRINKLED.
4.2. MONITORED ALARM.
4.3. CONSTRUCTION TYPE III - NON-COMBUSTIBLE:
4.3.1. STEEL FRAMING WITH METAL PANEL DECKING.
4.4. OCCUPANCY CLASSIFICATION:
4.4.1. GROUP B - BUSINESS
ABBREVIATIONS:
CONT. CONTINUOUS
(E) EXISTING
(ETR) EXISTING TO REMAIN
(FA) FULLY ADHERED
GA. GAUGE
GALV. GALVANIZED
GYP. GYPSUM
MAX. MAXIMUM
(MA) MECHANICALLY ATTACHED
MTL METAL
MIN. MINIMUM
(N) NEW
O.C. ON CENTER
REQ. REQUIREMENT
R.T.S. REINFORCED TERMINATION STRIP
SIM. SIMILAR
TYP. TYPICAL
V.I.F. VERIFY IN FIELD
PLOT SCALE IS 30x42
ISSUED FOR
SHEET NO.
SHEET TITLE
PROJECT
CLIENT
DATE REVISION
DRAWN BY
CHECKED BY
PROJECT NO.
DATE
LEGEND
OF
1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222
(303) 738-0823 | www.amtechsls.com
AMTECH
SOLUTIONS
KEYPLAN LEGEND
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
2801 WEST 9TH STREET
CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF
PROJECT
2801 WEST 9TH STREET
CRAIG, CO 81625
DEN.2023.001003
06/2023
1 ADDENDUM 108/21/2023
100% CONSTRUCTION DOCUMENTS
RKP & DD
IL
DESIGN NOTES
R-100 01 08
AMTECH SOLUTIONS, INC.
1720 SOUTH BELLAIRE STREET, SUITE 1200
DENVER, COLORADO 80222
TEL: (303) 738-0823
WEBSITE: WWW.AMTECHSLS.COM
OWNER:PROJECT: CONSULTANT:
AMTECH
SOLUTIONS
CNCC 23-007 - CRAIG, CO - SUMMER 2023 - AMTECH PROJECT NO.: DEN.2023.001003
2801 WEST 9TH STREET, CRAIG, CO 81625
2801 WEST 9TH STREET, CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF PROJECT
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
CNCC ACADEMIC BUILDING ROOF PROJECT
2801 WEST 9TH STREET,
CRAIG, CO 81625
PLOT SCALE IS 30x42
ISSUED FOR
SHEET NO.
SHEET TITLE
PROJECT
CLIENT
DATE REVISION
DRAWN BY
CHECKED BY
PROJECT NO.
DATE
LEGEND
OF
1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222
(303) 738-0823 | www.amtechsls.com
AMTECH
SOLUTIONS
KEYPLAN LEGEND
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
2801 WEST 9TH STREET
CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF
PROJECT
2801 WEST 9TH STREET
CRAIG, CO 81625
DEN.2023.001003
06/2023
1 ADDENDUM 108/21/2023
100% CONSTRUCTION DOCUMENTS
RKP & DD
IL
DESIGN NOTES
R-101 02 08
GENERAL NOTES:
1. ALL CONDITIONS OR PENETRATIONS MAY NOT BE SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS, MEASUREMENTS/DIMENSIONS, QUANTITIES, LOCATIONS, ETC. AND NOTIFYING AMTECH SOLUTIONS OF ANY DISCREPANCIES PRIOR TO
BIDDING.
2. ALL SHEET METAL WORK MUST COMPLY WITH SMACNA AND ANSI/SPRI ES-1 AND GT-1 AS
REFERENCED IN THE APPLICABLE VERSION OF THE IBC AND IEBC.
3. THE WORK OF THIS CONTRACT SHALL BE COMPLETED IN ACCORDANCE WITH THE ATTACHED
DRAWINGS, DOCUMENTS AND SPECIFICATIONS.
4. ALL MATERIALS TO BE USED ON THIS PROJECT SHALL BE INSTALLED IN STRICT ACCORDANCE
WITH MANUFACTURER'S RECOMMENDED SPECIFICATIONS FOR INSTALLATION.
5. CONTRACTOR(S) SHALL COORDINATE THE WORK OF THIS CONTRACT TO AVOID ANY
INTERFERENCE WITH ADJOINING AREAS.
6. ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS MUST BE SUBMITTED TO AMTECH
SOLUTIONS IN WRITING FOR APPROVAL.
7. CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE THE ADJACENT
CONSTRUCTION OF THE BUILDING. ANY DAMAGE SHALL BE CORRECTED BY THE CONTRACTOR
AT THEIR OWN EXPENSE.
8. CONTRACTOR SHALL PROVIDE ALL SAFE GUARDS, AS REQUIRED, TO PRECLUDE INJURY TO
AMTECH SOLUTIONS, THE OWNER'S AND CONTRACTOR'S PERSONNEL, AND TO ALL OTHER
PERSONS AT THE CONSTRUCTION SITE.
9. CONTRACTOR SHALL PERFORM ALL WORK AS INDICATED ON CONTRACT DOCUMENTS
INCLUDING BUT NOT LIMITED TO: ROOFING AND ASSOCIATED CURB AND PARAPET WALL
FLASHINGS AND MODIFICATIONS.
10. ALL SATELLITE RECEIVERS, ANTENNAS, EQUIPMENT SUPPORTS AND PENETRATIONS NOT
UTILIZED ARE TO BE REMOVED AND DISCARDED AS DIRECTED BY THE OWNER AND AMTECH
SOLUTIONS. ALL OPERATIONAL SATELLITE RECEIVERS, ANTENNAS, ETC. ARE TO BE REMOVED
AND RE-INSTALLED USING MANUFACTURER APPROVED DETAILS AS DIRECTED BY AMTECH
SOLUTIONS.
11. ANY EXISTING CABLES/CONDUITS LYING ON THE ROOF SHALL BE REMOVED AND/OR
RE-INSTALLED AS DIRECTED BY THE OWNER AND AMTECH SOLUTIONS.
12. AVOID PENETRATION SEALER POCKETS AT ROOF PENETRATIONS (INSTALL ONLY WHERE
REQUIRED AND APPROVED BY AMTECH SOLUTIONS).
13. WHERE EXISTING EXTERIOR LIGHTING AND ELECTRICAL EQUIPMENT INTERFERES WITH THE
CONSTRUCTION OF THE NEW ROOF, FASCIAS, OR SOFFITS, SUCH FIXTURES SHALL BE
REMOVED AND RE-INSTALLED TO THE SATISFACTION OF THE OWNER AND AMTECH
SOLUTIONS.
14. CONTRACTOR SHALL EXTEND EXISTING HVAC ROOF TOP UNITS AND INTERIOR DUCTWORK
THAT WILL BE DISTURBED DUE TO NEW WORK, INCLUDING BUT NOT LIMITED TO: CURBS,
DUCTWORK, PIPING, ELECTRICAL, ETC. IN ORDER TO MAINTAIN AN 8-INCH MINIMUM FLASHING
HEIGHT AS REQUIRED BY CODE, DUE TO INSTALLATION OF NEW ROOF SYSTEM.
15. ALL ROOF PIPE VENTS AND OTHER ROOF PENETRATION(S) SHALL BE EXTENDED UP TO
MAINTAIN AN 8-INCH MINIMUM FLASHING HEIGHT ABOVE NEW ROOF, AS REQUIRED BY CODE.
EXTENSIONS SHALL BE OF LIKE MATERIALS AND WELDED IF METAL.
16. ALL METAL FASCIA, COPINGS, LEADERS, SCUPPER BEAUTY PLATES, GUTTERS, DOWNSPOUTS, ETC. ARE TO BE FACTORY PRE-FINISHED (COLOR TO BE SELECTED AND APPROVED BY
OWNER).
17. SCUPPERS ARE TO BE MADE FROM GALVANIZED STEEL TO ALLOW FOR SOLDERED JOINTS.
18. ALL DIMENSIONS FOR ALL EXISTING CONSTRUCTION CONDITIONS ARE APPROXIMATE AND ARE
TO BE FIELD VERIFIED BY THE CONTRACTOR(S).
19. CONTRACTOR IS TO VERIFY LOCATION, COUNT AND SIZES OF ROOF PENETRATIONS AND
DRAINS PRIOR TO THE COMMENCEMENT OF WORK.
20. ALL NEW CONTINUOUS FLASHINGS ARE TO BE INSTALLED AT A CONSISTENT HEIGHT. MINIMUM
FLASHING HEIGHTS ARE TO BE CALCULATED AT INSULATION HIGH POINTS.
21. THE NEW ROOF SYSTEM AND PERFORMANCE IS TO ADHERE TO LOCAL BUILDING CODE AND
DESIGN WIND SPEED REQUIREMENTS AS SPECIFIED.
22. REFER TO ACCOMPANYING SPECIFICATIONS FOR ADDITIONAL INFORMATION.
23. SPECIFICATIONS ARE TO TAKE PRECEDENCE OVER CONFLICTING INFORMATION ON
DRAWINGS.
24. CONTRACTOR IS TO MAINTAIN PROPER DRAINAGE OF THE ROOF(S) THROUGH ALL PHASES OF
ROOF CONSTRUCTION.
25. ALL NAILERS ARE TO BE FLUSH WITH THE TOP OF ADJACENT SUBSTRATES.
26. CONTRACTOR TO CONFIRM ALL DRAIN LINE SIZES WITH CONSULTANT.
ROOFING NOTES:
1. WITH PRIOR APPROVAL BY OWNER, UP TO ONE WEEKS WORTH OF MATERIALS CAN BE STORED
ON THE ROOF, AS LONG AS THEY ARE ON PALLETS/CRIBBING, COVERED WITH TARPS (NO
PLASTIC) AND THE ROOF STRUCTURE IS NOT OVERLOADED. ADDITIONAL MATERIALS STAGED
ON THE ROOF MUST BE APPROVED BY OWNER AND CONSULTANT IN WRITING.
2. MATERIALS STORED ON THE GROUND SHOULD BE SECURED IN A FENCED IN AREA OR IN A
COVERED TRAILER TO ENSURE THEY ARE SECURE. ALL ONSITE STORAGE MUST FIRST BE
REVIEWED AND APPROVED BY BOTH THE OWNER AND CONSULTANT.
3. ALL MATERIALS SHALL BE KEPT DRY FROM STANDING WATER, FALLING WATER, AND
CONDENSATION WHEN ON THE GROUND AND ROOF.
4. BONDING ADHESIVES, MASTICS, CAULKING, ETC. ARE TO BE STORED BETWEEN 60 TO 80
DEGREES, AND NOT ALLOWED TO FREEZE.
5. THE CONTRACTOR IS TO TEAR-OFF, LAY-UP, AND COMPLETE DETAILS ON ROOF AREAS BY THE
END OF EACH WORKDAY.
6. ROOF DETAILING AND SHEET METAL INSTALLATION NEED TO FOLLOW CLOSELY BEHIND THE
ROOF MEMBRANE INSTALLATION.
7. NIGHT-SEALS ARE PARAMOUNT! CONTRACTOR IS REQUIRED TO TIE-IN THE NEW ROOF SYSTEM
TO THE EXISTING ROOF, SUCH THAT NO WATER CAN MIGRATE INTO THE NEW ROOF ASSEMBLY
AND/OR THE BUILDING.
8. THE AMBIENT TEMPERATURE REQUIREMENT FOR INSTALLATION IS 40 DEGREES AND RISING.
9. CONTRACTOR IS REQUIRED TO PROTECT ALL NEWLY INSTALLED ROOF MEMBRANES THAT
THEY WILL WORK OVER WITH CLEAN TARPS AND PLYWOOD.
10. ALL TRASH AND DEBRIS MUST BE REMOVED FROM THE ROOF SURFACE/LEVEL AS WELL AS
THE GROUNDS DAILY.
11. CONTRACTOR TO REPLACE ANY MISSING/ BROKEN DRAIN STRAINERS AND PARTS WITH NEW
TO MATCH EXISTING. ALL DRAINS STRAINERS AND CLAMPING RINGS ARE TO BE CLEANED,
PRIMED, AND PAINTED.
12. NEW 1
2-INCH (OR ONE SLOPE GREATER THAN EXISTING ROOF SLOPE) CRICKETS MUST BE
INSTALLED ON THE HIGH SIDE OF ALL CURBS AND PENETRATIONS WIDER THAN 24-INCHES.
13. NEW WALKWAY PADS ARE TO BE INSTALLED AS INDICATED ON THE ROOF PLANS AND AT ALL
LADDERS, ROOF HATCHES, RTU ACCESS PANELS, UNDER ALL SATELLITE SUPPORT SLEDS,
AND AROUND ALL SIDES OF SERVICEABLE MECHANICAL EQUIPMENT. NOT ALL WALK PADS ARE
SHOWN.
13.1. DO NOT INSTALL WALK PADS IN A MANNER THAT WILL CREATE WATER PONDING
CONDITIONS.
13.2. WALK PADS SHALL NOT BE INSTALLED OVER MEMBRANE SEAMS OR WITHIN VALLEYS.
14. ALL INSULATION BOARD JOINTS SHALL BE 1
8" OR LESS IN WIDTH. FILL ALL UNEVEN OR
OVERSIZED JOINTS.
15. MEMBRANE ADHESIVE APPLICATION MUST BE ALLOWED TO PROPERLY FLASH OFF BEFORE
MATING. ENSURE ADHESIVE IS DRY TO THE POINT OF BEING TACKY, BUT NOT STRINGY TO THE
TOUCH. DO NOT ALLOW ADHESIVE TO "DRY-OUT" COMPLETELY.
16. PROVIDE 4" LAP JOINTS FOR ALL SHEET METAL FLASHING RECEIVERS.
17. PROVIDE CURBS FOR ALL ROOF MOUNTED EQUIPMENT WITH A DECK OPENING OF 12-INCHES
OR GREATER.
18. ALL MEMBRANE SEAMS MUST BE STRIPPED-IN WITH A MINIMUM 6" WIDE SEMI-CURED COVER
TAPE.
19. ALL INSIDE AND OUTSIDE CORNER DETAILING TO BE INSTALLED PER MANUFACTURER
REQUIREMENTS AND R-503.
20. ELECTRIC METALLIC TUBE (EMT) CONDUITS MAY EXIST WITHIN THE HIGH FLUTES OF THE
METAL ROOF DECK AREAS. CONTRACTOR TO COORDINATE ACCESS TO INTERIOR ROOF AREAS
WITH OWNER AND IDENTIFY LOCATIONS WHERE EMT HAS BEEN INSTALLED WITHIN THE HIGH
FLUTES OF THE METAL DECK PRIOR TO TEAR OFF AND NEW ROOF INSTALLATION.
CONTRACTOR TO TAKE CARE NOT TO PENETRATE OR DAMAGE THE EXISTING EMT AND
ELECTRICAL WIRING COMPONENTS AS PART OF NEW ROOF INSTALLATION. ANY DAMAGE THAT
OCCURS AS A RESULT OF THE ROOF WORK WILL BE REPAIRED AND RETURNED TO
PRE-CONSTRUCTION CONDITION AT NO EXPENSE TO THE OWNER.
PLYWOOD SHEATHING FASTENING ILLUSTRATION:
ROOF ASSEMBLY ATTACHMENT SCHEDULE:
ROOF MATERIAL
ATTACHMENT
TYPE
ATTACHMENT MATERIAL
ZONE 1'
ATTACHMENT RATE
ZONE 1
ATTACHMENT RATE
ZONE 2
ATTACHMENT RATE
ZONE 3
ATTACHMENT RATE
MEMBRANE ADHESIVE BONDING ADHESIVE FULL COVERAGE FULL COVERAGE FULL COVERAGE FULL COVERAGE
COVER BOARD
(48"x48" BOARD)
- NOTE 3 -
MECHANICAL COATED SCREWS AND INSULATION PLATES (NOTE 2) 8 10 12 16
NOTES:
1. FASTENER AND PLATE PATTERNS ARE TO BE INSTALLED PER MANUFACTURER MINIMUM REQUIREMENTS. CONTRACTOR TO FOLLOW FASTENING AND BEAD SPACING RATES AS DEFINED WITHIN THE DESIGN DOCUMENTS WHERE FASTENING AND BEAD SPACING RATES ARE MORE STRINGENT THAN MANUFACTURER REQUIREMENTS. DO NOT INSTALL FASTENERS AND PLATES WITHIN 6-INCHES OF THE MATERIAL EDGE. FASTENERS ARE NOT TO PENETRATE THE BOTTOM FLUTES. CONTRACTOR TO VERIFY FASTENERS LENGTHS AND ENSURE FASTENERS PENETRATE THE TOP OF THE DECK FLUTES A
MINIMUM OF 3 4-INCH.
2. FASTENING RATES SHOWN FOR ZONES 1', 1, 2, AND 3 ARE FOR 48"x48" (4'x4') BOARDS. FASTENING PATTERNS MUST BE DOUBLED FOR 48"x96" (4'x8') BOARDS. TYPICAL.
(N) MIN. 1/2-INCH FIRE TREATED
CDX PLYWOOD @ ALL VERTICAL
SUBSTRATES. TYP.
FASTENER SCHEDULE:
ELEMENT SUBSTRATE FASTENER NUMBER AND SPACING
HORIZONTAL WOOD NAILER
CONCRETE BLOCK OR MASONRY WALL STAINLESS STEEL CONCRETE SCREWS
16'' O.C. MAX. STAGGERED (NOTE 1)
MINIMUM PULL-OUT RESISTANCE OF 1,000 POUNDS
HORIZONTAL WOOD NAILER 16 D GALVANIZED NAILS.
2 ROWS/9'' O.C. EACH ROW, MIN.
1-1/4'' PENET., MIN. PULLOUT RESISTANCE OF 100# (NOTE 1)
WOOD BLOCKING CONCRETE STAINLESS STEEL CONCRETE SCREWS
12'' O.C. MAX. STAGGERED (NOTE 1)
MINIMUM PULL OUT RESISTANCE OF 1,000 POUNDS
HOOK STRIP
WOOD #8 WOOD SCREWS 8'' O.C. MAX. (NOTE 1)
CONCRETE 3
16" STAINLESS STEEL NAIL-IN EXPANSION FASTENER 6'' O.C. MAX. (NOTE 1)
DRIP EDGE WOOD 4D RING SHANK NAILS.
SEE HOOK STRIP
2 ROWS/3"-4" O.C. MAX. STAGGERED (NOTE 1)
GRAVEL STOP
WOOD 4D RING SHANK NAILS.
SEE HOOK STRIP
2 ROWS/3"-4" O.C. MAX. STAGGERED (NOTE 1)
CONCRETE BLOCK OR MASONRY WALL
OUTSIDE-CONTINUOUS HOOK STRIP
INSIDE EDGE GALVANIZED ROOFING NAILS
SEE HOOK STRIP
12'' O.C. MAX. STAGGERED (NOTE 1)
TERMINATION BAR CONCRETE BLOCK OR MASONRY WALL 3
16" STAINLESS STEEL NAIL-IN EXPANSION FASTENERS 12'' O.C. MAX. (NOTE 1)
RTS/SEAM FASTENING PLATES
CONCRETE BLOCK OR MASONRY WALL 3
16" STAINLESS STEEL NAIL-IN EXPANSION FASTENERS
12'' O.C. MAX. (NOTE 1)
PLYWOOD/STEEL STUDS #15 CORROSION RESISTANT STEEL SCREWS
METAL FLASHING RECEIVER CONCRETE BLOCK OR MASONRY WALL 3
16" STAINLESS STEEL NAIL-IN EXPANSION FASTENERS 12'' O.C. MAX. (NOTE 1)
METAL COUNTER FLASHING METAL FLASHING RECEIVER #15 NEOPRENE WASHERED SELF-DRILLING SCREWS 8'' O.C. MAX. (NOTE 1)
PLYWOOD SHEATHING
(ILLUSTRATION BELOW)
METAL STUD FRAMING #15 CORROSION RESISTANT STEEL SCREWS
6" O.C. MAX. @ EDGES AND
12" O.C. MAX. IN THE FIELD @ EACH STUD LOCATION (NOTE 1)
CONCRETE BLOCK OR MASONRY WALL 3
16" STAINLESS STEEL NAIL-IN EXPANSION FASTENERS
NOTES:
1. FASTENER FREQUENCY SHALL BE DOUBLED WITHIN 10 FEET OF CORNERS.
4"
8"
6"
12"
12"
6"
6"
6"
6"
6"
6"
12"12"12"12" 12" 12"
12"
12"
ROOF RECOVER SCOPE OF WORK:
1. THIS SCOPE OF THIS PROJECT IS FOR A ROOF RECOVER OVER THE EXISTING EPDM ROOF
ASSEMBLY. THE EXISTING ROOF SYSTEMS CONSIST OF:
1.1. A FULLY ADHERED EPDM MEMBRANE OVER GYPSUM COVER BOARD OVER, ONE FULLY
ADHERED LAYER OF 4-INCH POLYISOCYANURATE INSULATION OVER, ONE MECHANICALLY
FASTENED LAYER OF 4-INCH POLYISOCYANURATE INSULATION, OVER AN EXISTING METAL
ROOF DECK.
2. CONTRACTOR TO RELIEF CUT EXISTING MEMBRANE (10'-0" x 10'-0" GRID PATTERN) PRIOR TO ROOF RECOVER INSTALLATION. ALL EXISTING ROOF LAYERS BELOW THE EXISTING MEMBRANE ARE TO REMAIN IN PLACE, WITH THE INSTALLATION OF A NEW ROOF RECOVER ASSEMBLY CONSISTING OF:
2.1. METAL DECK (STRUCTURAL SLOPE) - ALL ROOF AREAS - 1/R-102:
2.1.1. NEW 0.060-INCH (60 MIL) NON-REINFORCED BLACK EPDM MEMBRANE - (FULLY
ADHERED OVER)
2.1.2. NEW 12-INCH FIRE-TREATED, GYPSUM COVER BOARD WITH GLASS MAT FACERS (48" x
48" BOARDS) - R-0.56 - (MECHANICALLY ATTACHED THROUGH PREPARED EXISTING
ROOF ASSEMBLY BELOW TO DECK)
2.1.3. EXISTING ROOF SYSTEM OVER METAL ROOF DECK.
3. CONTRACTOR TO REMOVE AND REPLACE ALL WET OR DAMAGED INSULATION TO MATCH EXISTING.
LIGHTNING PROTECTION NOTES:
1. ROOFING CONTRACTOR TO COORDINATE WITH CERTIFIED LIGHTNING PROTECTION CONTRACTOR FOR ALL - ROOF, PARAPET WALLS, SCREEN WALLS, ETC. - EXISTING LIGHTNING PROTECTION
REMOVAL AND ONSITE STORAGE DURING CONSTRUCTION.
2. CONTRACTOR TO ENSURE ALL LIGHTNING PROTECTION COMPONENTS ARE COLLECTED AND
MAINTAINED DURING STORAGE.
3. ANY DAMAGED, BROKEN, OR MISSING COMPONENTS ARE TO BE DOCUMENTED AND SUBMITTED TO
THE OWNER AND CONSULTANT IN WRITING.
4. REFER TO ROOF PLANS FOR APPROXIMATE LIGHTNING PROTECTION LOCATIONS.
5. PROPOSED LIGHTNING PROTECTION PLAN AND REINSTALLATION METHODS AND CERTIFICATION AS
SHOWN WITHIN THESE DESIGN DOCUMENTS ARE TO BE A DEFERRED SUBMITTAL/DELEGATED
DESIGN COORDINATED BY THE ROOFING CONTRACTOR.
PROVIDE A 45° CHAMFER ALONG THE
TOP EDGE OF THE (N) PLYWOOD. TYP.
(N) PLYWOOD MUST EXTEND TO
THE DECK SURFACE (U.O.N.). TYP.
V.I.F.
BUTT PLYWOOD TIGHT TO BOTTOM
SIDE OF (N) PLYWOOD WOOD NAILER.
(N) NAILER FLUSH WITH PLYWOOD FACE.
(E) SUBSTRATE.
(E) ROOF DECK.
PLYWOOD SHEATHING FASTENING SECTION @ VERTICAL SUBSTRATES:
A-A
(A-A) PLYWOOD SHEATHING SECTION @ TOP OF PARAPET WALLS:
(ETR) MECHANICALLY
ATTACHED INSULATION.
(ETR) METAL OR WOOD DECK. V.I.F.
(N) BONDING ADHESIVE.
(N) ADHERED 12" GYPSUM COVER BOARD.
(N) EPDM MEMBRANE.
(N) FACTORY APPLIED
SEAM TAPE.
(N) 6" SEMI-CURED PRESSURE
SENSITIVE COVER TAPE.
ROOF SLOPE
(N) FASTENERS AND
INSULATION PLATES.
(E) MEMBRANE TO BE RELIEF
CUT WITH A MAXIMUM GRID
SPACING OF 10'-0" x 10'-0".
(ETR) ADHERED COVER BOARD.
(ETR) ADHERED INSULATION.
WEST
WING
EAST
WING
NOT IN
CONTRACT
NOT IN
CONTRACT
NOT IN
CONTRACT
PLOT SCALE IS 30x42
ISSUED FOR
SHEET NO.
SHEET TITLE
PROJECT
CLIENT
DATE REVISION
DRAWN BY
CHECKED BY
PROJECT NO.
DATE
LEGEND
OF
1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222
(303) 738-0823 | www.amtechsls.com
AMTECH
SOLUTIONS
KEYPLAN LEGEND
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
2801 WEST 9TH STREET
CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF
PROJECT
2801 WEST 9TH STREET
CRAIG, CO 81625
DEN.2023.001003
06/2023
1 ADDENDUM 108/21/2023
100% CONSTRUCTION DOCUMENTS
RKP & DD
IL
ROOF ASSEMBLIES
R-102 03 08
ROOF ASSEMBLY NOTES:
1. GENERAL:
1.1. VERIFY THAT SUBSTRATES ARE DRY, CLEAN, SMOOTH AND FREE OF SHARP EDGES, BURRS, DEEP DEPRESSIONS, LOOSE
MATERIAL, OIL, GREASE OR OTHER FOREIGN MATERIAL PRIOR TO INSTALLATION.
1.2. BEGINNING INSTALLATION MEANS ACCEPTANCE OF ALL EXISTING SURFACE CONDITIONS.
1.3. NEATLY CUT AND FIT MATERIALS AROUND PENETRATIONS AND PROJECTIONS.
1.4. ONLY DRY MATERIALS ARE TO BE INSTALLED AND ONLY AS MUCH AS CAN BE COMPLETED AND DETAILED THE SAME DAY.
1.5. ALL MATERIAL THAT HAS BECOME WET DURING STORAGE WILL BE MARKED AND REMOVED FROM THE JOBSITE BY THE
CONTRACTOR.
1.6. COORDINATE AND CONFIRM THAT MANUFACTURER'S ASSEMBLY MEETS OR EXCEEDS THE MINIMUM SPECIFIED ROOF
ASSEMBLY RATING.
1.7. LISTED ATTACHMENT CRITERIA ARE MINIMUMS; ADDITIONAL OR ENHANCED ATTACHMENT REQUIRED BY
MANUFACTURER'S IS TO BE PROVIDED AT NO ADDITIONAL COST.
2. BARE BACK EPDM MEMBRANES - NON-REINFORCED:
2.1. MEMBRANE SHEET MUST BE LOOSELY LAID OUT AND ALLOWED TO RELAX FOR A MINIMUM OF 30-MINUTES PRIOR TO
INSTALLATION.
2.2. BONDING ADHESIVES ARE TO BE APPLIED IN FULL COVERAGE, EVENLY, TO BOTH THE SUBSTRATE AND THE BACK OF THE
MEMBRANE SHEET.
2.3. ALLOW THE ADHESIVE TO DRY TO A POINT OF BEING TACKY, BUT NOT STRINGY TO THE TOUCH. DO NOT ALLOW
ADHESIVE TO “DRY OUT” COMPLETELY. THE MEMBRANE AND SUBSTRATE WILL BE DRY (NON-TACKY) TO THE FINGER
TOUCH.
2.4. ENSURE SHEETS ARE INSTALLED WITH LAPS SHINGLED IN THE DIRECTION OF THE ROOF SLOPE DRAINAGE, TO PREVENT
BACKWATER LAPS.
2.5. SHEET EDGES ARE TO BE LAPPED AT LEAST 3-INCHES, AS REQUIRED BY THE MANUFACTURER.
2.6. ALL HORIZONTAL AND VERTICAL MEMBRANE SEAMS ARE TO BE OVERLAID WITH A MANUFACTURER APPROVED, 6-INCH
SEMI-CURED COVER TAPE.
3. COVER BOARD:
3.1. BOARDS ARE TO BE INSTALLED WITH A MINIMUM 12-INCH MATERIAL STAGGER IN ALL DIRECTIONS.
3.2. GAPS BETWEEN BOARDS GREATER THAN 1
8-INCH ARE NOT ALLOWED. FILL GAPS WITH ADDITIONAL MATERIAL OR
LOW-RISE FOAM ADHESIVE.
(N) ROOF ASSEMBLY - BASE BID (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
ROOF ASSEMBLY LEGEND:
MAIN ROOF AREAS
A
ROOF ASSEMBLY PLAN
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
PLAN
NORTH
TRUE
NORTH
21' TYP.
21' TYP.
7' TYP.
21' TYP.
40'-0" MIN.
TYP. V.I.F.
21' TYP.
7' TYP.
21' TYP.
7' TYP.
21' TYP.
NOT IN
CONTRACT
NOT IN
CONTRACT
NOT IN
CONTRACT
7' TYP.
7' TYP.
PLAN
NORTH
TRUE
NORTH
PLOT SCALE IS 30x42
ISSUED FOR
SHEET NO.
SHEET TITLE
PROJECT
CLIENT
DATE REVISION
DRAWN BY
CHECKED BY
PROJECT NO.
DATE
LEGEND
OF
1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222
(303) 738-0823 | www.amtechsls.com
AMTECH
SOLUTIONS
KEYPLAN LEGEND
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
2801 WEST 9TH STREET
CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF
PROJECT
2801 WEST 9TH STREET
CRAIG, CO 81625
DEN.2023.001003
06/2023
1 ADDENDUM 108/21/2023
100% CONSTRUCTION DOCUMENTS
RKP & DD
IL
WIND DESIGN
R-200 04 08
B
ROOF WIND ZONE PLAN
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
ZONE 1 =
ZONE 2 =
ZONE 3 =
ZONE 1' =
WIND DESIGN NOTES:
1. DESIGN ASSUMPTIONS:
1.1. 2021 INTERNATIONAL EXISTING BUILDING CODE
1.1.1. ALTERATION LEVEL 1 - REMOVE AND REPLACE WITH LIKE.
1.2. 2021 INTERNATIONAL BUILDING CODE.
1.3. WIND DESIGN: ASCE 7-16
1.3.1. 3-SECOND PEAK GUST: 111 MPH
1.3.2. EXPOSURE: C
1.3.3. CLIMATE ZONES: 6B
1.3.4. CONFIGURATION: ENCLOSED
1.3.5. RISK CATEGORY: III
ASCE 7 - STRENGTH DESIGN VALUES:
1. MAIN ROOF AREAS:
1.1. DESIGN HEIGHT (H): 35-FEET
1.1.1. 0.6h: 21.0-FEET
1.1.2. 0.2h: 7.0-FEET
1.1.3. a: 8.0-FEET
1.2. ZONE 1' FIELD: -31.6 PSF
1.3. ZONE 1 FIELD: -55.0 PSF
1.4. ZONE 2 EDGE: -72.5 PSF
1.5. ZONE 3 CORNER: -98.7 PSF
1.6. ZONE 4 WALL FIELD: -37.4 PSF
1.7. ZONE 5 WALL CORNER: -46.3 PSF
0.6h 0.6h
0.6h
0.6h
0.6h
0.6h
0.2h
0.2h
ZONE 3
ZONE
1'
ZONE
ZONE
ZONE
ZONE 4 =
ZONE 5 =
ZONE 4
ZONE 5
a a h
1. CONTRACTOR TO REMOVE ONLY AS MUCH ROOFING PER DAY AS THEY ARE ABLE TO MAKE WATERTIGHT AND SECURE AT THE END OF THEIR WORK DAY. ANY DAMAGE CAUSED BY WEATHER OR OTHER ELEMENTS AS A RESULT OF UNFINISHED ROOFING WILL BE THE FULL RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR WILL REPLACE/REPAIR ALL INTERIOR AND EXTERIOR DAMAGE, RESULTING FROM
UNFINISHED/UNPROTECTED ROOF CONSTRUCTION AT THEIR OWN EXPENSE.
2. ALL CONDITIONS OR PENETRATIONS MAY NOT BE SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING
CONDITIONS AND MEASUREMENTS.
3. DETAIL CALL OUTS AND KEY NOTES MAY ONLY BE REFERENCED ONCE ON THE DRAWINGS. ONCE A PARTICULAR CALL OUT OR KEY NOTE HAS BEEN REFERENCED OR INDICATED BY LEGEND, IT MAY NOT BE REFERENCED AGAIN ON THE DRAWINGS, BUT ITS USE SHALL BE TYPICAL.
RTU
RTU
RTU RTU
RDOF
OF
OF
RD
OF
RD
RD
RD
RD
RD
RDOF
R-502
SIM
R-502
SI
M
R-500
TYP.
R-500
TY
P.
R-500
TYP.
R-500
TYP.
R-501
TYP.
R-500
TYP.
R-502
TYP.
R-501
TYP.
R-501TYP.
TYP.
R-502
TYP.
3a & b R-502
TYP.
TYP.
4a & b R-502
WEST
WING
EAST
WING
NOT IN
CONTRACT
NOT IN
CONTRACT
NOT IN
CONTRACT
R-502
TYP.
3a & b R-502
TYP.
R-502
TY
P.
R-502
TYP.
RD RD
RDRD OF
OF RD
OF
OF
OF
OF
OF
OF
R-500
TYP.
R-500
TYP.
R-500
TYP.
RR-EX. JT.
R-502
2 TYP. 2 TYP.
2TYP.
2 TYP.
R-501
R-501
GAS
E
R-###
SECTION AND DETAIL REFERENCE
NOT IN CONTRACT
ROOFING KEY NOTE
STRUCTURAL ROOF SLOPE
4" TAPERED ROOF SLOPE
RIDGE LINE
VALLEY LINE
PRIMARY ROOF DRAIN
OVERFLOW ROOF DRAIN
THRU-WALL ROOF DRAIN
THRU-WALL SCUPPER
OVERFLOW SCUPPER
ROOF HATCH
WALL-TO-ROOF EXPANSION JOINT
ROOF-TO-ROOF EXPANSION JOINT
EXISTING GAS LINE
EXISTING CONDUIT LINE
EXISTING LIGHTNING PROTECTION
HOT STACK PENETRATION
VENT PIPE PENETRATION
SOIL PIPE PENETRATION
DAVIT ARM PENETRATION
TIE-BACK ANCHOR PENETRATION
ELECTRICAL LINE PENETRATION
GAS LINE PENETRATION
PIPE PENETRATION
ROOF TOP UNIT
EXHAUST HOOD
EXHAUST FAN
MECHANICAL EQUIPMENT CURB
ABANDONED EQUIPMENT/CURB TO BE
REMOVED AT OWNERS DIRECTION
NEW 12" TAPERED CRICKETS WITH 6"
TAPERED EDGE STRIP
NEW WALKWAY PAD
SKYLIGHT
SPLASH BLOCK
ROOF AREA ELEVATION OFFSET
ROOFING DETAIL NUMBER
ROOFING PAGE NUMBER
RD
OF
WD
TWS
RH
EH
EF
RR-EX. JT.
RTU
SL
OFS
SP
VP
HS
TA
EP
WR-EX. JT.
MC
SB
DA
GP
PP
AB
KEYNOTES:
1. REINFORCE TOP EDGE OF ROOF AREA OFFSET CURB WITH AN
ADDITIONAL CONTINUOUS STRIPPING-PLY LAYER OF FULLY ADHERED
EPDM ALONG THE ENTIRE EXPOSED EDGE. NEW MEMBRANE TO
EXTEND A MINIMUM OF 3" ACROSS THE TOP OF THE MEMBRANE AND A
MINIMUM OF 3" DOWN THE VERTICAL FACE FROM THE CURB EDGE, TYP.
2. FIELD WRAP/DETAIL PER DRAWING DETAIL 4/R-501. TYP.
3. EXISTING SOFFIT OVERHANG:
3.1. DASHED LINE INDICATES APPROX. LOCATION OF ROOF TRANSITION
FROM FULL ASSEMBLY TO TONGUE AND GROOVE SOFFIT.
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND LOCATIONS.
3.2. EXISTING SOFFIT ASSEMBLY IS COMPRISED OF:
3.2.1. EPDM MEMBRANE FULLY ADHERED OVER,
3.2.2. PLYWOOD COVER BOARD ADHERED OVER,
3.2.3. EXPOSED TONGUE AND GROOVE DECKING.
3.3. NEW GYPSUM COVER BOARD ASSEMBLY TO BE MECHANICALLY
ATTACHED THROUGH THE EXISTING PLYWOOD COVER BOARD TO
THE EXISTING TONGUE AND GROOVE DECKING. FASTENERS ARE
TO EMBED A MINIMUM OF 1-INCH INTO THE EXISTING TONGUE AND
GROOVE DECKING AND ARE NOT TO PUNCTURE THROUGH OR BE
VISIBLE FROM BELOW.
GENERAL NOTES:
1. EXISTING LIGHTNING PROTECTION. REFER TO DRAWING PAGE R-101
AND R-501 OF REMOVAL AND REINSTALLATION NOTES, TYP.
2. CONTRACTOR TO COORDINATE WITH OWNER REGARDING REMOVAL,
STORAGE, AND REINSTALLATION OF EXISTING HEAT TRACE CABLES
AND ASSOCIATED SECUREMENT CLIPS, TYP.
C
ROOF PLAN
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY - SCALE: 3/32" - 1'-0"
PLAN
NORTH
TRUE
NORTH
PLOT SCALE IS 30x42
ISSUED FOR
SHEET NO.
SHEET TITLE
PROJECT
CLIENT
DATE REVISION
DRAWN BY
CHECKED BY
PROJECT NO.
DATE
LEGEND
OF
1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222
(303) 738-0823 | www.amtechsls.com
AMTECH
SOLUTIONS
KEYPLAN LEGEND
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
2801 WEST 9TH STREET
CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF
PROJECT
2801 WEST 9TH STREET
CRAIG, CO 81625
DEN.2023.001003
06/2023
1 ADDENDUM 108/21/2023
100% CONSTRUCTION DOCUMENTS
RKP & DD
IL
ROOF PLAN
R-300 05 08
(N) EPDM MEMBRANE.
REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
(N) PLYWOOD SHEATHING. TYP. - RE: R-101.
(N) ONE EDGE METAL ASSEMBLY. - RE: B/R-500.
END OF (N) MEMBRANE FLASHING. TYP.
(N) PERIMETER BLOCKING.
V.I.F.
V.I.F.
4" MIN. ABOVE FINISHED ROOF HEIGHT. TYP.
(N) BASE FLASHING - RE: A/R-500.
(E) SUBSTRATE.
(N) WATER CUT-OFF AND (N) TERM. BAR @
THE TOP OF (N) MEMBRANE FLASHING. TYP.
(N) SEAM FASTENING PLATES AND FASTENERS.
(N) 6" RUSS STRIP. TYP.
(N) EPDM MEMBRANE.
(N) PLYWOOD SHEATHING. TYP.
RE: R-101.
(ETR) SUBSTRATE.
NOTES:
1. REMOVE/REINSTALL/REPLACE
J-CHANNEL AS NEEDED AND
CUT BACK (E) METAL PANELS
AS NECESSARY TO ALLOW
FOR (N) FLASHING HEIGHTS.
3"
MIN. REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
3"
MIN.
8"
MIN.
(ETR) METAL PANEL SYSTEM AND J-CHANNEL.
* REFER TO NOTE 1 BELOW.
(N) PRE-FINISHED RECEIVER METAL WITH
VERTICAL INSIDE SLIP JOINT. TYP.
(N) PRE-FINISHED COUNTER FLASHING SET IN RECEIVER
METAL SLIP JOINT IN CONT. BED OF SEALANT. TYP.
6"
MIN.
8"
MIN.
3"
MIN.
BRING FLASHING MEMBRANE OVER TOP OF CURB AND
FASTEN TO BACK SIDE OF CURB WITH 1-1/4" HOT
DIPPED GALVANIZED NAILS @ 6" O.C. MAX. CURB CAP
TO BE SET IN (N) CONT. BEAD OF SEALANT.
(N) PRE-FINISHED METAL FLASHING OR (N) CURB
CAP FASTEN WITH (N) METAL BACKED FASTENERS
WITH NEOPRENE WASHERS @ 12" O.C. MAX. WITH
A MINIMUM OF 2 FASTENERS PER SIDE.
(N) WOOD NAILERS AS NEEDED TO MEET
MINIMUM FLASHING HEIGHTS. TYP.
(N) SEAM FASTENING PLATES AND FASTENERS.
(N) EPDM MEMBRANE.
(N) 6" RUSS STRIP. TYP.
REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
5 & 6 R-500
DOUBLE CUT (E) METAL CAP AS NEEDED TO ALLOW FOR (N) RECEIVER.
(N) SEALANT, (N) TERMINATION BAR AND (N) FASTENERS ATTACHED @ 12" O.C.
(N) PRE-FINISHED SLIP METAL COUNTER FLASHING SET IN (N)
CONTINUOUS URETHANE SEALANT FASTENED WITH (N) NEOPRENE
WASHERS @ 12" O.C. MAX. WITH A MINIMUM OF 2 FASTENERS PER SIDE.
NOTE:
ALTERNATE CURB FLASHING TO BE USED ONLY WHERE MEMBRANE CANNOT BE RUN OVER THE TOP OF THE CURB.
USE OF THIS ALTERNATE DETAIL MUST BE APPROVED BY THE ARCHITECT OR ROOF CONSULTANT 3"
MIN.
3"
MIN.
(E) CURB CAP CORNERS THAT HAVE
BEEN SPLIT FOR THE (N) MEMBRANE
FLASHING.
(N) 20-GAUGE L-METAL BEHIND THE (E)
METAL CAP FASCIA EDGE, FASTENED
ON BOTH SIDES WITH (N) NEOPRENE
WASHERED FASTENERS.
(N) 20-GAUGE METAL WIDTH
MUST MATCH THE HEIGHT OF
THE (E) CURB FASCIA EDGE.
OVERLAY CORNER REPAIR WITH
(N) UNCURED EPDM. TYP.
(N) PRE-MANUFACTURED 24 GA. (METAL-ERA)
FORMED SNAP-ON FASCIA COVER 12'-0" LENGTHS
WITH CONCEALED JOINT COVERS 4" WIDE.
(N) CONTINUOUS BEAD OF MANUFACTURER
APPROVED SEALANT (BY INSTALLER).
(N) #10 x 2" HEX HEAD SCREWS 12"
MAX. O.C. (BY APPROVED MANU).
(N) 20 GA. GALVANIZED STEEL RETAINER SECTION,
12'-0" LENGTHS PROVIDED WITH 9 36" HOLES, 12" O.C.
ROOFING CONTRACTOR TO VERIFY DIMENSIONS
IN FIELD. OUTSIDE FACE DIMENSION IS NOT TO
EXCEED 8" MAX. AND 4" MIN. ENSURE (N) CAP AND
PRE-FINISHED FASCIA EXTENDER CONCEALS ALL
OVERHANGING MEMBRANE AND (E) PAINT LINES.
INSTALL (N) SPRING
CLIPS 48" O.C.
(N) PRE-FINISHED 24 GA. OFFSET
METAL-ERA FASCIA EXTENDER.
(N) CONT. 20 GA. GALVANIZED CLEAT.
3"
MIN.
3"
MIN.
(N) EPDM FIELD MEMBRANE (FA).
(N) SEAM FASTENING PLATES. TYP.
WALL ASSEMBLY. - V.I.F. TYP.
(N) EPDM MEMBRANE FLASHING (FA). TYP.
(N) 6" RUSS STRIP. TYP.
PLOT SCALE IS 30x42
ISSUED FOR
SHEET NO.
SHEET TITLE
PROJECT
CLIENT
DATE REVISION
DRAWN BY
CHECKED BY
PROJECT NO.
DATE
LEGEND
OF
1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222
(303) 738-0823 | www.amtechsls.com
AMTECH
SOLUTIONS
KEYPLAN LEGEND
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
2801 WEST 9TH STREET
CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF
PROJECT
2801 WEST 9TH STREET
CRAIG, CO 81625
DEN.2023.001003
06/2023
1 ADDENDUM 108/21/2023
100% CONSTRUCTION DOCUMENTS
RKP & DD
IL
ROOFING DETAILS
R-500 06 08
(N) PERIMETER WALL FLASHING (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
GENERAL ROOF DETAIL NOTES:
1. PARAPET WALL/ ROOF EDGE FLASHINGS:
1.1. NEW MEMBRANES MUST EXTEND DOWN THE OUTSIDE FACE OF THE PARAPET WALL/ROOF EDGE A MINIMUM OF 2" PAST
THE BOTTOM WOOD NAILER.
1.2. FULLY ADHERE MEMBRANE TO THE PARAPET EXTERIOR.
1.3. MINIMUM 12"x12" WIDE UNCURED EPDM PATCHES MUST BE INSTALLED AT ALL MEMBRANE SEAM ANGLE CHANGES.
2. COUNTER FLASHINGS:
2.1. ALL EXISTING SURFACE MOUNTED COUNTER FLASHING METALS AND ASSOCIATED FASTENERS/SEALANTS ARE TO BE
REMOVED AND DISPOSED.
2.2. EXISTING REGLETS TO REMAIN IN PLACE ARE TO HAVE THEIR EXISTING SEALANTS RAKED OUT AND EXPOSED SURFACES
CLEANED PRIOR TO INSTALLATION OF NEW TOOLED-IN SEALANT.
2.3. EXISTING REGLETS TO BE DOUBLE-CUT AS NEEDED LEAVING 1" TO 2" OF EXISTING MATERIAL FOR NEW COUNTER
FLASHING TIE-IN.
2.4. NEW SEALANTS TO BE TOOLED-IN, CREATING A WATER SHEDDING SURFACE.
2.5. ENSURE ALL WEEP HOLES REMAIN EXPOSED.
2.6. INSTALL NEW LEAD WEDGES @ 8" O.C. MAX. FOR ALL REGLET COUNTER FLASHING CONDITIONS. TYP.
2.7. BEND COUNTER FLASHING METALS 90-DEGREES @ END LOCATIONS, TO MEET FLUSH WITH WALL SUBSTRATE AND SEAL
WITH NEW URETHANE SEALANT. TYP.
3. THRU-WALL/OVERFLOW SCUPPERS:
3.1. NEW PRE-FINISHED BEAUTY PLATES ARE TO MATCH EXISTING BEAUTY PLATE DIMENSIONS @ A MINIMUM.
3.2. ENSURE ALL SUN/PAINT LINES ARE CONCEALED. TYP.
3.3. CUT/DEMO EXISTING WALL SUBSTRATES AS NECESSARY TO ALLOW FOR INSTALLATION OF THE NEW SCUPPER SLEEVE
DIMENSIONS. TYP.
3.4. OVERFLOW OPENING TO BE CUT ON THE SIDE OF NEW CONDUCTOR HEADS PER SMACNA REQUIREMENTS.
4. ROOF DRAINS:
4.1. STANDARD DRAIN SUMPS ARE 8'-0" x 8'-0". REFER TO ROOF PLAN ON R-300 FOR ELONGATED DRAIN SUMPS THAT EXCEED
THE MINIMUM DIMENSIONS.
4.2. REMOVE ALL LEAD AND OTHER FLASHINGS.
4.3. REMOVE THE EXISTING CLAMPING RING AND STRAINER TO ALLOW FOR THE NEW FLASHING INSTALLATION.
4.4. RAISE/LOWER EXISTING DRAIN BOWL AS NEEDED TO ACCOMMODATE NEW ROOF ROOF ASSEMBLY THICKNESS.
4.5. CONTRACTOR TO WATER TEST ALL PRIMARY AND OVERFLOW DRAINS PRIOR TO CONSTRUCTION TO ENSURE DRAINS HAVE
PROPER FLOW AND NO BLOCKAGE.
4.6. ALL STRAINERS AND CLAMPING RINGS TO BE CLEANED, PRIMED AND PAINTED BEFORE REINSTALLATION, PER THE
SPECIFICATION REQUIREMENTS.
4.7. ALL BOLTS OR CLAMPS MUST BE IN PLACE TO PROVIDE CONSTANT COMPRESSION ON WATER CUT-OFF-MASTIC.
4.8. CUT THE MEMBRANE SO IT EXTENDS 1-INCH, FROM THE ATTACHMENT POINTS OF THE DRAIN CLAMPING RING.
4.9. FIELD SPLICES MUST BE LOCATED AT LEAST 6 INCHES OUTSIDE THE DRAIN SUMP.
4.10. MEMBRANE SEAMS SHALL NOT PASS THROUGH THE DRAIN SUMP.
5. EXPANSION JOINTS:
5.1. EXPANSION JOINTS ARE TO BE INSTALLED WITH THE NEW MEMBRANE UNDER AND OVER TOP OF APPROVED ROD STOCK.
5.2. NEW INSULATION RETAINERS WITH COMPRESSIBLE INSULATION IS TO BE FASTENED TO THE EXISTING SUBSTRATES AND
NEW WOOD BLOCKING @ 12" O.C. TYP.
(N) COUNTERFLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(N) TYPICAL CURB FLASHING DETAIL
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(N) ALTERNATE CURB FLASHING DETAIL
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(E) MECHANICAL CURB CORNER REPAIR DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
A
EPDM BASE FLASHING (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
B
PERIMETER EDGE METAL ASSEMBLY (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
3"
MIN.
(N) SEAM FASTENING PLATES
AND FASTENERS. TYP.
BOTH SIDES OF (N) ROOF
MEMBRANE EXTENDED OVER
TOP OF (N) BLOCKING. TYP.
(N) 6" RUSS STRIP. TYP.
(N) INSULATION RETAINER
AND INSULATION
FASTENED @ 12" O.C. TYP.
3"
MIN.
REFER TO R-102 FOR
FULL ROOF ASSEMBLY. REFER TO R-102 FOR
FULL ROOF ASSEMBLY.
8"
MIN.
(N) FIRE TREATED BUILT-UP
WOOD NAILERS FASTENED
TO DECK @ MAX. 12" O.C.
(N) OVERSIZED CONT. ROD-STOCK OVER
EPDM WITH SEPARATOR SHEET BETWEEN
TOP OF ROD-STOCK AND MEMBRANE TYP.
(N) EPDM STRIPPING-PLY (FA)
OVER TOP OF (N) ROD-STOCK
AND EXPANSION JOINT. TYP.
(N) SEALANT. TYP.
(N) PRE-FABRICATED
PIPE FLASHING. TYP.
CUT PIPE FLASHING TO ENSURE
SNUG FIT AROUND PIPE. TYP.
(N) STAINLESS STEEL
CLAMPING RING. TYP.
4" to 6"
FIELD SEAM
JOINT COVER @ ALL FLASHING-TO-SEAM
INTERSECTION LOCATIONS.
(N) EPDM MEMBRANE.
TAPED/ADHERED SEAMS. TYP.
(E) PENETRATION.
12"MIN. CUT OFF IF REQUIRED
(N) LAP SEALANT. TYP.
REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
8" M
IN
(ETR) PENETRATION.
3" OR GREATER
FIELD SEAM
(N) MIN. 6" WIDE PRESSURE SENSITIVE FLASHING
IN CONJUNCTION WITH EPDM PRIMER.
(N) BUILT UP FIRE TREATED WOOD BLOCKING TO
MATCH THE HEIGHT OF THE (N) ROOF ASSEMBLY,
FASTENED TO THE ROOF DECK @ 6" O.C.
(N) SHEET METAL DAM FASTENED TO
THE (N) WOOD BLOCKING WITH
PANCAKE HEAD SCREWS @ 8" O.C. TYP.
3" MIN.
(N) SHEET METAL RAIN COLLAR SET IN
(N) URETHANE SEALANT WITH A (N)
STAINLESS STEEL CLAMPING RING.
8"
MIN. (N) LAP SEALANT. TYP.
REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
JOINT COVER @ ALL FLASHING-TO-SEAM
INTERSECTION LOCATIONS.
(ETR) PENETRATION.
(N) EPDM MEMBRANE.
(N) MEMBRANE EXTENDED 2" MIN.
ONTO ADJACENT WALL AROUND
ALL 3 SIDES. TYP.
(N) T-BAR FASTENED @ 6" O.C.
MAX. AROUND ALL 3 SIDES. TYP.
(N) MEMBRANE FULLY ADHERED
AND EXTENDED DOWN FACE OF
VERTICAL WALL. TYP.
EXTERIOR
INTERIOR
(N) CONT. TOOLED IN SEALANT. TYP.
(N) TWO-PIECE CLOSURE METAL
AROUND ALL 3 SIDES. TYP.
TOP OF PARAPET WALL. TYP.
V.I.F.
(N) VERTICAL CLOSURE SHEET METAL
TO BE INSTALLED OVER (N) VERTICAL
TERMINATION BAR @ ALL VERTICAL
WALL TERMINATIONS.
(ETR) PENETRATION.
6" to 18"
FIELD SEAM
(N) EPDM MEMBRANE.
TAPED/ADHERED SEAMS. TYP.
(N) MEMBRANE BASE FLASHING. TYP.
8" M
IN
(N) LAP SEALANT. TYP.
REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
REFER TO R-102
FOR FULL ROOF
ASSEMBLY.
JOINT COVER @ ALL FLASHING-TO-SEAM
INTERSECTION LOCATIONS.
GRIND OFF (E) PAINT
TO PROVE CLEAN
STEEL SURFACE FOR
EPDM FLASHING, TYP.
METAL BASE PLATE. TYP.
LIGHTNING ROD. TYP.
36" MAX.
SPACING. TYP.
36" MAX.
SPACING. TYP.
CABLE. TYP.
(N) MANU. APPROVED TWO PART
POURABLE SEALER OR POLYETHER
ADHESIVE/SEALANT @ ALL BASE
PLATE LOCATIONS. TYP.
(N) PMMA OR EPDM
MEMBRANE SURFACE. TYP.
NOTES:
· ROOFING CONTRACTOR TO COORDINATE WITH CERTIFIED LIGHTNING PROTECTION CONTRACTOR FOR
ALL - ROOF, PARAPET WALLS, SCREEN WALLS, ETC. - (E) LIGHTNING PROTECTION REMOVAL AND ONSITE
STORAGE DURING CONSTRUCTION.
· CONTRACTOR TO ENSURE ALL LIGHTNING PROTECTION COMPONENTS ARE COLLECTED AND MAINTAINED
DURING STORAGE.
· ANY DAMAGED, BROKEN, OR MISSING COMPONENTS ARE TO BE DOCUMENT AND SUBMITTED TO AMTECH
AND THE OWNER IN WRITING.
· REFER TO ROOF PLANS FOR APPROXIMATE LIGHTNING PROTECTION LOCATIONS.
· PROPOSED LIGHTNING PROTECTION PLAN AND REINSTALLATION METHODS AND CERTIFICATION AS
SHOWN WITHIN THESE DESIGN DOCUMENTS ARE TO BE A DEFERRED SUBMITTAL/ DELEGATED DESIGN
COORDINATED BY THE ROOFING CONTRACTOR.
(N) EPDM ROOF SYSTEM(ETR) EPDM ROOF SYSTEM
6" MIN.
12" WIDE CONT. CURED EPDM STRIPPING PLY. TYP.
(ETR) ROOF
ASSEMBLY.
(ETR) EPDM ROOF
MEMBRANE.
(N) FASTENERS AND PLATES @ 12" O.C. MAX.
AROUND FULL PERIMETER OF EPDM REPAIR
WHERE (N) EPDM TIES INTO (ETR). TYP
(N) EPDM ROOF
MEMBRANE (FA).
(N) COVER BOARD
ENSURE TIE-IN DETAIL WILL NOT CREATE
PONDING DUE TO EXISTING CONDITIONS.
PLOT SCALE IS 30x42
ISSUED FOR
SHEET NO.
SHEET TITLE
PROJECT
CLIENT
DATE REVISION
DRAWN BY
CHECKED BY
PROJECT NO.
DATE
LEGEND
OF
1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222
(303) 738-0823 | www.amtechsls.com
AMTECH
SOLUTIONS
KEYPLAN LEGEND
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
2801 WEST 9TH STREET
CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF
PROJECT
2801 WEST 9TH STREET
CRAIG, CO 81625
DEN.2023.001003
06/2023
1 ADDENDUM 108/21/2023
100% CONSTRUCTION DOCUMENTS
RKP & DD
IL
ROOFING DETAILS
R-501 07 08
(N) EXPANSION JOINT DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(N) PRE-FABRICATED PENETRATION FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
HOT FLUE PENETRATION FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(N) PARAPET FLASHING @ ADJACENT WALL TIE-IN DETAIL
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(N) VERTICAL TERMINATION DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
LIGHTNING PROTECTION BASE PLATE ATTACHMENT (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(N) FIELD WRAPPED FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(N) TO (E) EPDM TIE-IN DETAIL (TYPICAL)
AA
(E) DRAIN BOWL - RAISE AS NECESSARY TO PROVIDE
SMOOTH TRANSITION TO ROOF ASSEMBLY. TYP.
RE: 'TAP AND DIE' NOTES.
(E) DECK.
AA
REFER TO R-102
FOR FULL ROOF
ASSEMBLY
REFER TO R-102
FOR FULL ROOF
ASSEMBLY
(N) 12" x 12" TAPERED EDGE
DRAINAGE SUMP.
VERIFY IN FIELD. TYP.
USING A 18" DRILL BIT, DRILL WEEP HOLES
(MIN. OF 4) @ BASE OF THE OVERFLOW
COLLAR TO ALLOW FOR PONDING DRAINAGE.
REPLACE ALL BROKEN/ MISSING/ BEE-HIVE
OR PLASTIC DRAIN STRAINERS WITH (N)
STEEL OR ALUMINUM STRAINERS. TYP.
(N) WATER CUT-OFF MASTIC BEHIND ROOF
MEMBRANE. ENSURE MEMBRANE IS CUT
BACK TO A MINIMUM OF 1" FROM THE
CLAMPING RING. TYP. REFER TO A-A.
TAP AND DIE NOTES:
1. (E) DRAIN BOWL AND LEADERS TO REMAIN.
2. CLEAN, PRIME, AND PAINT (E) DRAIN BOWL ASSEMBLY.
3. ALL (E) CLAMPING RINGS AND STRAINERS TO BE REPLACED WITH (N).
4. TAP AND DIE (E) DRAIN BOWL BOLT CONNECTIONS AS REQUIRED TO
ENSURE DRAIN FLASHINGS AND CLAMPING RINGS ARE ADEQUATELY
SEALED AND MADE WATER TIGHT. NOTIFY AMTECH AND ADAMS COUNTY
PRIOR TO COMMENCING ANY AND ALL WORK THAT WOULD REQUIRE TAP
AND DIE OF EXISTING CONDITIONS.
5. INSTALL A (N) CONT. BED OF WATER CUT-OFF MASTIC BETWEEN THE TOP
OF THE DRAIN BOWL AND MEMBRANE FLASHING, ENSURING THE FLASHING
IS FULLY COMPRESSED BY THE CLAMPING RING ONCE INSTALLED.
(N) 12" x 12" TAPERED EDGE
DRAINAGE SUMP.
REPLACE ALL BROKEN/ MISSING/
BEE-HIVE OR PLASTIC DRAIN
STRAINERS WITH (N) STEEL OR
ALUMINUM STRAINERS. TYP.PRIMARYOVERFLOW
(N) COVER BOARD. TYP.
(N) EPDM
WALL/ CURB
FLASHING. TYP.
3" M
IN.
(N) UNCURED EPDM
CORNER FLASHING
(BOTTOM LAYER). TYP.
(N) BASE
FLASHING AND
RTS STRIP. TYP.
VERTICAL LAP
SPLICE @
MEMBRANE
FLAP. TYP.
(N) EPDM WALL
FLASHING. TYP.
(N) EPDM FIELD
MEMBRANE. TYP.
STEP 1
(N) 6" WIDE
UNCURED
EPDM
FLASHING (TOP
LAYER). TYP.
(N) CONT.
BEAD OF
SEALANT.
TYP.
(N) CONT.
BEAD OF
SEALANT.
TYP.
3"
MIN.
2"
MIN.
STEP 2
(N) EPDM FIELD
MEMBRANE. TYP.
(N) BASE
FLASHING AND
RTS STRIP. TYP.
RE: A/R-500.
(N) EPDM
CURB
FLASHING.
TYP.
3"
MIN.
3"
MIN.
STEP 1
(N) UNCURED
EPDM OUTSIDE
CORNER
FLASHING. TYP.
(N) CONT.
BEAD OF
SEALANT.
TYP.
STEP 2
(N) WATER CUT-OFF MASTIC BEHIND
ROOF MEMBRANE. ENSURE MEMBRANE
IS CUT BACK TO A MINIMUM OF 1" FROM
THE CLAMPING RING. TYP.A-A
(ETR) RIGID INSULATION. V.I.F.
(ETR) ROOF EDGE BLOCKING. V.I.F.
(ETR) SHIM. V.I.F.
(ETR) ALUMINUM BENT PLATE. V.I.F.
(N) JOINT SEALANT
(N) CONTINUOUS GALVANIZED CLEAT
EXTEND (N) MEMBRANE
ROOF OVER PLYWOOD
(N) PRE-FINISHED METAL GRAVEL STOP DRIP
EDGE, COLOR TO MATCH METAL PANEL. TYP.
(N) SHEATHING FASTENED AT 12-INCHES O.C.
STAGGERED TO ENSURE ALIGNMENT WITH (N)
ROOF SYSTEM ELEVATION
(N) CONT. BEAD OF LAP SEALANT
(N) MEMBRANE ROOF FLASHING
(N) COVER BOARD.
12" V.I.F.
(ETR) PLYWOOD SHEATHING.
(E) HVAC UNIT, ENSURE THAT FINISHED
CURB HEIGHT COMPLIES WITH CODE
AND GUARANTY REQUIREMENTS.
6"
MIN.
NOT ALL CONDITIONS ARE SHOWN
ADHERED/TAPED SEAM WITH
6" COVER STRIP.
CUT BACK (E) ROOF MEMBRANE, LEAVING
A MIN. OF 6" OF OVERHANG.
(N) ROOF MEMBRANE AS SPECIFIED.
APPROVED SEALANT, TERMINATION BAR
AND FASTENER ATTACHED @ 8" O.C.
BONDING ADHESIVE.
(N) WATER CUT-OFF MASTIC.
THIS DETAIL IS TO ONLY BE
USED AT LARGE MECHANICAL
EQUIPMENT THAT CANNOT BE
LIFTED TO ALLOW FOR THE
NEW MEMBRANE TO BE
EXTENDED OVER THE TOP OF
THE CURB, WHERE NEW SLIP
COUNTER FLASHING CANNOT
BE INSTALLED, AND WHERE
FLASHINGS HEIGHTS EXCEED
8", AS SHOWN IN STANDARD
CURB FLASHING DETAIL.
USE OF THIS ALTERNATE
DETAIL MUST BE APPROVED
BY THE ROOF CONSULTANT.
PLOT SCALE IS 30x42
ISSUED FOR
SHEET NO.
SHEET TITLE
PROJECT
CLIENT
DATE REVISION
DRAWN BY
CHECKED BY
PROJECT NO.
DATE
LEGEND
OF
1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222
(303) 738-0823 | www.amtechsls.com
AMTECH
SOLUTIONS
KEYPLAN LEGEND
COLORADO NORTHWESTERN
COMMUNITY COLLEGE
2801 WEST 9TH STREET
CRAIG, CO 81625
CNCC ACADEMIC BUILDING ROOF
PROJECT
2801 WEST 9TH STREET
CRAIG, CO 81625
DEN.2023.001003
06/2023
1 ADDENDUM 108/21/2023
100% CONSTRUCTION DOCUMENTS
RKP & DD
IL
ROOFING DETAILS
R-502 08 08
(E) PRIMARY AND OVERFLOW DRAIN SUMP AND FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
3a
(N) INTERIOR CORNER FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
3b
(N) INTERIOR CORNER FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
4a
(N) EXTERIOR CORNER FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
4b
(N) EXTERIOR CORNER FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
(E) ALUMINUM CHANNEL FLASHING DETAIL (TYPICAL)
NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)
LARGE HVAC TIE-IN DETAIL (TYPICAL)
Meeting Date:
Project:
Place/Room:
Facilitator:
Firm Representative Phone E-Mail
B&M Roofing of CO Inc Scott Kawulok 303-443-5843 skawulok@bmroofing.com
Amtech Solutions Robert Piane, 970-485-9618
Douglass Colony Group Michael Cohig MCoohig@douglasscolony.com
Superior Roofing Alex Hannum 720-490-6299 ahannum@superiorroofing.com
Pitt Roofing Inc Dianna Harrison 435-789-6898 pittroofinginc@outlook.com
Shawn Logan CMC Roofing 720-537-0175 shawnlogan@cmcroofing.com
CNCC FY24-001 Academic Building Roof, Recover
Virtual, 2:30 PM
Hailee Russell & Lindsey Blake
Thursday, August 17, 2023
Meeting Sign-In Sheet
PRE-BID
CONFERENCE
AUGUST 17,2023
C N C C F Y 2 3 - 0 0 7
S O L I C I T A T I O N N O : F Y 2 4 - 0 0 1
A C A D E M I C B U I L D I N G R O O F R E C O V E R
C R A I G C A M P U S
MEETING OVERVIEW
• Sign in please – This pre-bid meeting is mandatory, CNCC will only accept bids from firms who are in attendance.
• Questions – Feel free to interrupt any anytime with questions. Scope related questions, please submit in writing to the Purchasing Coordinator, an Addendum will be posted with answers.
• Project Description
• Schedule
PROJECT
DESCRIPTION
PROJECT
DESCRIPTION
CON’T
• Project may have prevailing wage requirements if contract is $500k or greater.
• Building will be occupied: CNCC will coordinate with selected contractor to vacate space below work.
MINIMUM
REQUIREMENTS
SCHEDULE
QUESTIONS
• Scope of work questions please submit to Hailee Russell, CNCC
Purchasing Coordinator:
• Hailee.Russell@cncc.edu mailto:Hailee.Russell@cncc.edu
| CNCC FY24-001 -Addendum 1 |
| 20230821_CNCC Academic Bldg Roof_Addendum 1 |
| 20230821 CNCC Roof Replacement Drawings_A1 |
| Sheets and Views |
| 20230821 CNCC Roof Replacement Drawings_A1-R-100-COVER SHEET |
| 20230821 CNCC Roof Replacement Drawings_A1-R-101-DESIGN NOTES |
| 20230821 CNCC Roof Replacement Drawings_A1-R-102-ROOF ASSEMBLIES |
| 20230821 CNCC Roof Replacement Drawings_A1-R-200-WIND DESIGN |
| 20230821 CNCC Roof Replacement Drawings_A1-R-300-PLANS |
| 20230821 CNCC Roof Replacement Drawings_A1-R-500-ROOFING DETAILS |
| 20230821 CNCC Roof Replacement Drawings_A1-R-501-ROOFING DETAILS |
| 20230821 CNCC Roof Replacement Drawings_A1-R-502-ROOFING DETAILS |
| Sign-In Sheet - CNCC FY24-001 |
| Pre – Bid FY24-001 |
| Slide 1: Pre-Bid Conference August 17,2023 |
| Slide 2: Meeting Overview |
| Slide 3: Project description |
| Slide 4: Project Description Con’t |
| Slide 5: Minimum Requirements |
| Slide 6: Schedule |
| Slide 7: Questions |
File details come from the government source that posted it. Updated .