CNCC FY24-001 - Addendum 2.pdf

PDF 2 MB Posted

Attached to
Academic Building Roof Repair, Recover
Solicitation number
CNCC FY24-001
Issued by
Ouray County, Colorado

About this file

Addendum #2 for the Colorado Northwestern Community College (CNCC) Academic Building Roof Repair and Recover project details modifications and clarifications to the original bid documents. The addendum, issued on August 22nd, 2023, addresses two key questions from potential bidders: a request to substitute EPDM membrane with TPO (which was declined), and a technical inquiry about installation methods for fire-rated board at the building's wood overhang. The document provides specific guidance on mechanical attachment of materials, requiring contractors to ensure fasteners penetrate the tongue and groove decking to a minimum 1-inch depth without compromising the exposed soffit.

The project, located at 2801 W. 9th Street in Craig, Colorado, involves a roof recover for the Academic Building, with a scope that includes removing existing roof systems, installing a new fully adhered black EPDM membrane, and applying a new aggregate embedded asphalt flood coat. The project is part of CNCC FY23-010 and may trigger prevailing wage requirements if the contract exceeds $500,000. The mandatory pre-bid conference was held virtually on August 17th, 2023, with sealed bids due on August 25th, 2023, at 9:00 AM. The anticipated construction start is scheduled for September-October 2023, with an expectation of substantial completion within 30 calendar days from the Notice to Proceed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #2 August 22nd, 2023

CNCC FY23-010

Academic Building Roof Repair, Recover

Addendum #2

Questions/Answers:

1. We are wondering if we would be able to substitute the EPDM membrane for TPO and bid TPO on this project?

a. Answer: CNCC does not anticipate using TPO.

2. Over the finished wood overhang along the front of both sections of roofing about 6 foot out, there is existing material that is glued directly to the plywood decking that appears to be directly over the finished wood planking exposed on the soffit. To install the required fire rated board, the screws for attachment must extend ¾” beyond the substrate being attached to, laving screws sticking out of the soffit. I recommend removing the material over this area and fully adhering the fire board to the decking.

This will add a bit of cost but is necessary to complete properly. There is also some positive pressure causing ballooning on a large HVAC unit that will need to be addressed as well.

a. Answer: Based on roof coring previously performed, the subject soffit area consists of a 2” thick tongue and groove decking with an adhered plywood above it. Contractor will be responsible for providing mechanical attachment that will not penetrate the underneath side of exposed tongue and groove decking at soffits.

Mechanical attachment will be required to penetrate tongue and groove decking minimum 1” depth. See forthcoming Addendum #01 for additional information.

End of Addendum #1.

1720 South Bellaire Street Suite 1200 Denver, Colorado 80222 Tel: (303) 738-0823 www.amtechsls.com

ADDENDUM 1

DATE: August 21, 2023 TO: Invited Roofing Contractor Bidder RE: Addendum One (1) PROJECT: CNCC Academic Building Roof Project 2801 West 9th Street Craig, CO 81625

PROJECT NO.: DEN.2023.001003

To Whom it May Concern:

The following changes, clarifications and/or corrections to the bid documents and schedule are made subsequent to the pre-bid meeting held Thursday, August 17, 2023. Please note the following items/modifications to the scope of project to be included as part of the bid:

1. Drawing Sheet R-102:

a. Roof plan A was updated to reflect in-scope roof areas.

b. Roof assembly detail 1 was updated to clarify existing roof conditions.

2. Drawing Sheets R-200:

a. Roof plan B was updated to reflect in-scope roof areas.

3. Drawing Sheet R-300:

a. Roof plan C was updated to reflect in-scope roof areas.

b. Callouts on roof plan C and Keynote 3 were added or edited for clarity.

4. Detail 5 on sheet R-502 was revised for clarity.

The full drawing set with the revised sheets referenced above has been included at the end of this Addendum.

This Addendum does not include a date change for submission of proposals.

This Addendum does not include a time extension for the performance of work described herein.

Receipt of this addendum is to be acknowledged on the submitted Bid Form.

Sincerely, Robert Piane, AIA, NCARB General Manager Denver Email: robertpiane@amtechsls.com

End of Addendum 1 mailto:robertpiane@amtechsls.com

VICINITY MAP:REGION MAP:

ROOF WORK AREAS

TRUE

NORTH

· R-100 COVER SHEET

· R-101 DESIGN NOTES

· R-102 ROOF ASSEMBLIES

· R-200 WIND DESIGN

· R-300 ROOF PLAN

· R-500 ROOFING DETAILS

· R-501 ROOFING DETAILS

· R-502 ROOFING DETAILS

SHEET INDEX:

AERIAL MAP:

APPLICABLE DESIGN CODES:

1. 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)

2. 2021 INTERNATIONAL BUILDING CODE (IBC)

3. 2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

4. BUILDING DATA:

4.1. FIRE SPRINKLED.

4.2. MONITORED ALARM.

4.3. CONSTRUCTION TYPE III - NON-COMBUSTIBLE:

4.3.1. STEEL FRAMING WITH METAL PANEL DECKING.

4.4. OCCUPANCY CLASSIFICATION:

4.4.1. GROUP B - BUSINESS

ABBREVIATIONS:

CONT. CONTINUOUS

(E) EXISTING

(ETR) EXISTING TO REMAIN

(FA) FULLY ADHERED

GA. GAUGE

GALV. GALVANIZED

GYP. GYPSUM

MAX. MAXIMUM

(MA) MECHANICALLY ATTACHED

MTL METAL

MIN. MINIMUM

(N) NEW

O.C. ON CENTER

REQ. REQUIREMENT

R.T.S. REINFORCED TERMINATION STRIP

SIM. SIMILAR

TYP. TYPICAL

V.I.F. VERIFY IN FIELD

PLOT SCALE IS 30x42

ISSUED FOR

SHEET NO.

SHEET TITLE

PROJECT

CLIENT

DATE REVISION

DRAWN BY

CHECKED BY

PROJECT NO.

DATE

LEGEND

OF

1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222

(303) 738-0823 | www.amtechsls.com

AMTECH

SOLUTIONS

KEYPLAN LEGEND

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

2801 WEST 9TH STREET

CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF

PROJECT

2801 WEST 9TH STREET

CRAIG, CO 81625

DEN.2023.001003

06/2023

1 ADDENDUM 108/21/2023

100% CONSTRUCTION DOCUMENTS

RKP & DD

IL

DESIGN NOTES

R-100 01 08

AMTECH SOLUTIONS, INC.

1720 SOUTH BELLAIRE STREET, SUITE 1200

DENVER, COLORADO 80222

TEL: (303) 738-0823

WEBSITE: WWW.AMTECHSLS.COM

OWNER:PROJECT: CONSULTANT:

AMTECH

SOLUTIONS

CNCC 23-007 - CRAIG, CO - SUMMER 2023 - AMTECH PROJECT NO.: DEN.2023.001003

2801 WEST 9TH STREET, CRAIG, CO 81625

2801 WEST 9TH STREET, CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF PROJECT

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

CNCC ACADEMIC BUILDING ROOF PROJECT

2801 WEST 9TH STREET,

CRAIG, CO 81625

PLOT SCALE IS 30x42

ISSUED FOR

SHEET NO.

SHEET TITLE

PROJECT

CLIENT

DATE REVISION

DRAWN BY

CHECKED BY

PROJECT NO.

DATE

LEGEND

OF

1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222

(303) 738-0823 | www.amtechsls.com

AMTECH

SOLUTIONS

KEYPLAN LEGEND

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

2801 WEST 9TH STREET

CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF

PROJECT

2801 WEST 9TH STREET

CRAIG, CO 81625

DEN.2023.001003

06/2023

1 ADDENDUM 108/21/2023

100% CONSTRUCTION DOCUMENTS

RKP & DD

IL

DESIGN NOTES

R-101 02 08

GENERAL NOTES:

1. ALL CONDITIONS OR PENETRATIONS MAY NOT BE SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS, MEASUREMENTS/DIMENSIONS, QUANTITIES, LOCATIONS, ETC. AND NOTIFYING AMTECH SOLUTIONS OF ANY DISCREPANCIES PRIOR TO

BIDDING.

2. ALL SHEET METAL WORK MUST COMPLY WITH SMACNA AND ANSI/SPRI ES-1 AND GT-1 AS

REFERENCED IN THE APPLICABLE VERSION OF THE IBC AND IEBC.

3. THE WORK OF THIS CONTRACT SHALL BE COMPLETED IN ACCORDANCE WITH THE ATTACHED

DRAWINGS, DOCUMENTS AND SPECIFICATIONS.

4. ALL MATERIALS TO BE USED ON THIS PROJECT SHALL BE INSTALLED IN STRICT ACCORDANCE

WITH MANUFACTURER'S RECOMMENDED SPECIFICATIONS FOR INSTALLATION.

5. CONTRACTOR(S) SHALL COORDINATE THE WORK OF THIS CONTRACT TO AVOID ANY

INTERFERENCE WITH ADJOINING AREAS.

6. ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS MUST BE SUBMITTED TO AMTECH

SOLUTIONS IN WRITING FOR APPROVAL.

7. CONTRACTOR SHALL EXERCISE EXTREME CARE NOT TO DAMAGE THE ADJACENT

CONSTRUCTION OF THE BUILDING. ANY DAMAGE SHALL BE CORRECTED BY THE CONTRACTOR

AT THEIR OWN EXPENSE.

8. CONTRACTOR SHALL PROVIDE ALL SAFE GUARDS, AS REQUIRED, TO PRECLUDE INJURY TO

AMTECH SOLUTIONS, THE OWNER'S AND CONTRACTOR'S PERSONNEL, AND TO ALL OTHER

PERSONS AT THE CONSTRUCTION SITE.

9. CONTRACTOR SHALL PERFORM ALL WORK AS INDICATED ON CONTRACT DOCUMENTS

INCLUDING BUT NOT LIMITED TO: ROOFING AND ASSOCIATED CURB AND PARAPET WALL

FLASHINGS AND MODIFICATIONS.

10. ALL SATELLITE RECEIVERS, ANTENNAS, EQUIPMENT SUPPORTS AND PENETRATIONS NOT

UTILIZED ARE TO BE REMOVED AND DISCARDED AS DIRECTED BY THE OWNER AND AMTECH

SOLUTIONS. ALL OPERATIONAL SATELLITE RECEIVERS, ANTENNAS, ETC. ARE TO BE REMOVED

AND RE-INSTALLED USING MANUFACTURER APPROVED DETAILS AS DIRECTED BY AMTECH

SOLUTIONS.

11. ANY EXISTING CABLES/CONDUITS LYING ON THE ROOF SHALL BE REMOVED AND/OR

RE-INSTALLED AS DIRECTED BY THE OWNER AND AMTECH SOLUTIONS.

12. AVOID PENETRATION SEALER POCKETS AT ROOF PENETRATIONS (INSTALL ONLY WHERE

REQUIRED AND APPROVED BY AMTECH SOLUTIONS).

13. WHERE EXISTING EXTERIOR LIGHTING AND ELECTRICAL EQUIPMENT INTERFERES WITH THE

CONSTRUCTION OF THE NEW ROOF, FASCIAS, OR SOFFITS, SUCH FIXTURES SHALL BE

REMOVED AND RE-INSTALLED TO THE SATISFACTION OF THE OWNER AND AMTECH

SOLUTIONS.

14. CONTRACTOR SHALL EXTEND EXISTING HVAC ROOF TOP UNITS AND INTERIOR DUCTWORK

THAT WILL BE DISTURBED DUE TO NEW WORK, INCLUDING BUT NOT LIMITED TO: CURBS,

DUCTWORK, PIPING, ELECTRICAL, ETC. IN ORDER TO MAINTAIN AN 8-INCH MINIMUM FLASHING

HEIGHT AS REQUIRED BY CODE, DUE TO INSTALLATION OF NEW ROOF SYSTEM.

15. ALL ROOF PIPE VENTS AND OTHER ROOF PENETRATION(S) SHALL BE EXTENDED UP TO

MAINTAIN AN 8-INCH MINIMUM FLASHING HEIGHT ABOVE NEW ROOF, AS REQUIRED BY CODE.

EXTENSIONS SHALL BE OF LIKE MATERIALS AND WELDED IF METAL.

16. ALL METAL FASCIA, COPINGS, LEADERS, SCUPPER BEAUTY PLATES, GUTTERS, DOWNSPOUTS, ETC. ARE TO BE FACTORY PRE-FINISHED (COLOR TO BE SELECTED AND APPROVED BY

OWNER).

17. SCUPPERS ARE TO BE MADE FROM GALVANIZED STEEL TO ALLOW FOR SOLDERED JOINTS.

18. ALL DIMENSIONS FOR ALL EXISTING CONSTRUCTION CONDITIONS ARE APPROXIMATE AND ARE

TO BE FIELD VERIFIED BY THE CONTRACTOR(S).

19. CONTRACTOR IS TO VERIFY LOCATION, COUNT AND SIZES OF ROOF PENETRATIONS AND

DRAINS PRIOR TO THE COMMENCEMENT OF WORK.

20. ALL NEW CONTINUOUS FLASHINGS ARE TO BE INSTALLED AT A CONSISTENT HEIGHT. MINIMUM

FLASHING HEIGHTS ARE TO BE CALCULATED AT INSULATION HIGH POINTS.

21. THE NEW ROOF SYSTEM AND PERFORMANCE IS TO ADHERE TO LOCAL BUILDING CODE AND

DESIGN WIND SPEED REQUIREMENTS AS SPECIFIED.

22. REFER TO ACCOMPANYING SPECIFICATIONS FOR ADDITIONAL INFORMATION.

23. SPECIFICATIONS ARE TO TAKE PRECEDENCE OVER CONFLICTING INFORMATION ON

DRAWINGS.

24. CONTRACTOR IS TO MAINTAIN PROPER DRAINAGE OF THE ROOF(S) THROUGH ALL PHASES OF

ROOF CONSTRUCTION.

25. ALL NAILERS ARE TO BE FLUSH WITH THE TOP OF ADJACENT SUBSTRATES.

26. CONTRACTOR TO CONFIRM ALL DRAIN LINE SIZES WITH CONSULTANT.

ROOFING NOTES:

1. WITH PRIOR APPROVAL BY OWNER, UP TO ONE WEEKS WORTH OF MATERIALS CAN BE STORED

ON THE ROOF, AS LONG AS THEY ARE ON PALLETS/CRIBBING, COVERED WITH TARPS (NO

PLASTIC) AND THE ROOF STRUCTURE IS NOT OVERLOADED. ADDITIONAL MATERIALS STAGED

ON THE ROOF MUST BE APPROVED BY OWNER AND CONSULTANT IN WRITING.

2. MATERIALS STORED ON THE GROUND SHOULD BE SECURED IN A FENCED IN AREA OR IN A

COVERED TRAILER TO ENSURE THEY ARE SECURE. ALL ONSITE STORAGE MUST FIRST BE

REVIEWED AND APPROVED BY BOTH THE OWNER AND CONSULTANT.

3. ALL MATERIALS SHALL BE KEPT DRY FROM STANDING WATER, FALLING WATER, AND

CONDENSATION WHEN ON THE GROUND AND ROOF.

4. BONDING ADHESIVES, MASTICS, CAULKING, ETC. ARE TO BE STORED BETWEEN 60 TO 80

DEGREES, AND NOT ALLOWED TO FREEZE.

5. THE CONTRACTOR IS TO TEAR-OFF, LAY-UP, AND COMPLETE DETAILS ON ROOF AREAS BY THE

END OF EACH WORKDAY.

6. ROOF DETAILING AND SHEET METAL INSTALLATION NEED TO FOLLOW CLOSELY BEHIND THE

ROOF MEMBRANE INSTALLATION.

7. NIGHT-SEALS ARE PARAMOUNT! CONTRACTOR IS REQUIRED TO TIE-IN THE NEW ROOF SYSTEM

TO THE EXISTING ROOF, SUCH THAT NO WATER CAN MIGRATE INTO THE NEW ROOF ASSEMBLY

AND/OR THE BUILDING.

8. THE AMBIENT TEMPERATURE REQUIREMENT FOR INSTALLATION IS 40 DEGREES AND RISING.

9. CONTRACTOR IS REQUIRED TO PROTECT ALL NEWLY INSTALLED ROOF MEMBRANES THAT

THEY WILL WORK OVER WITH CLEAN TARPS AND PLYWOOD.

10. ALL TRASH AND DEBRIS MUST BE REMOVED FROM THE ROOF SURFACE/LEVEL AS WELL AS

THE GROUNDS DAILY.

11. CONTRACTOR TO REPLACE ANY MISSING/ BROKEN DRAIN STRAINERS AND PARTS WITH NEW

TO MATCH EXISTING. ALL DRAINS STRAINERS AND CLAMPING RINGS ARE TO BE CLEANED,

PRIMED, AND PAINTED.

12. NEW 1

2-INCH (OR ONE SLOPE GREATER THAN EXISTING ROOF SLOPE) CRICKETS MUST BE

INSTALLED ON THE HIGH SIDE OF ALL CURBS AND PENETRATIONS WIDER THAN 24-INCHES.

13. NEW WALKWAY PADS ARE TO BE INSTALLED AS INDICATED ON THE ROOF PLANS AND AT ALL

LADDERS, ROOF HATCHES, RTU ACCESS PANELS, UNDER ALL SATELLITE SUPPORT SLEDS,

AND AROUND ALL SIDES OF SERVICEABLE MECHANICAL EQUIPMENT. NOT ALL WALK PADS ARE

SHOWN.

13.1. DO NOT INSTALL WALK PADS IN A MANNER THAT WILL CREATE WATER PONDING

CONDITIONS.

13.2. WALK PADS SHALL NOT BE INSTALLED OVER MEMBRANE SEAMS OR WITHIN VALLEYS.

14. ALL INSULATION BOARD JOINTS SHALL BE 1

8" OR LESS IN WIDTH. FILL ALL UNEVEN OR

OVERSIZED JOINTS.

15. MEMBRANE ADHESIVE APPLICATION MUST BE ALLOWED TO PROPERLY FLASH OFF BEFORE

MATING. ENSURE ADHESIVE IS DRY TO THE POINT OF BEING TACKY, BUT NOT STRINGY TO THE

TOUCH. DO NOT ALLOW ADHESIVE TO "DRY-OUT" COMPLETELY.

16. PROVIDE 4" LAP JOINTS FOR ALL SHEET METAL FLASHING RECEIVERS.

17. PROVIDE CURBS FOR ALL ROOF MOUNTED EQUIPMENT WITH A DECK OPENING OF 12-INCHES

OR GREATER.

18. ALL MEMBRANE SEAMS MUST BE STRIPPED-IN WITH A MINIMUM 6" WIDE SEMI-CURED COVER

TAPE.

19. ALL INSIDE AND OUTSIDE CORNER DETAILING TO BE INSTALLED PER MANUFACTURER

REQUIREMENTS AND R-503.

20. ELECTRIC METALLIC TUBE (EMT) CONDUITS MAY EXIST WITHIN THE HIGH FLUTES OF THE

METAL ROOF DECK AREAS. CONTRACTOR TO COORDINATE ACCESS TO INTERIOR ROOF AREAS

WITH OWNER AND IDENTIFY LOCATIONS WHERE EMT HAS BEEN INSTALLED WITHIN THE HIGH

FLUTES OF THE METAL DECK PRIOR TO TEAR OFF AND NEW ROOF INSTALLATION.

CONTRACTOR TO TAKE CARE NOT TO PENETRATE OR DAMAGE THE EXISTING EMT AND

ELECTRICAL WIRING COMPONENTS AS PART OF NEW ROOF INSTALLATION. ANY DAMAGE THAT

OCCURS AS A RESULT OF THE ROOF WORK WILL BE REPAIRED AND RETURNED TO

PRE-CONSTRUCTION CONDITION AT NO EXPENSE TO THE OWNER.

PLYWOOD SHEATHING FASTENING ILLUSTRATION:

ROOF ASSEMBLY ATTACHMENT SCHEDULE:

ROOF MATERIAL

ATTACHMENT

TYPE

ATTACHMENT MATERIAL

ZONE 1'

ATTACHMENT RATE

ZONE 1

ATTACHMENT RATE

ZONE 2

ATTACHMENT RATE

ZONE 3

ATTACHMENT RATE

MEMBRANE ADHESIVE BONDING ADHESIVE FULL COVERAGE FULL COVERAGE FULL COVERAGE FULL COVERAGE

COVER BOARD

(48"x48" BOARD)

- NOTE 3 -

MECHANICAL COATED SCREWS AND INSULATION PLATES (NOTE 2) 8 10 12 16

NOTES:

1. FASTENER AND PLATE PATTERNS ARE TO BE INSTALLED PER MANUFACTURER MINIMUM REQUIREMENTS. CONTRACTOR TO FOLLOW FASTENING AND BEAD SPACING RATES AS DEFINED WITHIN THE DESIGN DOCUMENTS WHERE FASTENING AND BEAD SPACING RATES ARE MORE STRINGENT THAN MANUFACTURER REQUIREMENTS. DO NOT INSTALL FASTENERS AND PLATES WITHIN 6-INCHES OF THE MATERIAL EDGE. FASTENERS ARE NOT TO PENETRATE THE BOTTOM FLUTES. CONTRACTOR TO VERIFY FASTENERS LENGTHS AND ENSURE FASTENERS PENETRATE THE TOP OF THE DECK FLUTES A

MINIMUM OF 3 4-INCH.

2. FASTENING RATES SHOWN FOR ZONES 1', 1, 2, AND 3 ARE FOR 48"x48" (4'x4') BOARDS. FASTENING PATTERNS MUST BE DOUBLED FOR 48"x96" (4'x8') BOARDS. TYPICAL.

(N) MIN. 1/2-INCH FIRE TREATED

CDX PLYWOOD @ ALL VERTICAL

SUBSTRATES. TYP.

FASTENER SCHEDULE:

ELEMENT SUBSTRATE FASTENER NUMBER AND SPACING

HORIZONTAL WOOD NAILER

CONCRETE BLOCK OR MASONRY WALL STAINLESS STEEL CONCRETE SCREWS

16'' O.C. MAX. STAGGERED (NOTE 1)

MINIMUM PULL-OUT RESISTANCE OF 1,000 POUNDS

HORIZONTAL WOOD NAILER 16 D GALVANIZED NAILS.

2 ROWS/9'' O.C. EACH ROW, MIN.

1-1/4'' PENET., MIN. PULLOUT RESISTANCE OF 100# (NOTE 1)

WOOD BLOCKING CONCRETE STAINLESS STEEL CONCRETE SCREWS

12'' O.C. MAX. STAGGERED (NOTE 1)

MINIMUM PULL OUT RESISTANCE OF 1,000 POUNDS

HOOK STRIP

WOOD #8 WOOD SCREWS 8'' O.C. MAX. (NOTE 1)

CONCRETE 3

16" STAINLESS STEEL NAIL-IN EXPANSION FASTENER 6'' O.C. MAX. (NOTE 1)

DRIP EDGE WOOD 4D RING SHANK NAILS.

SEE HOOK STRIP

2 ROWS/3"-4" O.C. MAX. STAGGERED (NOTE 1)

GRAVEL STOP

WOOD 4D RING SHANK NAILS.

SEE HOOK STRIP

2 ROWS/3"-4" O.C. MAX. STAGGERED (NOTE 1)

CONCRETE BLOCK OR MASONRY WALL

OUTSIDE-CONTINUOUS HOOK STRIP

INSIDE EDGE GALVANIZED ROOFING NAILS

SEE HOOK STRIP

12'' O.C. MAX. STAGGERED (NOTE 1)

TERMINATION BAR CONCRETE BLOCK OR MASONRY WALL 3

16" STAINLESS STEEL NAIL-IN EXPANSION FASTENERS 12'' O.C. MAX. (NOTE 1)

RTS/SEAM FASTENING PLATES

CONCRETE BLOCK OR MASONRY WALL 3

16" STAINLESS STEEL NAIL-IN EXPANSION FASTENERS

12'' O.C. MAX. (NOTE 1)

PLYWOOD/STEEL STUDS #15 CORROSION RESISTANT STEEL SCREWS

METAL FLASHING RECEIVER CONCRETE BLOCK OR MASONRY WALL 3

16" STAINLESS STEEL NAIL-IN EXPANSION FASTENERS 12'' O.C. MAX. (NOTE 1)

METAL COUNTER FLASHING METAL FLASHING RECEIVER #15 NEOPRENE WASHERED SELF-DRILLING SCREWS 8'' O.C. MAX. (NOTE 1)

PLYWOOD SHEATHING

(ILLUSTRATION BELOW)

METAL STUD FRAMING #15 CORROSION RESISTANT STEEL SCREWS

6" O.C. MAX. @ EDGES AND

12" O.C. MAX. IN THE FIELD @ EACH STUD LOCATION (NOTE 1)

CONCRETE BLOCK OR MASONRY WALL 3

16" STAINLESS STEEL NAIL-IN EXPANSION FASTENERS

NOTES:

1. FASTENER FREQUENCY SHALL BE DOUBLED WITHIN 10 FEET OF CORNERS.

4"

8"

6"

12"

12"

6"

6"

6"

6"

6"

6"

12"12"12"12" 12" 12"

12"

12"

ROOF RECOVER SCOPE OF WORK:

1. THIS SCOPE OF THIS PROJECT IS FOR A ROOF RECOVER OVER THE EXISTING EPDM ROOF

ASSEMBLY. THE EXISTING ROOF SYSTEMS CONSIST OF:

1.1. A FULLY ADHERED EPDM MEMBRANE OVER GYPSUM COVER BOARD OVER, ONE FULLY

ADHERED LAYER OF 4-INCH POLYISOCYANURATE INSULATION OVER, ONE MECHANICALLY

FASTENED LAYER OF 4-INCH POLYISOCYANURATE INSULATION, OVER AN EXISTING METAL

ROOF DECK.

2. CONTRACTOR TO RELIEF CUT EXISTING MEMBRANE (10'-0" x 10'-0" GRID PATTERN) PRIOR TO ROOF RECOVER INSTALLATION. ALL EXISTING ROOF LAYERS BELOW THE EXISTING MEMBRANE ARE TO REMAIN IN PLACE, WITH THE INSTALLATION OF A NEW ROOF RECOVER ASSEMBLY CONSISTING OF:

2.1. METAL DECK (STRUCTURAL SLOPE) - ALL ROOF AREAS - 1/R-102:

2.1.1. NEW 0.060-INCH (60 MIL) NON-REINFORCED BLACK EPDM MEMBRANE - (FULLY

ADHERED OVER)

2.1.2. NEW 12-INCH FIRE-TREATED, GYPSUM COVER BOARD WITH GLASS MAT FACERS (48" x

48" BOARDS) - R-0.56 - (MECHANICALLY ATTACHED THROUGH PREPARED EXISTING

ROOF ASSEMBLY BELOW TO DECK)

2.1.3. EXISTING ROOF SYSTEM OVER METAL ROOF DECK.

3. CONTRACTOR TO REMOVE AND REPLACE ALL WET OR DAMAGED INSULATION TO MATCH EXISTING.

LIGHTNING PROTECTION NOTES:

1. ROOFING CONTRACTOR TO COORDINATE WITH CERTIFIED LIGHTNING PROTECTION CONTRACTOR FOR ALL - ROOF, PARAPET WALLS, SCREEN WALLS, ETC. - EXISTING LIGHTNING PROTECTION

REMOVAL AND ONSITE STORAGE DURING CONSTRUCTION.

2. CONTRACTOR TO ENSURE ALL LIGHTNING PROTECTION COMPONENTS ARE COLLECTED AND

MAINTAINED DURING STORAGE.

3. ANY DAMAGED, BROKEN, OR MISSING COMPONENTS ARE TO BE DOCUMENTED AND SUBMITTED TO

THE OWNER AND CONSULTANT IN WRITING.

4. REFER TO ROOF PLANS FOR APPROXIMATE LIGHTNING PROTECTION LOCATIONS.

5. PROPOSED LIGHTNING PROTECTION PLAN AND REINSTALLATION METHODS AND CERTIFICATION AS

SHOWN WITHIN THESE DESIGN DOCUMENTS ARE TO BE A DEFERRED SUBMITTAL/DELEGATED

DESIGN COORDINATED BY THE ROOFING CONTRACTOR.

PROVIDE A 45° CHAMFER ALONG THE

TOP EDGE OF THE (N) PLYWOOD. TYP.

(N) PLYWOOD MUST EXTEND TO

THE DECK SURFACE (U.O.N.). TYP.

V.I.F.

BUTT PLYWOOD TIGHT TO BOTTOM

SIDE OF (N) PLYWOOD WOOD NAILER.

(N) NAILER FLUSH WITH PLYWOOD FACE.

(E) SUBSTRATE.

(E) ROOF DECK.

PLYWOOD SHEATHING FASTENING SECTION @ VERTICAL SUBSTRATES:

A-A

(A-A) PLYWOOD SHEATHING SECTION @ TOP OF PARAPET WALLS:

(ETR) MECHANICALLY

ATTACHED INSULATION.

(ETR) METAL OR WOOD DECK. V.I.F.

(N) BONDING ADHESIVE.

(N) ADHERED 12" GYPSUM COVER BOARD.

(N) EPDM MEMBRANE.

(N) FACTORY APPLIED

SEAM TAPE.

(N) 6" SEMI-CURED PRESSURE

SENSITIVE COVER TAPE.

ROOF SLOPE

(N) FASTENERS AND

INSULATION PLATES.

(E) MEMBRANE TO BE RELIEF

CUT WITH A MAXIMUM GRID

SPACING OF 10'-0" x 10'-0".

(ETR) ADHERED COVER BOARD.

(ETR) ADHERED INSULATION.

WEST

WING

EAST

WING

NOT IN

CONTRACT

NOT IN

CONTRACT

NOT IN

CONTRACT

PLOT SCALE IS 30x42

ISSUED FOR

SHEET NO.

SHEET TITLE

PROJECT

CLIENT

DATE REVISION

DRAWN BY

CHECKED BY

PROJECT NO.

DATE

LEGEND

OF

1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222

(303) 738-0823 | www.amtechsls.com

AMTECH

SOLUTIONS

KEYPLAN LEGEND

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

2801 WEST 9TH STREET

CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF

PROJECT

2801 WEST 9TH STREET

CRAIG, CO 81625

DEN.2023.001003

06/2023

1 ADDENDUM 108/21/2023

100% CONSTRUCTION DOCUMENTS

RKP & DD

IL

ROOF ASSEMBLIES

R-102 03 08

ROOF ASSEMBLY NOTES:

1. GENERAL:

1.1. VERIFY THAT SUBSTRATES ARE DRY, CLEAN, SMOOTH AND FREE OF SHARP EDGES, BURRS, DEEP DEPRESSIONS, LOOSE

MATERIAL, OIL, GREASE OR OTHER FOREIGN MATERIAL PRIOR TO INSTALLATION.

1.2. BEGINNING INSTALLATION MEANS ACCEPTANCE OF ALL EXISTING SURFACE CONDITIONS.

1.3. NEATLY CUT AND FIT MATERIALS AROUND PENETRATIONS AND PROJECTIONS.

1.4. ONLY DRY MATERIALS ARE TO BE INSTALLED AND ONLY AS MUCH AS CAN BE COMPLETED AND DETAILED THE SAME DAY.

1.5. ALL MATERIAL THAT HAS BECOME WET DURING STORAGE WILL BE MARKED AND REMOVED FROM THE JOBSITE BY THE

CONTRACTOR.

1.6. COORDINATE AND CONFIRM THAT MANUFACTURER'S ASSEMBLY MEETS OR EXCEEDS THE MINIMUM SPECIFIED ROOF

ASSEMBLY RATING.

1.7. LISTED ATTACHMENT CRITERIA ARE MINIMUMS; ADDITIONAL OR ENHANCED ATTACHMENT REQUIRED BY

MANUFACTURER'S IS TO BE PROVIDED AT NO ADDITIONAL COST.

2. BARE BACK EPDM MEMBRANES - NON-REINFORCED:

2.1. MEMBRANE SHEET MUST BE LOOSELY LAID OUT AND ALLOWED TO RELAX FOR A MINIMUM OF 30-MINUTES PRIOR TO

INSTALLATION.

2.2. BONDING ADHESIVES ARE TO BE APPLIED IN FULL COVERAGE, EVENLY, TO BOTH THE SUBSTRATE AND THE BACK OF THE

MEMBRANE SHEET.

2.3. ALLOW THE ADHESIVE TO DRY TO A POINT OF BEING TACKY, BUT NOT STRINGY TO THE TOUCH. DO NOT ALLOW

ADHESIVE TO “DRY OUT” COMPLETELY. THE MEMBRANE AND SUBSTRATE WILL BE DRY (NON-TACKY) TO THE FINGER

TOUCH.

2.4. ENSURE SHEETS ARE INSTALLED WITH LAPS SHINGLED IN THE DIRECTION OF THE ROOF SLOPE DRAINAGE, TO PREVENT

BACKWATER LAPS.

2.5. SHEET EDGES ARE TO BE LAPPED AT LEAST 3-INCHES, AS REQUIRED BY THE MANUFACTURER.

2.6. ALL HORIZONTAL AND VERTICAL MEMBRANE SEAMS ARE TO BE OVERLAID WITH A MANUFACTURER APPROVED, 6-INCH

SEMI-CURED COVER TAPE.

3. COVER BOARD:

3.1. BOARDS ARE TO BE INSTALLED WITH A MINIMUM 12-INCH MATERIAL STAGGER IN ALL DIRECTIONS.

3.2. GAPS BETWEEN BOARDS GREATER THAN 1

8-INCH ARE NOT ALLOWED. FILL GAPS WITH ADDITIONAL MATERIAL OR

LOW-RISE FOAM ADHESIVE.

(N) ROOF ASSEMBLY - BASE BID (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

ROOF ASSEMBLY LEGEND:

MAIN ROOF AREAS

A

ROOF ASSEMBLY PLAN

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

PLAN

NORTH

TRUE

NORTH

21' TYP.

21' TYP.

7' TYP.

21' TYP.

40'-0" MIN.

TYP. V.I.F.

21' TYP.

7' TYP.

21' TYP.

7' TYP.

21' TYP.

NOT IN

CONTRACT

NOT IN

CONTRACT

NOT IN

CONTRACT

7' TYP.

7' TYP.

PLAN

NORTH

TRUE

NORTH

PLOT SCALE IS 30x42

ISSUED FOR

SHEET NO.

SHEET TITLE

PROJECT

CLIENT

DATE REVISION

DRAWN BY

CHECKED BY

PROJECT NO.

DATE

LEGEND

OF

1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222

(303) 738-0823 | www.amtechsls.com

AMTECH

SOLUTIONS

KEYPLAN LEGEND

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

2801 WEST 9TH STREET

CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF

PROJECT

2801 WEST 9TH STREET

CRAIG, CO 81625

DEN.2023.001003

06/2023

1 ADDENDUM 108/21/2023

100% CONSTRUCTION DOCUMENTS

RKP & DD

IL

WIND DESIGN

R-200 04 08

B

ROOF WIND ZONE PLAN

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

ZONE 1 =

ZONE 2 =

ZONE 3 =

ZONE 1' =

WIND DESIGN NOTES:

1. DESIGN ASSUMPTIONS:

1.1. 2021 INTERNATIONAL EXISTING BUILDING CODE

1.1.1. ALTERATION LEVEL 1 - REMOVE AND REPLACE WITH LIKE.

1.2. 2021 INTERNATIONAL BUILDING CODE.

1.3. WIND DESIGN: ASCE 7-16

1.3.1. 3-SECOND PEAK GUST: 111 MPH

1.3.2. EXPOSURE: C

1.3.3. CLIMATE ZONES: 6B

1.3.4. CONFIGURATION: ENCLOSED

1.3.5. RISK CATEGORY: III

ASCE 7 - STRENGTH DESIGN VALUES:

1. MAIN ROOF AREAS:

1.1. DESIGN HEIGHT (H): 35-FEET

1.1.1. 0.6h: 21.0-FEET

1.1.2. 0.2h: 7.0-FEET

1.1.3. a: 8.0-FEET

1.2. ZONE 1' FIELD: -31.6 PSF

1.3. ZONE 1 FIELD: -55.0 PSF

1.4. ZONE 2 EDGE: -72.5 PSF

1.5. ZONE 3 CORNER: -98.7 PSF

1.6. ZONE 4 WALL FIELD: -37.4 PSF

1.7. ZONE 5 WALL CORNER: -46.3 PSF

0.6h 0.6h

0.6h

0.6h

0.6h

0.6h

0.2h

0.2h

ZONE 3

ZONE

1'

ZONE

ZONE

ZONE

ZONE 4 =

ZONE 5 =

ZONE 4

ZONE 5

a a h

1. CONTRACTOR TO REMOVE ONLY AS MUCH ROOFING PER DAY AS THEY ARE ABLE TO MAKE WATERTIGHT AND SECURE AT THE END OF THEIR WORK DAY. ANY DAMAGE CAUSED BY WEATHER OR OTHER ELEMENTS AS A RESULT OF UNFINISHED ROOFING WILL BE THE FULL RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR WILL REPLACE/REPAIR ALL INTERIOR AND EXTERIOR DAMAGE, RESULTING FROM

UNFINISHED/UNPROTECTED ROOF CONSTRUCTION AT THEIR OWN EXPENSE.

2. ALL CONDITIONS OR PENETRATIONS MAY NOT BE SHOWN. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING

CONDITIONS AND MEASUREMENTS.

3. DETAIL CALL OUTS AND KEY NOTES MAY ONLY BE REFERENCED ONCE ON THE DRAWINGS. ONCE A PARTICULAR CALL OUT OR KEY NOTE HAS BEEN REFERENCED OR INDICATED BY LEGEND, IT MAY NOT BE REFERENCED AGAIN ON THE DRAWINGS, BUT ITS USE SHALL BE TYPICAL.

RTU

RTU

RTU RTU

RDOF

OF

OF

RD

OF

RD

RD

RD

RD

RD

RDOF

R-502

SIM

R-502

SI

M

R-500

TYP.

R-500

TY

P.

R-500

TYP.

R-500

TYP.

R-501

TYP.

R-500

TYP.

R-502

TYP.

R-501

TYP.

R-501TYP.

TYP.

R-502

TYP.

3a & b R-502

TYP.

TYP.

4a & b R-502

WEST

WING

EAST

WING

NOT IN

CONTRACT

NOT IN

CONTRACT

NOT IN

CONTRACT

R-502

TYP.

3a & b R-502

TYP.

R-502

TY

P.

R-502

TYP.

RD RD

RDRD OF

OF RD

OF

OF

OF

OF

OF

OF

R-500

TYP.

R-500

TYP.

R-500

TYP.

RR-EX. JT.

R-502

2 TYP. 2 TYP.

2TYP.

2 TYP.

R-501

R-501

GAS

E

R-###

SECTION AND DETAIL REFERENCE

NOT IN CONTRACT

ROOFING KEY NOTE

STRUCTURAL ROOF SLOPE

4" TAPERED ROOF SLOPE

RIDGE LINE

VALLEY LINE

PRIMARY ROOF DRAIN

OVERFLOW ROOF DRAIN

THRU-WALL ROOF DRAIN

THRU-WALL SCUPPER

OVERFLOW SCUPPER

ROOF HATCH

WALL-TO-ROOF EXPANSION JOINT

ROOF-TO-ROOF EXPANSION JOINT

EXISTING GAS LINE

EXISTING CONDUIT LINE

EXISTING LIGHTNING PROTECTION

HOT STACK PENETRATION

VENT PIPE PENETRATION

SOIL PIPE PENETRATION

DAVIT ARM PENETRATION

TIE-BACK ANCHOR PENETRATION

ELECTRICAL LINE PENETRATION

GAS LINE PENETRATION

PIPE PENETRATION

ROOF TOP UNIT

EXHAUST HOOD

EXHAUST FAN

MECHANICAL EQUIPMENT CURB

ABANDONED EQUIPMENT/CURB TO BE

REMOVED AT OWNERS DIRECTION

NEW 12" TAPERED CRICKETS WITH 6"

TAPERED EDGE STRIP

NEW WALKWAY PAD

SKYLIGHT

SPLASH BLOCK

ROOF AREA ELEVATION OFFSET

ROOFING DETAIL NUMBER

ROOFING PAGE NUMBER

RD

OF

WD

TWS

RH

EH

EF

RR-EX. JT.

RTU

SL

OFS

SP

VP

HS

TA

EP

WR-EX. JT.

MC

SB

DA

GP

PP

AB

KEYNOTES:

1. REINFORCE TOP EDGE OF ROOF AREA OFFSET CURB WITH AN

ADDITIONAL CONTINUOUS STRIPPING-PLY LAYER OF FULLY ADHERED

EPDM ALONG THE ENTIRE EXPOSED EDGE. NEW MEMBRANE TO

EXTEND A MINIMUM OF 3" ACROSS THE TOP OF THE MEMBRANE AND A

MINIMUM OF 3" DOWN THE VERTICAL FACE FROM THE CURB EDGE, TYP.

2. FIELD WRAP/DETAIL PER DRAWING DETAIL 4/R-501. TYP.

3. EXISTING SOFFIT OVERHANG:

3.1. DASHED LINE INDICATES APPROX. LOCATION OF ROOF TRANSITION

FROM FULL ASSEMBLY TO TONGUE AND GROOVE SOFFIT.

CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND LOCATIONS.

3.2. EXISTING SOFFIT ASSEMBLY IS COMPRISED OF:

3.2.1. EPDM MEMBRANE FULLY ADHERED OVER,

3.2.2. PLYWOOD COVER BOARD ADHERED OVER,

3.2.3. EXPOSED TONGUE AND GROOVE DECKING.

3.3. NEW GYPSUM COVER BOARD ASSEMBLY TO BE MECHANICALLY

ATTACHED THROUGH THE EXISTING PLYWOOD COVER BOARD TO

THE EXISTING TONGUE AND GROOVE DECKING. FASTENERS ARE

TO EMBED A MINIMUM OF 1-INCH INTO THE EXISTING TONGUE AND

GROOVE DECKING AND ARE NOT TO PUNCTURE THROUGH OR BE

VISIBLE FROM BELOW.

GENERAL NOTES:

1. EXISTING LIGHTNING PROTECTION. REFER TO DRAWING PAGE R-101

AND R-501 OF REMOVAL AND REINSTALLATION NOTES, TYP.

2. CONTRACTOR TO COORDINATE WITH OWNER REGARDING REMOVAL,

STORAGE, AND REINSTALLATION OF EXISTING HEAT TRACE CABLES

AND ASSOCIATED SECUREMENT CLIPS, TYP.

C

ROOF PLAN

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY - SCALE: 3/32" - 1'-0"

PLAN

NORTH

TRUE

NORTH

PLOT SCALE IS 30x42

ISSUED FOR

SHEET NO.

SHEET TITLE

PROJECT

CLIENT

DATE REVISION

DRAWN BY

CHECKED BY

PROJECT NO.

DATE

LEGEND

OF

1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222

(303) 738-0823 | www.amtechsls.com

AMTECH

SOLUTIONS

KEYPLAN LEGEND

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

2801 WEST 9TH STREET

CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF

PROJECT

2801 WEST 9TH STREET

CRAIG, CO 81625

DEN.2023.001003

06/2023

1 ADDENDUM 108/21/2023

100% CONSTRUCTION DOCUMENTS

RKP & DD

IL

ROOF PLAN

R-300 05 08

(N) EPDM MEMBRANE.

REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

(N) PLYWOOD SHEATHING. TYP. - RE: R-101.

(N) ONE EDGE METAL ASSEMBLY. - RE: B/R-500.

END OF (N) MEMBRANE FLASHING. TYP.

(N) PERIMETER BLOCKING.

V.I.F.

V.I.F.

4" MIN. ABOVE FINISHED ROOF HEIGHT. TYP.

(N) BASE FLASHING - RE: A/R-500.

(E) SUBSTRATE.

(N) WATER CUT-OFF AND (N) TERM. BAR @

THE TOP OF (N) MEMBRANE FLASHING. TYP.

(N) SEAM FASTENING PLATES AND FASTENERS.

(N) 6" RUSS STRIP. TYP.

(N) EPDM MEMBRANE.

(N) PLYWOOD SHEATHING. TYP.

RE: R-101.

(ETR) SUBSTRATE.

NOTES:

1. REMOVE/REINSTALL/REPLACE

J-CHANNEL AS NEEDED AND

CUT BACK (E) METAL PANELS

AS NECESSARY TO ALLOW

FOR (N) FLASHING HEIGHTS.

3"

MIN. REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

3"

MIN.

8"

MIN.

(ETR) METAL PANEL SYSTEM AND J-CHANNEL.

* REFER TO NOTE 1 BELOW.

(N) PRE-FINISHED RECEIVER METAL WITH

VERTICAL INSIDE SLIP JOINT. TYP.

(N) PRE-FINISHED COUNTER FLASHING SET IN RECEIVER

METAL SLIP JOINT IN CONT. BED OF SEALANT. TYP.

6"

MIN.

8"

MIN.

3"

MIN.

BRING FLASHING MEMBRANE OVER TOP OF CURB AND

FASTEN TO BACK SIDE OF CURB WITH 1-1/4" HOT

DIPPED GALVANIZED NAILS @ 6" O.C. MAX. CURB CAP

TO BE SET IN (N) CONT. BEAD OF SEALANT.

(N) PRE-FINISHED METAL FLASHING OR (N) CURB

CAP FASTEN WITH (N) METAL BACKED FASTENERS

WITH NEOPRENE WASHERS @ 12" O.C. MAX. WITH

A MINIMUM OF 2 FASTENERS PER SIDE.

(N) WOOD NAILERS AS NEEDED TO MEET

MINIMUM FLASHING HEIGHTS. TYP.

(N) SEAM FASTENING PLATES AND FASTENERS.

(N) EPDM MEMBRANE.

(N) 6" RUSS STRIP. TYP.

REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

5 & 6 R-500

DOUBLE CUT (E) METAL CAP AS NEEDED TO ALLOW FOR (N) RECEIVER.

(N) SEALANT, (N) TERMINATION BAR AND (N) FASTENERS ATTACHED @ 12" O.C.

(N) PRE-FINISHED SLIP METAL COUNTER FLASHING SET IN (N)

CONTINUOUS URETHANE SEALANT FASTENED WITH (N) NEOPRENE

WASHERS @ 12" O.C. MAX. WITH A MINIMUM OF 2 FASTENERS PER SIDE.

NOTE:

ALTERNATE CURB FLASHING TO BE USED ONLY WHERE MEMBRANE CANNOT BE RUN OVER THE TOP OF THE CURB.

USE OF THIS ALTERNATE DETAIL MUST BE APPROVED BY THE ARCHITECT OR ROOF CONSULTANT 3"

MIN.

3"

MIN.

(E) CURB CAP CORNERS THAT HAVE

BEEN SPLIT FOR THE (N) MEMBRANE

FLASHING.

(N) 20-GAUGE L-METAL BEHIND THE (E)

METAL CAP FASCIA EDGE, FASTENED

ON BOTH SIDES WITH (N) NEOPRENE

WASHERED FASTENERS.

(N) 20-GAUGE METAL WIDTH

MUST MATCH THE HEIGHT OF

THE (E) CURB FASCIA EDGE.

OVERLAY CORNER REPAIR WITH

(N) UNCURED EPDM. TYP.

(N) PRE-MANUFACTURED 24 GA. (METAL-ERA)

FORMED SNAP-ON FASCIA COVER 12'-0" LENGTHS

WITH CONCEALED JOINT COVERS 4" WIDE.

(N) CONTINUOUS BEAD OF MANUFACTURER

APPROVED SEALANT (BY INSTALLER).

(N) #10 x 2" HEX HEAD SCREWS 12"

MAX. O.C. (BY APPROVED MANU).

(N) 20 GA. GALVANIZED STEEL RETAINER SECTION,

12'-0" LENGTHS PROVIDED WITH 9 36" HOLES, 12" O.C.

ROOFING CONTRACTOR TO VERIFY DIMENSIONS

IN FIELD. OUTSIDE FACE DIMENSION IS NOT TO

EXCEED 8" MAX. AND 4" MIN. ENSURE (N) CAP AND

PRE-FINISHED FASCIA EXTENDER CONCEALS ALL

OVERHANGING MEMBRANE AND (E) PAINT LINES.

INSTALL (N) SPRING

CLIPS 48" O.C.

(N) PRE-FINISHED 24 GA. OFFSET

METAL-ERA FASCIA EXTENDER.

(N) CONT. 20 GA. GALVANIZED CLEAT.

3"

MIN.

3"

MIN.

(N) EPDM FIELD MEMBRANE (FA).

(N) SEAM FASTENING PLATES. TYP.

WALL ASSEMBLY. - V.I.F. TYP.

(N) EPDM MEMBRANE FLASHING (FA). TYP.

(N) 6" RUSS STRIP. TYP.

PLOT SCALE IS 30x42

ISSUED FOR

SHEET NO.

SHEET TITLE

PROJECT

CLIENT

DATE REVISION

DRAWN BY

CHECKED BY

PROJECT NO.

DATE

LEGEND

OF

1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222

(303) 738-0823 | www.amtechsls.com

AMTECH

SOLUTIONS

KEYPLAN LEGEND

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

2801 WEST 9TH STREET

CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF

PROJECT

2801 WEST 9TH STREET

CRAIG, CO 81625

DEN.2023.001003

06/2023

1 ADDENDUM 108/21/2023

100% CONSTRUCTION DOCUMENTS

RKP & DD

IL

ROOFING DETAILS

R-500 06 08

(N) PERIMETER WALL FLASHING (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

GENERAL ROOF DETAIL NOTES:

1. PARAPET WALL/ ROOF EDGE FLASHINGS:

1.1. NEW MEMBRANES MUST EXTEND DOWN THE OUTSIDE FACE OF THE PARAPET WALL/ROOF EDGE A MINIMUM OF 2" PAST

THE BOTTOM WOOD NAILER.

1.2. FULLY ADHERE MEMBRANE TO THE PARAPET EXTERIOR.

1.3. MINIMUM 12"x12" WIDE UNCURED EPDM PATCHES MUST BE INSTALLED AT ALL MEMBRANE SEAM ANGLE CHANGES.

2. COUNTER FLASHINGS:

2.1. ALL EXISTING SURFACE MOUNTED COUNTER FLASHING METALS AND ASSOCIATED FASTENERS/SEALANTS ARE TO BE

REMOVED AND DISPOSED.

2.2. EXISTING REGLETS TO REMAIN IN PLACE ARE TO HAVE THEIR EXISTING SEALANTS RAKED OUT AND EXPOSED SURFACES

CLEANED PRIOR TO INSTALLATION OF NEW TOOLED-IN SEALANT.

2.3. EXISTING REGLETS TO BE DOUBLE-CUT AS NEEDED LEAVING 1" TO 2" OF EXISTING MATERIAL FOR NEW COUNTER

FLASHING TIE-IN.

2.4. NEW SEALANTS TO BE TOOLED-IN, CREATING A WATER SHEDDING SURFACE.

2.5. ENSURE ALL WEEP HOLES REMAIN EXPOSED.

2.6. INSTALL NEW LEAD WEDGES @ 8" O.C. MAX. FOR ALL REGLET COUNTER FLASHING CONDITIONS. TYP.

2.7. BEND COUNTER FLASHING METALS 90-DEGREES @ END LOCATIONS, TO MEET FLUSH WITH WALL SUBSTRATE AND SEAL

WITH NEW URETHANE SEALANT. TYP.

3. THRU-WALL/OVERFLOW SCUPPERS:

3.1. NEW PRE-FINISHED BEAUTY PLATES ARE TO MATCH EXISTING BEAUTY PLATE DIMENSIONS @ A MINIMUM.

3.2. ENSURE ALL SUN/PAINT LINES ARE CONCEALED. TYP.

3.3. CUT/DEMO EXISTING WALL SUBSTRATES AS NECESSARY TO ALLOW FOR INSTALLATION OF THE NEW SCUPPER SLEEVE

DIMENSIONS. TYP.

3.4. OVERFLOW OPENING TO BE CUT ON THE SIDE OF NEW CONDUCTOR HEADS PER SMACNA REQUIREMENTS.

4. ROOF DRAINS:

4.1. STANDARD DRAIN SUMPS ARE 8'-0" x 8'-0". REFER TO ROOF PLAN ON R-300 FOR ELONGATED DRAIN SUMPS THAT EXCEED

THE MINIMUM DIMENSIONS.

4.2. REMOVE ALL LEAD AND OTHER FLASHINGS.

4.3. REMOVE THE EXISTING CLAMPING RING AND STRAINER TO ALLOW FOR THE NEW FLASHING INSTALLATION.

4.4. RAISE/LOWER EXISTING DRAIN BOWL AS NEEDED TO ACCOMMODATE NEW ROOF ROOF ASSEMBLY THICKNESS.

4.5. CONTRACTOR TO WATER TEST ALL PRIMARY AND OVERFLOW DRAINS PRIOR TO CONSTRUCTION TO ENSURE DRAINS HAVE

PROPER FLOW AND NO BLOCKAGE.

4.6. ALL STRAINERS AND CLAMPING RINGS TO BE CLEANED, PRIMED AND PAINTED BEFORE REINSTALLATION, PER THE

SPECIFICATION REQUIREMENTS.

4.7. ALL BOLTS OR CLAMPS MUST BE IN PLACE TO PROVIDE CONSTANT COMPRESSION ON WATER CUT-OFF-MASTIC.

4.8. CUT THE MEMBRANE SO IT EXTENDS 1-INCH, FROM THE ATTACHMENT POINTS OF THE DRAIN CLAMPING RING.

4.9. FIELD SPLICES MUST BE LOCATED AT LEAST 6 INCHES OUTSIDE THE DRAIN SUMP.

4.10. MEMBRANE SEAMS SHALL NOT PASS THROUGH THE DRAIN SUMP.

5. EXPANSION JOINTS:

5.1. EXPANSION JOINTS ARE TO BE INSTALLED WITH THE NEW MEMBRANE UNDER AND OVER TOP OF APPROVED ROD STOCK.

5.2. NEW INSULATION RETAINERS WITH COMPRESSIBLE INSULATION IS TO BE FASTENED TO THE EXISTING SUBSTRATES AND

NEW WOOD BLOCKING @ 12" O.C. TYP.

(N) COUNTERFLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(N) TYPICAL CURB FLASHING DETAIL

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(N) ALTERNATE CURB FLASHING DETAIL

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(E) MECHANICAL CURB CORNER REPAIR DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

A

EPDM BASE FLASHING (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

B

PERIMETER EDGE METAL ASSEMBLY (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

3"

MIN.

(N) SEAM FASTENING PLATES

AND FASTENERS. TYP.

BOTH SIDES OF (N) ROOF

MEMBRANE EXTENDED OVER

TOP OF (N) BLOCKING. TYP.

(N) 6" RUSS STRIP. TYP.

(N) INSULATION RETAINER

AND INSULATION

FASTENED @ 12" O.C. TYP.

3"

MIN.

REFER TO R-102 FOR

FULL ROOF ASSEMBLY. REFER TO R-102 FOR

FULL ROOF ASSEMBLY.

8"

MIN.

(N) FIRE TREATED BUILT-UP

WOOD NAILERS FASTENED

TO DECK @ MAX. 12" O.C.

(N) OVERSIZED CONT. ROD-STOCK OVER

EPDM WITH SEPARATOR SHEET BETWEEN

TOP OF ROD-STOCK AND MEMBRANE TYP.

(N) EPDM STRIPPING-PLY (FA)

OVER TOP OF (N) ROD-STOCK

AND EXPANSION JOINT. TYP.

(N) SEALANT. TYP.

(N) PRE-FABRICATED

PIPE FLASHING. TYP.

CUT PIPE FLASHING TO ENSURE

SNUG FIT AROUND PIPE. TYP.

(N) STAINLESS STEEL

CLAMPING RING. TYP.

4" to 6"

FIELD SEAM

JOINT COVER @ ALL FLASHING-TO-SEAM

INTERSECTION LOCATIONS.

(N) EPDM MEMBRANE.

TAPED/ADHERED SEAMS. TYP.

(E) PENETRATION.

12"MIN. CUT OFF IF REQUIRED

(N) LAP SEALANT. TYP.

REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

8" M

IN

(ETR) PENETRATION.

3" OR GREATER

FIELD SEAM

(N) MIN. 6" WIDE PRESSURE SENSITIVE FLASHING

IN CONJUNCTION WITH EPDM PRIMER.

(N) BUILT UP FIRE TREATED WOOD BLOCKING TO

MATCH THE HEIGHT OF THE (N) ROOF ASSEMBLY,

FASTENED TO THE ROOF DECK @ 6" O.C.

(N) SHEET METAL DAM FASTENED TO

THE (N) WOOD BLOCKING WITH

PANCAKE HEAD SCREWS @ 8" O.C. TYP.

3" MIN.

(N) SHEET METAL RAIN COLLAR SET IN

(N) URETHANE SEALANT WITH A (N)

STAINLESS STEEL CLAMPING RING.

8"

MIN. (N) LAP SEALANT. TYP.

REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

JOINT COVER @ ALL FLASHING-TO-SEAM

INTERSECTION LOCATIONS.

(ETR) PENETRATION.

(N) EPDM MEMBRANE.

(N) MEMBRANE EXTENDED 2" MIN.

ONTO ADJACENT WALL AROUND

ALL 3 SIDES. TYP.

(N) T-BAR FASTENED @ 6" O.C.

MAX. AROUND ALL 3 SIDES. TYP.

(N) MEMBRANE FULLY ADHERED

AND EXTENDED DOWN FACE OF

VERTICAL WALL. TYP.

EXTERIOR

INTERIOR

(N) CONT. TOOLED IN SEALANT. TYP.

(N) TWO-PIECE CLOSURE METAL

AROUND ALL 3 SIDES. TYP.

TOP OF PARAPET WALL. TYP.

V.I.F.

(N) VERTICAL CLOSURE SHEET METAL

TO BE INSTALLED OVER (N) VERTICAL

TERMINATION BAR @ ALL VERTICAL

WALL TERMINATIONS.

(ETR) PENETRATION.

6" to 18"

FIELD SEAM

(N) EPDM MEMBRANE.

TAPED/ADHERED SEAMS. TYP.

(N) MEMBRANE BASE FLASHING. TYP.

8" M

IN

(N) LAP SEALANT. TYP.

REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

REFER TO R-102

FOR FULL ROOF

ASSEMBLY.

JOINT COVER @ ALL FLASHING-TO-SEAM

INTERSECTION LOCATIONS.

GRIND OFF (E) PAINT

TO PROVE CLEAN

STEEL SURFACE FOR

EPDM FLASHING, TYP.

METAL BASE PLATE. TYP.

LIGHTNING ROD. TYP.

36" MAX.

SPACING. TYP.

36" MAX.

SPACING. TYP.

CABLE. TYP.

(N) MANU. APPROVED TWO PART

POURABLE SEALER OR POLYETHER

ADHESIVE/SEALANT @ ALL BASE

PLATE LOCATIONS. TYP.

(N) PMMA OR EPDM

MEMBRANE SURFACE. TYP.

NOTES:

· ROOFING CONTRACTOR TO COORDINATE WITH CERTIFIED LIGHTNING PROTECTION CONTRACTOR FOR

ALL - ROOF, PARAPET WALLS, SCREEN WALLS, ETC. - (E) LIGHTNING PROTECTION REMOVAL AND ONSITE

STORAGE DURING CONSTRUCTION.

· CONTRACTOR TO ENSURE ALL LIGHTNING PROTECTION COMPONENTS ARE COLLECTED AND MAINTAINED

DURING STORAGE.

· ANY DAMAGED, BROKEN, OR MISSING COMPONENTS ARE TO BE DOCUMENT AND SUBMITTED TO AMTECH

AND THE OWNER IN WRITING.

· REFER TO ROOF PLANS FOR APPROXIMATE LIGHTNING PROTECTION LOCATIONS.

· PROPOSED LIGHTNING PROTECTION PLAN AND REINSTALLATION METHODS AND CERTIFICATION AS

SHOWN WITHIN THESE DESIGN DOCUMENTS ARE TO BE A DEFERRED SUBMITTAL/ DELEGATED DESIGN

COORDINATED BY THE ROOFING CONTRACTOR.

(N) EPDM ROOF SYSTEM(ETR) EPDM ROOF SYSTEM

6" MIN.

12" WIDE CONT. CURED EPDM STRIPPING PLY. TYP.

(ETR) ROOF

ASSEMBLY.

(ETR) EPDM ROOF

MEMBRANE.

(N) FASTENERS AND PLATES @ 12" O.C. MAX.

AROUND FULL PERIMETER OF EPDM REPAIR

WHERE (N) EPDM TIES INTO (ETR). TYP

(N) EPDM ROOF

MEMBRANE (FA).

(N) COVER BOARD

ENSURE TIE-IN DETAIL WILL NOT CREATE

PONDING DUE TO EXISTING CONDITIONS.

PLOT SCALE IS 30x42

ISSUED FOR

SHEET NO.

SHEET TITLE

PROJECT

CLIENT

DATE REVISION

DRAWN BY

CHECKED BY

PROJECT NO.

DATE

LEGEND

OF

1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222

(303) 738-0823 | www.amtechsls.com

AMTECH

SOLUTIONS

KEYPLAN LEGEND

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

2801 WEST 9TH STREET

CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF

PROJECT

2801 WEST 9TH STREET

CRAIG, CO 81625

DEN.2023.001003

06/2023

1 ADDENDUM 108/21/2023

100% CONSTRUCTION DOCUMENTS

RKP & DD

IL

ROOFING DETAILS

R-501 07 08

(N) EXPANSION JOINT DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(N) PRE-FABRICATED PENETRATION FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

HOT FLUE PENETRATION FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(N) PARAPET FLASHING @ ADJACENT WALL TIE-IN DETAIL

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(N) VERTICAL TERMINATION DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

LIGHTNING PROTECTION BASE PLATE ATTACHMENT (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(N) FIELD WRAPPED FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(N) TO (E) EPDM TIE-IN DETAIL (TYPICAL)

AA

(E) DRAIN BOWL - RAISE AS NECESSARY TO PROVIDE

SMOOTH TRANSITION TO ROOF ASSEMBLY. TYP.

RE: 'TAP AND DIE' NOTES.

(E) DECK.

AA

REFER TO R-102

FOR FULL ROOF

ASSEMBLY

REFER TO R-102

FOR FULL ROOF

ASSEMBLY

(N) 12" x 12" TAPERED EDGE

DRAINAGE SUMP.

VERIFY IN FIELD. TYP.

USING A 18" DRILL BIT, DRILL WEEP HOLES

(MIN. OF 4) @ BASE OF THE OVERFLOW

COLLAR TO ALLOW FOR PONDING DRAINAGE.

REPLACE ALL BROKEN/ MISSING/ BEE-HIVE

OR PLASTIC DRAIN STRAINERS WITH (N)

STEEL OR ALUMINUM STRAINERS. TYP.

(N) WATER CUT-OFF MASTIC BEHIND ROOF

MEMBRANE. ENSURE MEMBRANE IS CUT

BACK TO A MINIMUM OF 1" FROM THE

CLAMPING RING. TYP. REFER TO A-A.

TAP AND DIE NOTES:

1. (E) DRAIN BOWL AND LEADERS TO REMAIN.

2. CLEAN, PRIME, AND PAINT (E) DRAIN BOWL ASSEMBLY.

3. ALL (E) CLAMPING RINGS AND STRAINERS TO BE REPLACED WITH (N).

4. TAP AND DIE (E) DRAIN BOWL BOLT CONNECTIONS AS REQUIRED TO

ENSURE DRAIN FLASHINGS AND CLAMPING RINGS ARE ADEQUATELY

SEALED AND MADE WATER TIGHT. NOTIFY AMTECH AND ADAMS COUNTY

PRIOR TO COMMENCING ANY AND ALL WORK THAT WOULD REQUIRE TAP

AND DIE OF EXISTING CONDITIONS.

5. INSTALL A (N) CONT. BED OF WATER CUT-OFF MASTIC BETWEEN THE TOP

OF THE DRAIN BOWL AND MEMBRANE FLASHING, ENSURING THE FLASHING

IS FULLY COMPRESSED BY THE CLAMPING RING ONCE INSTALLED.

(N) 12" x 12" TAPERED EDGE

DRAINAGE SUMP.

REPLACE ALL BROKEN/ MISSING/

BEE-HIVE OR PLASTIC DRAIN

STRAINERS WITH (N) STEEL OR

ALUMINUM STRAINERS. TYP.PRIMARYOVERFLOW

(N) COVER BOARD. TYP.

(N) EPDM

WALL/ CURB

FLASHING. TYP.

3" M

IN.

(N) UNCURED EPDM

CORNER FLASHING

(BOTTOM LAYER). TYP.

(N) BASE

FLASHING AND

RTS STRIP. TYP.

VERTICAL LAP

SPLICE @

MEMBRANE

FLAP. TYP.

(N) EPDM WALL

FLASHING. TYP.

(N) EPDM FIELD

MEMBRANE. TYP.

STEP 1

(N) 6" WIDE

UNCURED

EPDM

FLASHING (TOP

LAYER). TYP.

(N) CONT.

BEAD OF

SEALANT.

TYP.

(N) CONT.

BEAD OF

SEALANT.

TYP.

3"

MIN.

2"

MIN.

STEP 2

(N) EPDM FIELD

MEMBRANE. TYP.

(N) BASE

FLASHING AND

RTS STRIP. TYP.

RE: A/R-500.

(N) EPDM

CURB

FLASHING.

TYP.

3"

MIN.

3"

MIN.

STEP 1

(N) UNCURED

EPDM OUTSIDE

CORNER

FLASHING. TYP.

(N) CONT.

BEAD OF

SEALANT.

TYP.

STEP 2

(N) WATER CUT-OFF MASTIC BEHIND

ROOF MEMBRANE. ENSURE MEMBRANE

IS CUT BACK TO A MINIMUM OF 1" FROM

THE CLAMPING RING. TYP.A-A

(ETR) RIGID INSULATION. V.I.F.

(ETR) ROOF EDGE BLOCKING. V.I.F.

(ETR) SHIM. V.I.F.

(ETR) ALUMINUM BENT PLATE. V.I.F.

(N) JOINT SEALANT

(N) CONTINUOUS GALVANIZED CLEAT

EXTEND (N) MEMBRANE

ROOF OVER PLYWOOD

(N) PRE-FINISHED METAL GRAVEL STOP DRIP

EDGE, COLOR TO MATCH METAL PANEL. TYP.

(N) SHEATHING FASTENED AT 12-INCHES O.C.

STAGGERED TO ENSURE ALIGNMENT WITH (N)

ROOF SYSTEM ELEVATION

(N) CONT. BEAD OF LAP SEALANT

(N) MEMBRANE ROOF FLASHING

(N) COVER BOARD.

12" V.I.F.

(ETR) PLYWOOD SHEATHING.

(E) HVAC UNIT, ENSURE THAT FINISHED

CURB HEIGHT COMPLIES WITH CODE

AND GUARANTY REQUIREMENTS.

6"

MIN.

NOT ALL CONDITIONS ARE SHOWN

ADHERED/TAPED SEAM WITH

6" COVER STRIP.

CUT BACK (E) ROOF MEMBRANE, LEAVING

A MIN. OF 6" OF OVERHANG.

(N) ROOF MEMBRANE AS SPECIFIED.

APPROVED SEALANT, TERMINATION BAR

AND FASTENER ATTACHED @ 8" O.C.

BONDING ADHESIVE.

(N) WATER CUT-OFF MASTIC.

THIS DETAIL IS TO ONLY BE

USED AT LARGE MECHANICAL

EQUIPMENT THAT CANNOT BE

LIFTED TO ALLOW FOR THE

NEW MEMBRANE TO BE

EXTENDED OVER THE TOP OF

THE CURB, WHERE NEW SLIP

COUNTER FLASHING CANNOT

BE INSTALLED, AND WHERE

FLASHINGS HEIGHTS EXCEED

8", AS SHOWN IN STANDARD

CURB FLASHING DETAIL.

USE OF THIS ALTERNATE

DETAIL MUST BE APPROVED

BY THE ROOF CONSULTANT.

PLOT SCALE IS 30x42

ISSUED FOR

SHEET NO.

SHEET TITLE

PROJECT

CLIENT

DATE REVISION

DRAWN BY

CHECKED BY

PROJECT NO.

DATE

LEGEND

OF

1720 South Bellaire Street, Suite 1200 Denver, Colorado 80222

(303) 738-0823 | www.amtechsls.com

AMTECH

SOLUTIONS

KEYPLAN LEGEND

COLORADO NORTHWESTERN

COMMUNITY COLLEGE

2801 WEST 9TH STREET

CRAIG, CO 81625

CNCC ACADEMIC BUILDING ROOF

PROJECT

2801 WEST 9TH STREET

CRAIG, CO 81625

DEN.2023.001003

06/2023

1 ADDENDUM 108/21/2023

100% CONSTRUCTION DOCUMENTS

RKP & DD

IL

ROOFING DETAILS

R-502 08 08

(E) PRIMARY AND OVERFLOW DRAIN SUMP AND FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

3a

(N) INTERIOR CORNER FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

3b

(N) INTERIOR CORNER FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

4a

(N) EXTERIOR CORNER FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

4b

(N) EXTERIOR CORNER FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

(E) ALUMINUM CHANNEL FLASHING DETAIL (TYPICAL)

NOTE: SIMILAR - ACTUAL CONDITIONS MAY VARY (N.T.S.)

LARGE HVAC TIE-IN DETAIL (TYPICAL)

Meeting Date:

Project:

Place/Room:

Facilitator:

Firm Representative Phone E-Mail

B&M Roofing of CO Inc Scott Kawulok 303-443-5843 skawulok@bmroofing.com

Amtech Solutions Robert Piane, 970-485-9618

Douglass Colony Group Michael Cohig MCoohig@douglasscolony.com

Superior Roofing Alex Hannum 720-490-6299 ahannum@superiorroofing.com

Pitt Roofing Inc Dianna Harrison 435-789-6898 pittroofinginc@outlook.com

Shawn Logan CMC Roofing 720-537-0175 shawnlogan@cmcroofing.com

CNCC FY24-001 Academic Building Roof, Recover

Virtual, 2:30 PM

Hailee Russell & Lindsey Blake

Thursday, August 17, 2023

Meeting Sign-In Sheet

PRE-BID

CONFERENCE

AUGUST 17,2023

C N C C F Y 2 3 - 0 0 7

S O L I C I T A T I O N N O : F Y 2 4 - 0 0 1

A C A D E M I C B U I L D I N G R O O F R E C O V E R

C R A I G C A M P U S

MEETING OVERVIEW

• Sign in please – This pre-bid meeting is mandatory, CNCC will only accept bids from firms who are in attendance.

• Questions – Feel free to interrupt any anytime with questions. Scope related questions, please submit in writing to the Purchasing Coordinator, an Addendum will be posted with answers.

• Project Description

• Schedule

PROJECT

DESCRIPTION

PROJECT

DESCRIPTION

CON’T

• Project may have prevailing wage requirements if contract is $500k or greater.

• Building will be occupied: CNCC will coordinate with selected contractor to vacate space below work.

MINIMUM

REQUIREMENTS

SCHEDULE

QUESTIONS

• Scope of work questions please submit to Hailee Russell, CNCC

Purchasing Coordinator:

• Hailee.Russell@cncc.edu mailto:Hailee.Russell@cncc.edu

CNCC FY24-001 -Addendum 1
20230821_CNCC Academic Bldg Roof_Addendum 1
20230821 CNCC Roof Replacement Drawings_A1
Sheets and Views
20230821 CNCC Roof Replacement Drawings_A1-R-100-COVER SHEET
20230821 CNCC Roof Replacement Drawings_A1-R-101-DESIGN NOTES
20230821 CNCC Roof Replacement Drawings_A1-R-102-ROOF ASSEMBLIES
20230821 CNCC Roof Replacement Drawings_A1-R-200-WIND DESIGN
20230821 CNCC Roof Replacement Drawings_A1-R-300-PLANS
20230821 CNCC Roof Replacement Drawings_A1-R-500-ROOFING DETAILS
20230821 CNCC Roof Replacement Drawings_A1-R-501-ROOFING DETAILS
20230821 CNCC Roof Replacement Drawings_A1-R-502-ROOFING DETAILS
Sign-In Sheet - CNCC FY24-001
Pre – Bid FY24-001
Slide 1: Pre-Bid Conference August 17,2023
Slide 2: Meeting Overview
Slide 3: Project description
Slide 4: Project Description Con’t
Slide 5: Minimum Requirements
Slide 6: Schedule
Slide 7: Questions