Absd-boiler & hot water pump upgrades phase 2
Closed State & local contract opportunity Posted
- Solicitation number
- RFP ABS 260000001269 5
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 20121003 Acidizing pumping units
- 40151534 Cryogenic pumps
- 40151546 Axial split pumps
- 40151569 Monoflex pump
- 40151575 Brushless coolant pump
- 40151580 Lubricator pump
- 40151582 Treadle pump
- 40151515 Solenoid pumps
- 40151528 Oscillating pumps
- 40151550 Duplex pumps
Show all 47
- 40151551 Gear pumps
- 40151568 Pulp pump
- 40151570 Mixed flow pump
- 40151573 Magnet pump
- 40151581 Multi stage pump
- 40151724 Dosing pump spare parts
- 40151740 Pump spare parts and accessories
- 40151514 Steam pumps
- 40151558 Screw Pumps
- 40151562 Worm pumps
- 40151565 Macerator pump
- 40151572 Air lift pump
- 40151574 Ejector pump
- 40151576 Mortar pump
- 40151588 Industrial pumps
- 40151728 Pump repair kits
- 12163000 Mud removal mixtures
- 40151700 Pump parts and accessories
- 20121109 Cement pumping units
- 20121207 Fracturing pumping units
- 40151505 Dosing pumps
- 40151508 Mud pumps
- 40151509 Reciprocating pumps
- 40151516 Shear pumps
- 40151518 Sealless pumps
- 40151519 Sanitary pumps
- 40151522 Reverse osmosis pumps
- 40151530 Dredge pumps
- 40151554 Ram pumps
- 40151559 Simplex pumps
- 40151560 Sliding vane pumps
- 40151561 Triplex pumps
- 40151567 High temperature pump
- 40151571 Inline pump
- 40151577 Grouting pump
- 40151578 Diving air pump
- 40151579 Gravity pump
Updated .
About this opportunity
Anchor Bay School District is procuring an Energy Savings Performance Contract for Phase 2 boiler and hot water pump upgrades across four school buildings—Ashley Elementary, Naldrett Elementary, North Middle School, and South Middle School—located in Wayne County, Michigan. The project involves the complete removal and replacement of existing boilers and hot water pumps with high-efficiency sealed-combustion boilers and new pumps to improve heating system efficiency and reduce operational costs. Deliverables include mechanical and electrical work comprising demolition of obsolete equipment, installation of new HVAC components with variable frequency drives (VFDs), building automation system integration, comprehensive testing and balancing, commissioning, and a minimum one-year subcontractor workmanship warranty on all installed equipment. Bidders must submit proposals by March 11, 2026 at 2:00 PM at the district's Administrative Office, with a mandatory pre-bid walkthrough scheduled for February 27, 2026 at 1:30 PM at the Maintenance Office in New Baltimore, Michigan, followed by individual site visits to each school. The project is administered by Centrix Energy Partners, LLC as the Construction Manager, with a Notice to Proceed anticipated for March 26, 2026 following a Board of Education meeting, construction to commence by May 21, 2026, and substantial completion required by October 1, 2026. Required qualifications include documentation of comparable project experience from the past five years, a list of proposed subcontractors with proof of bonding and insurance capabilities, submission of a 2.5 percent bid bond, compliance with Michigan Prevailing Wage rates, payment and performance bonds covering the full contract amount, and certifications regarding the Iran Economic Sanctions Act and familial disclosures. Evaluation criteria emphasize pricing competitiveness, contractor experience, service quality guarantees, and subcontractor qualifications, with all awarded contractors required to maintain comprehensive insurance coverage and comply with prevailing wage requirements and OSHA safety standards.
The procurement contains no specific set-aside designations for disadvantaged enterprises or minority-owned businesses based on the available documentation, though all contractors must comply with applicable Michigan public school business practices and local, state, and environmental regulations. Centrix Energy Partners, LLC serves as the Construction Manager and primary contractor overseeing project administration and subcontractor coordination. Substitution requests for equipment or materials must be submitted in PDF format via email to Centrix Energy Partners at least five days prior to the bid date with detailed comparative analysis and supporting documentation. The bid form requests pricing for base bid items including boiler and pump installations at each building location with unit pricing for propylene glycol, plus three optional alternates covering variable frequency drives, concrete housekeeping pads, and glycol feeder assemblies; specific budget ranges or award values are not disclosed in the procurement documents. All work must integrate with existing building automation systems and comply with Division 26 electrical specifications, National Electrical Code standards, NEMA requirements, and local building codes, with the contractor responsible for obtaining all permits and inspection fees and submitting final inspection certificates from local authorities within thirty days of contract signing.
Files
Show all 17
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity