IDIQ Professional Engineering Services Construction Material Testing and Geotech
Open State & local contract opportunity Posted
- Solicitation number
- 2026
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- Points of contact
-
- Cody Malin cody.malin@lnva.dst.tx.us (409) 550-5752
- Darian Gavin darian.gavin@dallascounty.org (214) 653-7437
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Lower Neches Valley Authority is requesting sealed bids for hot-tap and removal of sixteen abandoned pipeline crossings at LNVA canal systems in Jefferson and Chambers County, Texas, with bids due September 3, 2026 at 2:00 p.m. and a pre-bid conference on August 31, 2026 at 2:00 p.m. (virtual attendance available).
Work scope includes coordination with Texas One-Call excavation safety notification; submission of a written hot-tap and removal plan using Best Management Practices to prevent pipeline residue from contaminating LNVA rights-of-way or waterways; site access matting; investigation of each pipeline for holes and casing; hot-tapping in accordance with current industry safety standards; determination of line contents and pressure; collection and off-site disposal of removed materials in a legal manner; and capping or plugging of remaining pipelines at or near LNVA rights-of-way. The contractor bears responsibility for means and methods. Contractor must provide any additional work based on findings on a case-by-case negotiated basis if lines contain contents or pressure.
Bidders submit unit pricing for four line items: mobilization and demobilization (lump sum); hot-tapping of 2" to 8" diameter pipelines (ten each); hot-tapping of 10" to 14" diameter pipelines (three each); and removal and disposal of pipelines in all sizes (sixteen each). Contract duration is specified by the bidder in calendar days from Notice to Proceed. Liquidated damages are assessed at $200 per calendar day for failure to meet completion timeline.
Bid security of 5% penal sum bid bond is required. Performance and payment bonds are required (contracts exceeding $100,000 and $25,000 respectively) equal to total contract amount. Insurance requirements include Commercial General Liability ($1,000,000 each occurrence / $2,000,000 aggregate for contracts over $100,000), Business Auto Liability ($1,000,000 combined single limit), Workers' Compensation as required by law, and Excess Liability/Umbrella ($5,000,000 for contracts over $100,000); all policies must name LNVA as additional insured with waiver of subrogation. Prevailing wage rates per U.S. Department of Labor apply. Bids remain subject to acceptance for 60 days following opening. Payment is made within 45 days of invoice receipt or service completion under Texas prompt payment law.
Opportunity text
2 versions
Update #2 · Latest ·
Provide materials testing and inspection services on an indefinite delivery/indefinite quantity basis. All Services will be authorized under individual Work Orders.
Update #1 ·
Work to be performed by the Contractor shall generally be as follows: a) Contractor shall perform coordination with Texas One-Call excavation safety and underground facility damage prevention notification system. b) Contractor shall provide a written hot-tap and removal plan to Owner for review and approval prior to mobilization. Plan shall utilize Best Management Practices (BMPs) to prevent possible residue in pipelines from contaminating LNVA rights of way or waterways. c) Contractor shall provide any matng necessary for access to the site(s). Such costs shall be included in the base bid. d) Contractor shall thoroughly investigate each pipeline identified for hot tap or removal to inspect for apparent holes and presence of casing. If existing holes in the pipeline are identified, hot tapping will not be required and therefore will not be paid. Where applicable, casing pipe shall be removed as necessary to hot-tap the carrier pipeline. Identification and removal of casing pipe as necessary shall be incidental to pay items for other work included in the Bid Form. e) Contractor shall hot-tap all pipelines identified for such work included herein and depicted in Exhibit A in accordance with current industry safety standards. Contractor shall be solely responsible for the means and methods determined appropriate for each identified pipeline. f) Upon successful hot-tapping, Contractor shall advise Owner whether or not contents or line pressure was encountered. g) If the line is found to be empty, Owner will direct Contractor to proceed with removal to the limits shown in Exhibit A, or as otherwise directed. If the line is found to contain contents or line pressure, Owner will advise Contractor how to proceed based on the findings. Any additional work required as a result of the findings will be negotiated on a case-by-case basis. h) Collect and dispose all removed materials off site in a legal manner. i) Contractor shall cap or plug remaining pipeline at or near LNVA right of way line in accordance with industry standard BMPs and all applicable regulations.