A twelve month supply of 50% liquid sodium hydroxide
Closed State & local contract opportunity Posted
- Solicitation number
- 25-022
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 015 Addressing, Copying, Mimeograph, And Duplicating Machine Supplies: Chemicals, Inks, Paper, Etc.
- 100 Barrels, Drums, Kegs, And Containers
- 115 Biochemicals, Research
- 175 Chemical Laboratory Equipment And Supplies
- 885 Water And Wastewater Treating Chemicals
- 890 Water Supply, Groundwater, Sewage Treatment, And Related Equipment, Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water
- UNSPSC codes
- 41120000 Laboratory supplies and fixtures
- 12160000 Additives
- 12165300 Adsorbent
- 12165302 Silica gel
- 12165303 Molecular sieve
- 41113649 Psophometer
- 30121722 PE rainwater and sewer separation walls
- 12165301 Ceramic ball
- 24112806 Static fuel container
- 31250000 Pneumatic and hydraulic and electric control systems
- Point of contact
-
- Michael Chamberlain machamberlain@hwws.com (956) 440-6560
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Harlingen Waterworks System (HWWS) is seeking proposals for a twelve-month supply of 50% Liquid Sodium Hydroxide through Bid No. 25-022, targeting approximately 1,282,000 pounds to be delivered to the Downtown Water Treatment Plant and M.F. Runnion Water Treatment Plant in Harlingen, Texas. The procurement requires sodium hydroxide that meets ANSI/AWWA B302-95 Standards and is acceptable to the EPA and Texas Department of Health for potable water treatment. Deliveries will be made in bulk shipments of approximately 4,000 gallons per load, exclusively between 8:00 a.m. and 3:00 p.m. on weekdays. Bidders must submit comprehensive documentation, including certified weight tickets, material safety data sheets, and be prepared to perform bench tests to determine cost-effective dosage. The proposal is due by 2:15 p.m. on Thursday, July 3, 2025, with a target award date of July 23, 2025. The initial contract term is one year, with two optional one-year extensions potentially extending the total contract duration to three years.
The solicitation does not explicitly outline specific set-aside designations or restrictions for disadvantaged enterprises. Bidders must provide proof of EPA registration numbers, laboratory qualifications, and comprehensive insurance coverage. The contract includes stringent quality control provisions, allowing for immediate product replacement and potential contract cancellation if the sodium hydroxide fails to meet specified standards. While the exact budget range is not specified, the procurement involves a substantial annual volume of approximately 1,282,000 pounds of chemical product. The successful vendor will be required to demonstrate technical capabilities, compliance with potable water treatment regulations, and ability to consistently meet delivery and quality specifications. The contract represents a critical procurement for the Harlingen Waterworks System's water treatment operations, with potential for a multi-year engagement based on performance and mutual agreement.
Opportunity text
This request for proposals is for 50% Liquid Sodium Hydroxide to be delivered to the Downtown Water Treatment Plant located at 412 N. 3rd, Harlingen, Texas 78550.
Files
| File | Type | Posted |
|---|---|---|
| 25-022 SPECS - 50% SODIUM HYDROXIDE.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity