751/26612. MAA; Various Dams - Engineering Studies
Open State & local contract opportunity Posted
- Solicitation number
- RFP 171 270000000169 2
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
Updated .
About this opportunity
The Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division, is procuring on behalf of the DNR Fisheries Division for a Phase 100 engineering study of two dams under File 751.26612.MAA, with proposals due December 3, 2026 at 2:00 p.m. Eastern. Eligibility requires a Michigan license to practice under the Occupational Code and Michigan-based business status certification as required. The mandatory pre-proposal site visits on November 4 and 5, 2026 and the written question deadline of November 12, 2026 have passed.
The study covers Tomahawk Creek Dam in Presque Isle County and Hoister Lake Dam in Gladwin County. For each dam, the consultant must evaluate removal, repair, and rebuild alternatives, weigh their pros and cons, develop cost estimates, and recommend an approach aligned with Fisheries Division goals. Required work includes full topographic surveys of embankments, inlet structures, downstream profiles, and cross-sections, plus video assessment of corrugated metal pipes to estimate remaining useful life. The consultant must also verify existing EGLE dam safety data and investigate reported crest subsidence at Hoister Dam. Follow-on Phase 300–700 services for design and construction administration will be solicited after Phase 100 completion.
Services are billed at billable rates on a not-to-exceed fee basis, with rates including fringe benefits, overhead, insurance, and indirect costs. Reimbursable expenses are permitted, and services not performed in-house may carry a markup not to exceed 5 percent. Proposals are scored 80 percent technical and 20 percent cost. Proposers must submit a single attachment not exceeding 25 megabytes through SIGMA VSS, with each dam broken out by phase and a grand total, and enter the total cost for all phases as the bid amount.
The source does not name a contract value. Post-deadline milestones include RFP review on December 11, 2026, a predesign meeting on January 5, 2027, a 50 percent recommendation review on April 2, 2027, and the 100 percent report due April 16, 2027. Contract award recommendation is expected within thirty days after the proposal due date.
Opportunity text
751/26612.MAA; Various Dams - Engineering Studies
Files
| File | Type | Posted |
|---|---|---|
| Addendum 1 751-26612.MAA.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| Project Statement 26612.pdf | ||
| Billable Rate 26612.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity