751/26612. MAA; 2 Dams - Engineering Studies
Open State & local contract opportunity Posted
- Solicitation number
- RFP 171 270000000169 3
- State
- Michigan
- Responses due
Opportunity facts
- NIGP code
Updated .
About this opportunity
Michigan's Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division, on behalf of the Department of Natural Resources (DNR) Fisheries Division, is soliciting proposals for a Phase 100 engineering study of Tomahawk Creek Dam and Hoister Lake Dam under solicitation 751/26612.MAA, due December 3, 2026 at 2:00 p.m. All proposals must include signed Certifications of a Michigan Based Business and Responsibility Certification forms.
The study evaluates removal, repair, and rebuild alternatives for each dam, including advantages and disadvantages, cost estimates, and an engineering recommendation aligned with Fisheries Division goals. Required work includes a full topographic survey of embankments, inlet structures, downstream profiles, and cross-sections; elevation data for the Tomahawk Creek boat launch and parking area; video inspection of corrugated metal pipes on both dams; and confirmation of full draw-down capability. Sedimentation management must follow Eagle Dam Safety 315. At Hoister Lake Dam, the study must preserve the bottom draw for trout while minimizing downstream warm water discharge. Work must comply with applicable EPA, OSHA, DOT, DCH, EGLE, DNR, and MIOSHA regulations. Phase 300-700 engineering design and construction administration will be priced separately after Phase 100 completion.
The contract is a not-to-exceed fee arrangement using billable hourly rates for all personnel classifications, with overhead and indirect costs incorporated into those rates. The bid amount is the total cost for all phases. Reimbursable expenses include printing, soil borings, site surveys, laboratory testing, and travel beyond 100 miles one-way at State of Michigan rates, with sub-consultant services subject to a maximum 5% markup. The state will not reimburse fringe benefits, vacations, insurance, meals, lodging, or other indirect costs.
Evaluation is 80% technical (Part I) and 20% cost (Part II). The state will recommend an award within thirty days after the proposal due date, and the RFP Review Committee meets December 11, 2026. Proposals must be submitted through SIGMA VSS, with a 25-megabyte file limit; technical and cost proposals may be combined into one attachment. Pre-proposal site visits (November 4 and 5, 2026) and the written question deadline (November 12, 2026) have passed, with replies due November 17, 2026. Later milestones include a predesign meeting on January 5, 2027, a 50% recommendation review on April 2, 2027, and a final 100% report due April 16, 2027.
Opportunity text
751/26612.MAA; 2 Dams - Engineering Studies
Files
| File | Type | Posted |
|---|---|---|
| Addendum 1 751-26612.MAA.pdf | ||
| Project Statement 26612.pdf | ||
| Billable Rate 26612.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf |