Addendum 1 751-26612.MAA.pdf
PDF 216 KB Posted
- Attached to
- 751/26612. MAA; 2 Dams - Engineering Studies
- Solicitation number
- RFP 171 270000000169 3
- Issued by
- Michigan
About this file
This Addendum No. 1 is issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division, in conjunction with the Michigan Department of Natural Resources (DNR) Fisheries Division. The project involves a Phase 100 Engineering Study for two dams: Tomahawk Creek Dam in Presque Isle County and Hoister Lake Dam in Gladwin County. The study will evaluate removal, repair, and rebuild alternatives for each dam, including investigation of pros and cons, cost estimates, and engineering recommendations aligned with DNR Fisheries operational and management goals. The Phase 100 Study requires a full topographic survey of embankments, inlet structures, downstream longitudinal profiles, and representative cross-sections. For Tomahawk Creek Dam specifically, the survey must include elevation data for the boat launch facility and parking area to correlate water levels with existing infrastructure. Following Phase 100 completion, the DNR will request separate cost proposals for Phase 300-700 services covering engineering plan development and construction administration for the selected alternative. The proposal due date is December 3, 2026 at 2:00 p.m., and responses must be submitted to SIGMA VSS with a maximum file size of 25 megabytes. Proposers are encouraged to combine technical and cost proposals into a single attachment with each dam broken out by phase and a grand total provided.
Bidders must submit the total cost for all phases as the bid amount and should clearly delineate advantages and disadvantages of each alternative option. Key project considerations include sedimentation management per Eagle Dam Safety 315, the assumption that water flow through Tomahawk Dam is primarily from seepage due to an anticipated closed bottom draw system, incorporation of pending dam safety legislative requirements, video inspection of corrugated metal pipes on both dams, and the capability for full draw-downs on both dams for maintenance purposes. For Hoister Dam, the study must preserve the bottom draw for trout while minimizing warm water discharge downstream and must remain unbiased given the removal of nearby Trout Lake Dam. The addendum addresses various technical clarifications, including verification of existing survey data from DNR plans and EGLE dam safety inspection reports, the need for an initial topographic survey to proceed, and unresolved questions regarding subsidence repairs and crest conditions at Hoister Dam.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| Billable Rate 26612.pdf | ||
| Project Statement 26612.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 01
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
11/13/2026
PROJECT NAME
Tomahawk Dam – Presque Isle and Hoister Dam, Gladwin Co.
FILE NUMBER
751/26612.MAA
PROJECT DIRECTOR
• Maria Alvaro, RA , LEED AP
PROPOSAL DUE DATE:
December 3, 2026 @ 2:00pm
REWRITTEN PROJECT DESCRIPTION/SERVICES REQUESTED:
DNR Fisheries is requesting a Phase 100 Engineering Study on Tomahawk Creek Dam, Presque Isle County (T33N, R02E, S27) and Hoister Lake Dam, Gladwin County (T20N, R02W, S.8&9). The purpose of this study is to evaluate the removal, repair, and rebuild alternatives for each dam. The study should investigate the pros and cons of each alternative, develop cost estimates for each alternative, and provide an engineering recommendation based on the operational and management goals of Fisheries Division. Following the successful completion of the Phase 100 Study, the DNR is requesting cost proposals for Phase 300-700 services for the Development of Engineering plans and construction administration services for the selected alternative.
The Phase 100 Study should include full topographic survey of the embankment and inlet structure and include downstream longitudinal profile and at least one representative bank full cross section.
For Tomahawk Creek Dam, the topographic survey should include elevation information for the boat launch including elevations at the bottom of the concrete launch ramp, top of concrete launch ramp and for the limits of the asphalt paved parking lot and entrance drive. The purpose of this survey is to correlate water levels for varying levels of pool elevations versus existing infrastructure at the boating access site. Any proposed outcome of the dam should consider impacts to the boating access site.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS.
https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4
• Please enter the total cost for all phases as the bid amount.
• Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission, with each dam broken out by Phase and totaled, then a grand total of both dams.
• Please remember that attachments can be no larger than 25mb.
http://www.buy4michigan.com/ https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4
751.26612 Tomahawk and Hoister Damn Clarifications and Questions
1. Sedimentation Management per Eagle Dam Safety 315
2. Tomahawk – existing bottom draw system is anticipated to be fully closed. The assumption is that all water flowing through the dam is from seepage.
3. Two existing dam safety bills have currently been passed by the House and Senate, but they are different. As these bills become resolved, the consultant shall ensure that any applicable regulatory impacts in incorporated in their documents,
4. Tomahawk and Hoister - Video corrugated metal pipes on both dams for useful life expectancy.
Video of Tomahawk is expected only for principal conduct; bottom draw conduit is assumed to be inaccessible.
5. Tomahawk and Hoister -Must be able to do a full draw down on both dams for maintenance.
6. Hoister – preserve bottom draw for Trout. Not sure if it is working. Must minimize warm water discharge downstream.
7. Hoister – No evidence elevation change.
8. Hoister - Trout Lake Dam is being removed; therefore, The study of Hoister must be non-biased and must have accurate cost estimates and clear delineation of advantages and disadvantages of each option.
9. What topographic data is available at each site from MI DNR? Only data shown on existing plans and EGLE dam safety inspection reports.
10. What is the extent, accuracy, and date of these surveys? Information on plans must be verified by consultant.
11. Does MI DNR anticipate the need for an initial topographic survey to proceed with the Phase 100 study. Yes.
12. Was the subsidence at the Hoister Dam crest over the outlet works noted in the 1988 inspection ever repaired? Unknown
13. Is there still a low spot in the crest at Hoister Dam? Unknown
14. Have further inspections Hoister of this location noted any changes to this subsidence?
Unknown
APPROVED BY: Maria Alvaro, Eric Cadeau, Doug Schultz
PROJECT DIRECTOR : Maria Alvaro DATE: 11/13/2026