Michigan's Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division, is soliciting sealed electronic bids for Bay City State Park Campground Improvements at 3582 State Park Drive, Bay City, Michigan, with bids due November 18, 2026 at 2:00 p.m. under File No. 751/22413.CTS. The advertisement selects no set-aside. An attached DTMB information sheet describes a 10% pricing preference for service-disabled veteran-owned businesses under Public Act 91 of 2005, available to businesses at least 51% owned by veterans with service-connected disabilities. Bidders must indicate SDVOB status in the bid and provide supporting documentation or National Veterans Business Development Council certification. The state does not pre-certify SDVOB businesses and does not accept federal CVE or SBA VetCert certifications for this preference.

The scope covers removal and replacement of the sanitation station, all water mains and service leads, and all campground electrical systems; replacement of jug fillers with three new hydrants; addition of 27 full-hook-up campsites with water and sanitary sewer; and minor grading for stormwater drainage. Waterline and electrical conduit installation at campground road crossings uses directional boring, with open excavation limited to the greatest extent possible. Turf, asphalt, and concrete restoration must be performed by dedicated landscape, asphalt, and concrete contractors, and hydroseeding runs through a single landscaping subcontractor. The base bid includes a $150,000 allowance and two additive alternates for copper conductor on the west and east sections. The geotechnical report identifies groundwater at 2.7 to 4.9 feet, peat layers in six borings, and recommends full-depth asphalt removal and replacement as the primary pavement option.

Contract time runs 152 calendar days from notice to proceed to substantial completion, with final completion 21 days later. Addendum 2 sets a July 4 completion deadline, states that no extensions or phased completion will be granted, and requires bidders to price equipment delivery premiums for long-lead electrical panels and breakers. Liquidated damages are $1,000 per day. Contractor must obtain LARA and Bay County Road Commission right-of-way permits, maintain a 20 percent float in the critical path schedule, and work daylight hours between 7:00 a.m. and 6:00 p.m., Monday through Friday, absent written authorization. Bid security equals 5% of the base bid, and bids remain valid for 90 days after opening. Bidders must register with State of Michigan project registration (SPR) and acknowledge Addendum 2 on the Bid Form, or risk rejection. The apparent low bidder must submit a Pre-Award Schedule (CPM or bar chart), a list of subcontractors, and questionnaire responses after opening.

The question period closed November 11, 2026 at 5:00 p.m. Anticipated State Ad Board approval is December 15, 2026, with a pre-construction kickoff and notice to proceed on January 6, 2027. Kristofer Enlow, P.E., of Beckett & Raeder, Inc. is the listed point of contact (kenlow@bria2.com), and Chris Schanbeck, P.E., is the project director.

Opportunity text

751/22413.CTS; Bay City State Park Campground Improvements