591/26017. JLM; Coldwater Welcome Center - HVAC Repairs
Closed State & local contract opportunity Posted
- Solicitation number
- RFQ 171 260000000398 2
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 72101511 Air conditioning installation or maintenance or repair service
- 72151006 Boiler pressure controller maintenance or repair or operation
- 72151207 Heating and cooling and air conditioning HVAC installation and maintenance service
- 72154102 Heat exchanger maintenance or repair service
- 72154110 Fin fan cooling tower maintenance and repair service
- 72151005 Boiler pressure controller installation
- 72154100 Distribution and conditioning system equipment maintenance and repair services
Updated .
About this opportunity
The Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division is requesting bids for full replacement of air handling units, condensing units, boilers, and boiler pumps at the MDOT Coldwater Welcome Center on I-69 Northbound (Mile Marker 6) in Coldwater, with bids due August 12, 2026 at 2:00 p.m. ET and a mandatory pre-bid meeting and site tour on July 30, 2026 at 9:00 a.m. ET. A 10% preference applies to Qualified Disabled Veteran (QDV) bidders under Michigan Public Act 91 of 2005; qualifying bidders must provide DD214 or VA Rating Decision Letter proof of service-connected disability and legal documentation of 51% or greater ownership, or submit current National Veterans Business Development Council certification.
The scope encompasses demolition and replacement of six air handling units (AHU-1 through AHU-6), six exterior condensing units (CU-1 through CU-6), two boilers (B-1 and B-2) with associated boiler pumps (P-1 and P-2), ductwork modifications, refrigerant piping, hydronic piping, condensate drainage, thermostats, sensors, and control systems. Work must comply with Michigan Mechanical Code, ASHRAE, SMACNA, NEC, and NFPA standards. The contractor must maintain minimum 60-degree indoor temperature, ensure five operational units are online by October 1, 2026 (heating season), complete final Testing, Adjusting, and Balancing, and provide mandatory 6- and 11-month post-construction warranty meetings. Cooling-season work (June 1 to October 1) requires completing all three units in one mechanical room before proceeding to the second room; heating-season work requires one-unit-at-a-time replacement with temporary electric heat as needed.
Contract time is 28 weeks (196 calendar days) from Notice to Proceed. Liquidated damages are assessed at $500 per calendar day for delays beyond substantial completion. A 5% bid security is required. Performance and payment bonds are mandatory for bids exceeding $50,000. Bidders must complete State Project Registration, provide commercial general liability insurance of at least $1 million per occurrence, worker's compensation, and builder's risk coverage. Questions are due August 5, 2026 at 5:00 p.m. ET directed to Devon Pung (dpung@matrixceinc.com). Addendum No. 1 was issued July 23, 2026; acknowledgment is required in the bid submission.
Opportunity text
591/26017.JLM; Coldwater Welcome Center - HVAC Repairs
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity