500 CY of class a concrete to repair NM532 (SKI run road) where road failure caused closure due to flooding. The damage is in three areas. We will be building a wall, backfilling and creating a cap.

Closed State & local contract opportunity Posted

Solicitation number
50-80500-24-EM113
State
New Mexico
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from spd.gsd.state.nm.us. Updated .

About this opportunity

The New Mexico Department of Transportation (NMDOT) has issued an emergency procurement for 500 CY of Class A Concrete to repair NM532 (Ski Run Road) where road failure caused closure due to flooding. The damage is in three areas, with the largest being over 200' long. The repair will consist of building a concrete wall, backfilling with 8"-12" rock, and creating a concrete cap along the length of the damaged road section. This emergency procurement is necessary to control a serious threat to public safety caused by the road failure, which poses the risk of completely washing out. Aggregate Technologies, LLC was the only vendor to respond to the request for quotes and has been selected for the $96,000 contract. The repair is crucial to prevent losing a long section of the road and ensure the safety of the traveling public. NMDOT plans to complete the concrete work by the end of August and then pave the following week to reopen the road as soon as possible.

This emergency procurement does not have any set-aside designations or restrictions on the types of organizations that can respond. Aggregate Technologies, LLC is the incumbent vendor selected for the $96,000 contract, which includes 8.1875% in taxes for a total of $103,860. NMDOT will be taking measures to prevent the need for similar emergency procurements in the future, such as installing concrete wall barriers to channel water and improve drainage.

Opportunity text

2 versions

Update #2 · Latest ·

Due to the Ruidoso fires and floods NM532 (Ski Run Road) closed due to road failure. There is a potential of losing a long section of this road which is unsafe for the traveling public. NMDOT will be adding a wall, backfilling with 8"-12" rock, and creating a concrete cap along the length of failure. Repair will consist of 500 CY of class "A" concrete along the length of the damaged road. New Concrete wall barrier to prevent overflow, water pressure and backfilled with 8" to 12" rock to provide structural support, improve drainage and prevent voids. Building a cap to reinforce road along the length of the failure to prevent erosion while enhancing structural integrity.

Update #1 ·

The New Mexico Department of Transportation (NMDOT) has issued an emergency procurement for 500 CY of Class A Concrete to repair NM532 (Ski Run Road) where road failure caused closure due to flooding. The damage is in three areas, with the largest being over 200' long. The repair will consist of building a wall, backfilling with 8"-12" rock, and creating a concrete cap along the length of failure. This emergency procurement is necessary to control a serious threat to public safety caused by flooding and fire damage in the Ruidoso area. The contractor, Aggregate Technologies, LLC, was selected to provide the concrete at a cost of $96,000 excluding taxes. The repair is crucial to prevent losing a long section of the road and to ensure the safety of the traveling public.