480V Motor Control Center Bus A&B Replacement at Studios North
Closed State & local contract opportunity Posted
- Solicitation number
- RFSQ-07537
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
The Central Florida Tourism Oversight District (CFTOD) has issued an Invitation to Bid (ITB) for the replacement of Motor Control Center (MCC) A&B and associated electrical equipment at the Studios North Central Energy Plant in Orange County, Florida. The selected consultant will be responsible for providing professional engineering services for the design, bidding, permitting, and construction phase of this project. The MCC A&B are 480V switchboards that supply power to critical cooling loads, and the project requires careful planning and sequencing to maintain continuity of service during the replacement process. The ITB is hosted on the CFTOD's new electronic bidding platform through PlanetBids, and interested vendors must register on the platform to submit questions and bids. The project has a bid due date of February 1, 2024.
The CFTOD has bid preferences for local vendors, veteran small businesses, and opportunity zone businesses on most solicitations, as outlined in their Procurement Policy. The project is located in Orange County and Lakeland City, Florida, and the CFTOD does not disclose any incumbent vendors or current contractors. The budget range for this project is not provided in the ITB documentation.
Opportunity text
The selected consultant shall provide professional engineering services designing, bidding, permitting, and construction phase services for the replacement of Motor Control Center (MCC) A & B and ancillary equipment changes. The project work is located within the Studios North Central Energy Plant (SNCEP).
The MCC A & B are two 480V switchboards that supply dedicated power to each chiller motor, pump motor, fan motor and auxiliary transformer to serve the connected building loads. Each 480V bus is served by a dedicated padmount transformer through a main circuit breaker. All loads on both busses may be serviced from either transformer through a MCC Bus A/B tie circuit breaker in a Main-Tie-Main scheme.
This project involves the design of the replacement of the existing MCC A & B and auxiliary electrical equipment with new electrical equipment. Because of the critical cooling loads supplied by the MCC A & B busses, continuity and quality of services is of the utmost importance during the replacement process and sequencing of load transfers to the new MCC A & B equipment must be part of the overall design.
Files
| File | Type | Posted |
|---|---|---|
| C006499 MFMP ITB Flyer (Rev. 01-10-24).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity