472/26613. TAP; Boston Pond - Dam Study

Open State & local contract opportunity Posted

Solicitation number
RFP 171 270000000208 2
State
Michigan
Responses due

Opportunity facts

Jurisdiction

Updated .

About this opportunity

The Michigan Department of Technology, Management and Budget (DTMB), Design and Construction Division, on behalf of the Department of Natural Resources (DNR) Fisheries Division, is soliciting proposals for a Phase 100 engineering study of the Boston Pond Dam in Houghton County, with proposals due 2:00 p.m. Eastern on November 19, 2026. Proposers must submit a Certification of a Michigan Based Business with their proposal, and a Responsibility Certification is also required.

The study will evaluate the dam's current condition and analyze removal, repair, and rebuild alternatives, including cost estimates and engineering recommendations aligned with Fisheries Division management goals. Required services include material condition assessments, non-destructive testing, sampling, boring, and inspection scheduling, with 50% and 90% draft study reports and biweekly progress summaries. The dam is in Franklin Township, approximately 4.5 to 5 miles north of Hancock on US-41. The professional is ineligible to bid on construction resulting from the design documents, and may not employ firms expected to bid construction unless the Department authorizes it in writing. Proposals must include a Budget Analysis section and must comply with DTMB Form 430 and the DTMB billing rate professional services contract standards.

Pricing is a not-to-exceed fee built from billable hourly rates multiplied by estimated hours per phase. Sub-consultant fees carry a markup of no more than 5%. Reimbursable expenses are allowed at actual cost with no markup for in-house work, and a markup of up to 5% applies to third-party work. Travel beyond 100 miles one-way from the firm's office is reimbursable at State of Michigan rates. Proposals are evaluated 80% on technical merit and 20% on cost. The state expects an award recommendation within 30 days after the due date, with contract commencement anticipated January 1, 2027. If the budget proves insufficient, proposal revision may be requested by addendum to fund as many services as possible, with additional funding sought for phases excluded from the initial award.

Addendum No. 1, issued November 13, 2026, following the mandatory pre-proposal walk-through on November 9, clarified eight matters. EGLE is identified as the source for existing hydrologic and hydraulic data, DNR holds no existing modeling or bathymetric surveys, portions of the embankment sit on private property within DNR easements, and the study must identify fisheries restrictions tied to the Type 1 Trout Stream designation. Proposers may include a separate alternate cost for watershed analysis if they consider it professionally necessary. The question deadline of November 12, 2026 has passed.

Opportunity text

472/26613.TAP; Boston Pond - Dam Study

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors