RFP Addendum 1 26613.pdf

PDF 125 KB Posted

Attached to
472/26613. TAP; Boston Pond - Dam Study
Solicitation number
RFP 171 270000000208 2
Issued by
Houghton County, Michigan

About this file

This is an RFP Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Boston Pond Dam Engineering Study (File Number 751/26613.TAP). The project, managed by Project Director Tom Pawlowski, requires professional engineering services to conduct a comprehensive analysis of the Boston Pond Dam, including assessment of structural conditions, hydrologic and hydraulic evaluation, and examination of repair, rebuilding, and removal options. The addendum was issued on November 13, 2026, following a mandatory pre-proposal meeting and site walk-through inspection held on November 9, 2026. The proposal due date is November 19, 2026.

The addendum provides critical clarifications addressing proposer questions on eight substantive matters. Key points include: existing hydrologic and hydraulic data and flood discharge information are believed to be available through the Department of Environment, Great Lakes and Energy (EGLE), though detailed cross-sectional data may be limited; the Department of Natural Resources (DNR) holds no existing modeling or bathymetric surveys; portions of the dam embankment are located on private property but fall within DNR easements; no known tribal ownership interests have been identified; the study should identify fisheries-related restrictions associated with the Type 1 Trout Stream designation; the scope focuses primarily on engineering analysis rather than comprehensive environmental impact studies, with potential for future studies pending initial results; and proposers should include a separate alternate/allowance cost for watershed analysis if deemed professionally necessary. Proposers must address the Budget Analysis section in their technical proposals based on professional opinion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 1

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.

Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

11/13/26

PROJECT NAME

Boston Pond Dam – Engineering Study

FILE NUMBER

751/26613.TAP

PROJECT DIRECTOR

Tom Pawlowski

PROPOSAL DUE DATE:

11/19/26

This Addendum is issued to provide additional and corrected information to proposers as requested, distributed or identified at the mandatory pre-proposal meeting and walk-through-inspection conducted on November 9, 2026.

Item 1 – Clarification – The following compound question comprises what was asked at the Preproposal meeting and received since then. A response is provided.

Question: Are there any existing hydrologic and hydraulic (H&H) models, bathymetric surveys, or other historical engineering data available for Boston Pond Dam? Should watershed modeling be included in the scope?

Response: It is believed that the Department of Environment, Great Lakes and Energy (EGLE) resources for this location would have flood discharge data/info and base hydraulic analysis conducted to store/pass flood flows. It is suspected that those resources are unlikely to contain stream cross-sections or longitudinal cross-sections. The Department of Natural Resources (DNR) has no modeling info or reports, no bathymetric surveys, and no historical engineering data. DNR is obligated (via Conveyance of Flowage Easement document, circa 1965) to maintain an ordinary impoundment water level not-to-exceed Elev. 1068.2, and emergency level not-to-exceed Elev. 1070. It is anticipated that sufficient watershed evaluation be done to assess or estimate the impact of flow/flood conditions that may occur with and without the dam in place, and for any other scenario proposed. Firms should include in their pricing, separate from their base proposal price, an alternate/allowance cost for watershed analysis if their firm is of the professional opinion that a watershed analysis will be necessary to properly complete an engineering analysis as needed for dam repair, rebuilding, removal, etc. evaluation.

Item 2 – Clarification – The following compound question comprises what was asked at the preproposal meeting and received since then. A response is provided.

Question: Is any section of the dam embankment located on private property? If so, are there any property ownership or access restrictions that should be considered during the study?

Response: Yes, there are portions of the dam embankment located on private property, and those portions are understood (via Conveyance of Flowage Easement document, circa 1965; Road Easement Release document, circa 1967) to be wholly within the easements that DNR has. It is not anticipated that scope elements within a study will provoke tasks that will challenge any easement use considerations.

http://www.buy4michigan.com/

Easement documents will be provided to the awarded firm for consideration, since there may be elements of those easement conditions that need to be considered for dam repair, rebuilding, removal, etc.

Item 3 – Clarification – The following question comprises what was asked at the preproposal meeting and received since then. A response is provided.

Question: Are there any known tribal ownership interests or potential tribal coordination requirements associated with the dam or surrounding project area?

Response: There are none that we are currently aware of.

Item 4 – Clarification – The following question was received since the preproposal meeting. A response is provided.

Question: Are there any additional fisheries-related restrictions, environmental considerations, or permitting requirements associated with the watercourse’s Type 1 Trout Stream designation that should be accounted for in the study?

Response: If there are, the study should identify them, short of getting permits, but determining likely regulatory positions and common requirements for the location.

Item 5 – Clarification – The following questions were received since the preproposal meeting. A single response is provided to address both.

Question: Is the study intended to focus the report on the structural condition and aspects of the dam/impoundment or are environmental impact study issues to also be included?

Question: How likely is it that the dam is going to be removed / is that the DNR's desire if the results of the study are favorable to that? If it is likely, it seems there could be a desire for various studies related to the impacts of the removal, so should we include services for those at this time, or would they be added later if the first part of the study results is leaning that way? The project statement says to assume the DNR would handle the mussels and fisheries surveys, but I think there are other items beyond that to consider too.

Response: Without completed professional study and recommendations, the agency is not in a position to comment on likelihoods or favorability to unevaluated options (e.g. removal). The study is to primarily complete an engineering analysis of going from the existing condition of the dam to reasonable outcomes, and to use the professional awareness of possible influencing factors to suggest what elements may be further factors or information that may need to be gathered that might influence each option. As stated at the preproposal meeting, where we are starting is for each firm to be specific in their proposal about what services will be provided. Then whether things need to be added later have a baseline for consideration.

Item 6 – Clarification – The following question was received since the preproposal meeting. A response is provided.

Question: Section 11-5 of the Request for Proposal document requests a Budget Analysis. Is the Budget Analysis required for this proposal?

Response: A complete/responsive proposal will include that portion of the Technical Section. A budget was not proposed in the project statement. Offer content appropriate to professional opinion on that.

Here ends PSC Pre-Proposal Addendum No. 1.

APPROVED BY:

Tom Pawlowski 11/13/26

PROJECT DIRECTOR DATE