472/26279. JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Open State & local contract opportunity Posted

Solicitation number
RFQ 171 270000000025 4
State
Michigan
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 19

Updated .

About this opportunity

DTMB's State Facilities Administration, Design & Construction Division, is soliciting bids for water softener and salt storage upgrades at Lakeland Correctional Facility in Coldwater, Michigan, with final questions due November 18, 2026 and bids due November 25, 2026 by 2:00 p.m. Eastern. Bidders claiming Service-Disabled Veteran-Owned Business status receive a 10% pricing preference under Public Act 91 of 2005, but the state does not pre-certify SDVOBs. Bidders must indicate SDVOB status in the bid and provide proof of service and discharge conditions (DD214 or equivalent), proof of service-connected disability (DD214 or VA Rating Decision Letter), and proof of business ownership. NVBDC certification may be submitted in place of these documents, subject to specified conditions. The state does not accept federal CVE or SBA VetCert certifications for this purpose. Bidders exceeding $100,000 must provide Michigan-Based Business Certification to qualify for reciprocity provisions, and Qualified Disabled Veteran forms are required as applicable.

The project replaces the existing water softening system and adds a reverse osmosis system in the Power Plant basement, along with brine silo storage, controls, and piping. Trades include general, site work, plumbing, controls, and electrical. Controls must be a BACnet standalone Direct Digital Control system with no connection to existing building networks or exterior communications. The contractor must maintain softened water and reverse osmosis service during construction, with only minor nighttime shutdowns approved by the Michigan Department of Corrections at least 10 days in advance. Addendum 2 names Brine Systems as an approved alternate brine silo manufacturer, provided it meets all construction document requirements.

The contract term is 36 weeks (252 calendar days) from Notice to Proceed, with liquidated damages of $750 per calendar day for delay beyond substantial completion. The base bid includes two allowances of $100,000 each. Bid security is 5% by certified check, money order, or bid bond. Performance and payment bonds are required for contracts exceeding $50,000. Bids remain valid for 60 calendar days after opening. Bidders must submit proof of State Project Registration from the Department of Labor and Economic Opportunity with their bids. Prevailing wage applies under 2023 PA 10, as amended, with certified payroll required. Bidders must acknowledge all addenda, and failure to do so may result in rejection.

Questions go to Devon Pung at Matrix Consulting Engineers, Inc., by 5:00 p.m. Eastern on November 18, 2026, per Addendum 1, which superseded the original November 4 deadline. Mandatory pre-bid walk-throughs on October 27 and November 10, 2026 have passed. Bids are submitted electronically through SIGMA VSS, with a maximum of two attachments, each under 25 megabytes.

Opportunity text

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd