472/23129. KMM; Woodland C.F. - Site Mechanical Underground
Open State & local contract opportunity Posted
- Solicitation number
- RFQ 171 270000000015 4
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 95121600 Transport buildings and structures
- 72121007 Truck and automobile assembly plant constructionand remodeling service
- 72121002 Food product manufacturing or packing plant construction and remodeling service
- 72121008 Warehouse construction and remodeling service
- 95122400 Industrial buildings and structures
- 72121005 Pharmaceutical manufacturing plant construction and remodeling service
- 95122401 Workshop
- 72121501 Chemical plant construction service
- 72121004 Paper or pulp mill construction and remodeling service
- 95122402 Cold storage installation
Show all 19
- 72121000 New industrial building and warehouse construction services
- 72121500 Industrial plant construction services
- 72121001 Dry cleaning plant construction and remodeling service
- 72121003 Grain elevator construction and remodeling service
- 72121401 Bank building construction service
- 72121502 Mine loading and discharging station construction service
- 72121507 Tank construction and servicing
- 72121508 Preparation plant construction service
- 95122403 Warehouse store
Updated .
About this opportunity
The Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division, is soliciting sealed bids for site mechanical underground construction at Woodland Correctional Facility in Whitmore Lake, Michigan, with bids due November 18, 2026 at 2:00 p.m. ET. A 10% pricing preference applies to qualified service-disabled veteran-owned businesses (SDVOBs) under the state's SDVOB program. Bidders must indicate SDVOB status in the bid and submit proof of service, discharge, service-connected disability, and business ownership, or National Veterans Business Development Council (NVBDC) certification. Michigan does not pre-certify SDVOBs and does not accept CVE or VetCert verification.
The work is coordinated with the Michigan Department of Corrections and includes new sanitary sewer mains, a sanitary lift station, cured-in-place-pipe sanitary sewer lining, water main improvements, excavation, pavement and site restoration, testing, startup, and commissioning. Sanitary sewer piping must be new PVC SDR 26. The contract duration is 200 calendar days from Notice to Proceed. Shutdowns follow Appendix I utility and security standards, which require hour-by-hour scheduling and backup generator provisions when electrical shutdowns exceed two hours. Boiler and heating work must occur between May and October. Security-related shutdowns require coordination with MDOC leadership and facility custody staff. Bidders must provide proof of State Project Registration from the Department of Labor and Economic Opportunity.
The base bid carries a $75,000 hydrovac allowance, a $150,000 provisional allowance, and a $200,000 material allowance, plus asphalt pavement replacement of 0 to 500 square yards and concrete pavement replacement of 0 to 2,000 square feet. Each bid requires 5% bid security of the Base Bid, delivered as a certified or cashier's check, money order, or Bid Bond. Performance and Payment Bonds are mandatory for bids exceeding $50,000. The contractor provides Builders Risk Insurance. Bids must include sales and use taxes, permits, and fees, and remain valid for 90 calendar days after opening. Prevailing wage and soil erosion requirements apply, and the contract documents incorporate MICHSPEC 2008 forms. The contract goes to the lowest responsive, responsible bidder. The state reserves the right to reject any or all bids, waive irregularities, and rebid without re-advertising.
Addendum No. 1 moved the bid opening from November 11 to November 18, 2026 and added the material allowance and PVC requirement. Addendum No. 3, issued November 12, 2026, adds Electrical Improvement Plan sheets E1 and E2 and sheets C18 and C21, and renumbers C16 as C31. Bidders must acknowledge all addenda in the bid summary and bid form or face rejection.
The mandatory pre-bid conference and facility tour was scheduled for October 22, 2026 at 9:00 a.m. ET, and questions were due November 4, 2026. Vendor/Contractor LEIN Requests were required five business days before the tour for facility access. Bids must be uploaded through SIGMA VSS in no more than two attachments, each under 25 MB. Steve Sutton, P.E., of Nowak & Fraus Engineers, the engineer of record, is the principal contact, with Kurt Maiberger, P.E., as project approver.
Opportunity text
472/23129.KMM; Woodland C.F. - Site Mechanical Underground
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity