380 Berry Street Abestos Abatement

Closed State & local contract opportunity Posted

Solicitation number
2026-08-19
State
New Jersey
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Township of Woodbridge, New Jersey is requesting sealed bids for asbestos abatement and disposal services at 380 Berry Street (former Credit Union Building) with bids due September 9, 2026 at 10:30 a.m. The bidder must hold a current DLWD (Department of Labor and Workforce Development) license for asbestos abatement — the primary eligibility filter.

The scope encompasses removal of multiple asbestos-containing materials across basement locations totaling approximately 5,800 square feet of floor tile and associated linear footage of pipe insulation. Materials to be removed include 9×9 red and tan floor tiles with mastic (7% and 4% chrysotile respectively), corrugated and compressed paper pipe insulation (40% and 20% chrysotile), associated fittings (45% and 20% chrysotile), breeching insulation (30% chrysotile), textured plaster ceiling (10% chrysotile), residual mastic (1.1% chrysotile), and fire door material. Work must comply with New Jersey Administrative Codes 5:23, 8:60, and 12:120; OSHA 29 CFR Part 1926.1101; and EPA 40 CFR Part 61 Subpart M. The contractor must comply with New Jersey prevailing wage requirements and provide certified payroll records within ten days of wage payment.

This is a firm fixed-price contract with a two-year effective period contingent on fund availability. Bid prices must be net and firm with no price escalation permitted. The Township is exempt from sales and use taxes. A bid bond, certified check, or cashier's check in the amount of ten percent of the total bid price (not to exceed $20,000) is required, along with a 100 percent performance bond, labor and material payment bond, and one-year maintenance bond. General liability insurance of $3 million per occurrence and automobile liability of $3 million per occurrence are required with the Township named as additional insured. Proof of New Jersey business registration must be provided prior to award. Bids are submitted electronically, by mail, or in person at the Township of Woodbridge Municipal Building, One Main Street. Written interpretation requests are due at least seven business days prior to bid opening. Bid packages are available through BidNet Direct at www.bidnetdirect.com/new-jersey/twpwoodbridge.

Opportunity text

SCOPE OF WORK A. The DWLD licensed Asbestos Abatement Contractor shall remove asbestos containing materials identified in the Table 1 below. Table 1 Summary of Identified Asbestos Containing Materials Former Credit Union Building 380 Berry Street Woodbridge, New Jersey Material Asbestos Content 9 x 9 Red Floor Tile and Mastic 7% Chrysotile/2.5% Chrysotile 9 x 9 Tan Floor Tile and Mastic 4% Chrysotile/3% Chrysotile Corrugated Paper Pipe Insulation 40% Chrysotile Fittings Associated with Corrugated Paper Pipe Insulation 45% Chrysotile 9 x 9 Brown Vinyl Floor Tile and Black Mastic 6% Chrysotile/5% Chrysotile Breeching Insulation 30% Chrysotile Textured Plaster Ceiling (Texture) 10% Chrysotile Compressed Paper Pipe Insulation 20% Chrysotile Table 1 Summary of Identified Asbestos Containing Materials Former Credit Union Building 380 Berry Street Woodbridge, New Jersey Material Asbestos Content Fittings Associated with Compressed Paper Pipe Insulation 20% Chrysotile Residual Mastic 1.1% Chrysotile Fire Door Assumed B. Table 2 - Asbestos Abatement Scope of Work Summary Former Credit Union Building 380 Berry Street Woodbridge, New Jersey 07095 Floor Material Location Approximate Quantity Removal Method Basement 9 x 9 Red Floor Tile and Mastic (ID#: 01/01-A) South Stairwell (0002) 75 SF Non-Friable Floor Tile and Mastic Removal Large Storage Area (0001) 1,264 SF Elevator Machine Room (0004) 56 SF Small Storage Room (0005) 128 SF Inner Storage Room (0006) 96 SF Night Drop Vault Room (0007) 72 SF Sever Room (0008) 135 SF Old Telecomm Room (0009) 50 SF Hall (0010) 450 SF North Stairwell (0011) 70 SF Vault/Storage (0014) 80 SF 9 x 9 Tan Floor Tile and Mastic (ID#: 02/02-A) South Stairwell (0002) 75 SF Non-Friable Floor Tile and Mastic Removal Large Storage Area (0001) 1,264 SF Elevator Machine Room (0004) 56 SF Small Storage Room (0005) 128 SF Inner Storage Room (0006) 96 SF Night Drop Vault Room (0007) 72 SF Sever Room (0008) 135 SF Old Telecomm Room (0009) 50 SF Hall (0010) 450 SF North Stairwell (0011) 70 SF Vault/Storage (0014) 80 SF Corrugated Paper Pipe Insulation (ID#: 05) Throughout 1,486 LF Wrap & Cut Removal Fitting Insulation associated with Corrugated Paper Pipe Insulation (ID#: 06) Throughout 238 LF Wrap & Cut Removal Table 2 - Asbestos Abatement Scope of Work Summary Former Credit Union Building 380 Berry Street Woodbridge, New Jersey 07095 Floor Material Location Approximate Quantity Removal Method Breeching Insulation (ID#: 016) Mechanical Room 80 SF Wrap & Cut Removal Compressed Paper Pipe Insulation (ID#: 33) Throughout 1,386 LF Wrap & Cut Removal Fitting Insulation associated with Compressed Paper Insulation (ID#: 35) Throughout 238 LF Wrap & Cut Removal First Floor Corrugated Paper Pipe Insulation (ID#: 05) Throughout 308 LF Full Containment in accordance with N.J.A.C. 5:23-8 (Unoccupied) Fitting Insulation associated with Corrugated Paper Pipe Insulation (ID#: 06) Throughout 72 LF Full Containment in accordance with N.J.A.C. 5:23-8 (Unoccupied) 9 x 9 Brown Floor Tile and Mastic (ID#: 13/13-A) Closet (1002A) 4 SF Full Containment in accordance with N.J.A.C. 5:23-8 (Unoccupied) Office 6 (1009) 130 SF Office 13 (1017) 90 SF Office 14 (1018) 108 SF Server Room (1019) 256 SF Office (1022) 45 SF Closet (1023) 16 SF Hall (1024) 400 SF Closet (1026) 24 SF Textured Ceiling Plaster (Texture) (ID#: 30) Throughout 3,656 SF Full Containment in accordance with N.J.A.C. 5:23-8 (Unoccupied) Compressed Paper Pipe Insulation (ID#: 33) Throughout 408 LF Full Containment in accordance with N.J.A.C. 5:23-8 (Unoccupied) Table 2 - Asbestos Abatement Scope of Work Summary Former Credit Union Building 380 Berry Street Woodbridge, New Jersey 07095 Floor Material Location Approximate Quantity Removal Method Fitting Insulation associated with Compressed Paper Insulation (ID#: 35) Throughout 72 LF Full Containment in accordance with N.J.A.C. 5:23-8 (Unoccupied) Second Floor Corrugated Paper Pipe Insulation (ID#: 05) Throughout 55 LF Wrap & Cut Removal Fitting Insulation associated with Corrugated Paper Pipe Insulation (ID#: 06) Throughout 10 LF Wrap & Cut Removal 9 x 9 Brown Floor Tile and Mastic (ID#: 13/13-A) Storage Room (2011-B) 210 SF Non-Friable Floor Tile and Mastic Removal Custodians Closet (2014) 16 SF Office (2017) 396 SF South Stairwell Second Floor Landing (0002) 100 SF North Stairwell Second Floor Landing (0011) 100 SF Compressed Paper Pipe Insulation (ID#: 33) Throughout 55 LF Wrap & Cut Removal Fitting Insulation associated with Compressed Paper Insulation (ID#: 35) Throughout 10 LF Wrap & Cut Removal Residual Mastic (ID#: 40) Throughout 4,773 SF Non-Friable Mastic Removal N/A Fire Door (ID#: 53) Throughout 10 Doors Intact Removal C. Removal of existing furniture and or debris to facilitate abatement activities shall be the responsibility of the Contractor. D. At minimum, all interior work in the above scope of work shall be performed inside negative pressure enclosures as described in Part 3 - Asbestos Abatement Requirements 3.3 of these Specifications. E. The quantities shown are for informational purposes only. The Contractor shall inspect and verify all locations, quantities and measurements indicated in Contract Documents prior to bidding. No additional compensation shall be awarded for failure to complete said review or inspection. F. Listed quantities include asbestos containing materials assumed to be present within walls and above hard ceilings. The Contractor shall be responsible for all demolition necessary to locate and abate the asbestos containing materials. G. Note: Asbestos containing floor tile and mastic were observed under walls in the basement of the building. Where present, the Contractor shall perform demolition necessary to access and abate the asbestos containing tile and mastic. H. Note: In several areas the Textured Ceiling Plaster (Texture) material is located above a layin ceiling tile grid. The Contractor shall be responsible for demolition and disposal of the layin ceiling tiles and associated metal grid work. I. Contractor shall be responsible for removal of existing windows and installation of 2 x 4 framed plywood sheathed manifolds where necessary to facilitate exhaust to the exterior of the building.

Files

File Type Posted
woodbridge COMPLETE BID PACKAGE.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors