Detroit Public Schools Community District is soliciting proposals under RFP 27-0052 for roof replacement at Cass Technical High School, Ralph W. Emerson Elementary/Middle School, Priest Elementary-Middle School, and Clippert Multicultural Magnet Honors Academy, with proposals due November 20, 2026 at 12:00 p.m. The solicitation identifies no set-aside, and the project manuals encourage participation by qualified diverse subcontractors and suppliers. Addendum 2 moved the proposal due date from November 13 to November 20, 2026, and Addendum 3 set the public opening for the same date and time, conducted virtually.

Scope covers replacement of identified roof areas at each building. Cass Tech's project manual describes about 103,914 square feet across Areas A through U, including photovoltaic array removal and reinstallation. Work includes removal of existing membranes and insulation to the structural deck, deck and wood blocking repair, tapered polyisocyanurate insulation, a 1/2-inch cover board, a fully adhered 60-mil EPDM membrane, and sheet metal flashing and sealants. A 20-year "Total System Warranty" is offered as an alternate price. Membrane manufacturers are limited to Carlisle, Johns Manville, and Elevate (Firestone). Substitutions require documentation of comparable or superior performance, warranty and manufacturer support, cost justification, and proof of certified installer status. Bidders must assume existing roofing contains asbestos unless owner testing or documentation shows otherwise. Michigan Public Act 10 of 2023 prevailing wage applies, with certified payroll required.

Pricing is an all-inclusive lump-sum fixed fee for each building, supplemented by unit prices. Bidders must post 5% bid security and, if selected, furnish performance and payment bonds equal to 100% of the bid amount. The base bid includes a $20,000 owner-controlled allowance and a $160,000 owner-controlled AHJ permitting allowance per building. Cass Tech carries a $50,000 owner-controlled allowance for solar system removal and reinstallation. Retainage is the greater of 10% or $5,000. Liquidated damages are $1,000 per working day for delays beyond the completion date. Work must finish between June 1 and August 13, 2027, and must start within 30 days of award. The district may award each building to a separate contractor or to one or multiple vendors.

Addendum 1 set staggered mandatory walkthroughs at all four schools for October 30, 2026, and the question deadline of November 3, 2026 at 12:00 p.m. has passed. The virtual public opening can be joined at the link https://tinyurl.com/2rk6rnb3 or by calling (313) 462-2305, Conference ID 388 970 486#.