26-17 Ben850929B (Benton)

Open State & local contract opportunity Posted

Solicitation number
26-17 Ben850929B (Benton)
State
Iowa
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from bidopportunities.iowa.gov. Updated .

About this opportunity

Benton, Iowa is soliciting bids for construction of a Breakpoint nutrient reduction wetland under solicitation 26-17 Ben850929B, with bids due December 10, 2026. The source names no set-aside, preference, or local-vendor requirement, and it identifies no pre-bid meeting or question deadline.

The work includes selective clearing, excavation, grading, steel sheetpile and tile installation, a CMP water control structure with inlet riser, a stoplog storage structure, riprap with concrete grout, TURF reinforcement mat Type 5B, and seeding. Principal quantities are 18,151 cubic yards of earthwork, 1,150 square feet of steel sheetpile, 1,268 linear feet of pipe, 668 tons of riprap, 72 cubic yards of concrete grout, 430 square yards of TURF mat, 515 linear feet of silt fence, and 5 acres of seeding. Plan Set.pdf (9MB) and Standards and Specifications.pdf (6MB) are attached, both posted November 10, 2026, and define the technical requirements bidders must follow.

The estimated construction cost range is $250,000 to $350,000. Construction must be completed by November 1, 2027, and seeding by December 15, 2027, within the seeding windows stipulated in Specifications IA CS-006.

Opportunity text

Completion Dates: Construction: November 1st, 2027 Seeding: December 15, 2027 (Must follow the seeding windows stipulated in Specifications IA CS-006.) This project is for a Breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, CMP water control structure, stoplog storage structure, riprap with concrete grout, TURF reinforcement mat Tyope 5B, s and seeding. This project includes 18,151 cubic yards of earthwork, 1,150 square feet of steel sheetpile, 1,268 linear feet of pipe installation, 668 tons of riprap, 35 tons of 2" clean stone, CMP water control structure, CMP inlet riser, 72 cubic yards of concrete grout, 430 square yards of TURF mat Type 5B, 515 LF of silt fence and 5 acres of seeding. The estimated construction cost range for this project is $250,000 to $350,000.

Files

File Type Posted
Plan Set.pdf PDF
Standards and Specifications.pdf PDF
Shive-Hattery Inspection Report.pdf PDF
Schedule of Prices.pdf PDF
Proposal-Acknowledgement-Affidavit.pdf PDF
Bid Bond.pdf PDF