26-15 Winn971022B (Winneshiek)

Open State & local contract opportunity Posted

Solicitation number
26-15 Winn971022B (Winneshiek)
State
Iowa
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from bidopportunities.iowa.gov. Updated .

About this opportunity

The Iowa Department of Natural Resources is soliciting bids for Project 26-15 Winn971022B, a conventional nutrient reduction wetland in Winneshiek County, Iowa, with bids due December 10, 2026. Compliance with Iowa construction standards and the referenced IA CS-006 seeding specifications is mandatory for all project phases, including buffer and structural seeding.

Work includes selective clearing, drain tile investigation and removal, excavation, and grading. It also covers installation of high density polyethylene (HDPE) pipe with CMP tile outlets, steel sheet pile installation, and a CMP water control structure. Remaining scope includes riprap and grout, seeding, and fence installation. The project includes around 35,150 cubic yards of earthwork, 8,385 linear feet of drain tile investigation and removal, 16,230 linear feet of HDPE corrugated profile wall pipe, 2,344 square feet of steel sheet pile, 188 cubic yards of concrete grout, 1,475 tons of riprap, 18.4 acres of seeding, and 4,780 linear feet of fence.

The estimated construction cost range is $900,000 to $1,100,000. Construction must be completed by October 31, 2027, and seeding by December 31, 2027, following the seeding periods in IA CS-006.

Opportunity text

Completion Dates: Construction: October 31, 2027 Seeding: December 31, 2027 for Buffer Seeding (follow the seeding periods in IA CS-006) December 31, 2027 for Structural Seeding (follow the seeding periods in IA CS-006) This project is for a conventional nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, drain tile investigation and removal, excavation, grading, installation of high density polyethyelene (HDPE) pipe with CMP tile outlets, steel sheet pile installation, CMP water control structure, riprap and grout, seeding, and fence installation. This project includes around 35,150 cubic yards of earthwork, 8,385 linear feet (LF) of drain tile investigaiton and removal, 16,230 LF of HDPE corrugated profile wall pipe installation, 2,344 SF of steel sheet pile installation, a corrugated metal water control structure, 188 CY concrete grout, 1475 tons of riprap, 18.4 acres of seeding and 4,780 LF of fence installation. The estimated construction cost range for this project is between $900,000 and $1,100,000.

Files

File Type Posted
Plan Set.pdf PDF
Bid Book General Requirements Only.pdf PDF
Geotechnical report.pdf PDF
Schedule of Prices -.pdf PDF
Bid Book with plans and specs.pdf PDF
Inspection Plan.pdf PDF
Standards and Specifications.pdf PDF
Bid Bond.pdf PDF
Proposal - Acknowledgement - Affidavit.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors