26-14 Sto822305D (Story)

Open State & local contract opportunity Posted

Solicitation number
26-14 Sto822305D (Story)
State
Iowa
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from bidopportunities.iowa.gov. Updated .

About this opportunity

The Iowa Department of Agriculture (IDALS) is soliciting bids for construction of the Buland Wetland Site, a treatment wetland in Story County that will treat water from an existing ditch using a solar-powered pump, under Opportunity 26-14 Sto822305D, with bids due December 10, 2026. The source names no set-aside, preference program, or sole-source intent. Bolton & Menk, Inc. prepared the standards and specifications.

Scope includes selective clearing, excavation and grading, tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. Quantities are approximately 36,170 cubic yards of earthwork, 1,469 linear feet of pipe, 43 tons of riprap, a Modified SW-513 concrete outlet structure, an SW-402 pump basin, a solar pump system, and 11.5 acres of seeding. Work must conform to Natural Resources Conservation Service standards and Iowa Construction Specifications. The specifications define 21 bid items plus subsidiary items, with lump-sum pricing for items such as site stripping, mobilization and demobilization, and structure and channel seeding, and unit pricing for items such as crop damage, buffer seeding, topsoil work, and pipe and concrete installations. Unit-priced quantities are measured from engineer-approved quantities or weight tickets, and the engineer must approve work before payment.

The estimated construction cost range is $240,000 to $360,000. Construction must be complete by September 1, 2027, and seeding by December 15, 2027, following the seeding dates stipulated in the specifications.

Opportunity text

In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 36,170 total cubic yards of earthwork, 1,469 linear feet of pipe installation, 43 tons of riprap, installation of a Modified SW-513 concrete outlet structure, SW-402 pump basin, solar pump system and 11.5 acres of seeding. The estimated construction cost range for this project is $240,000 to $360,000. Completion Dates: Construction September 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications)

Files

File Type Posted
Plans.pdf PDF
Standards and Specifications.pdf PDF
Bid Book with plans and specs.pdf PDF
Schedule of Prices.pdf PDF
Bid Book - General Requirements only.pdf PDF
Bid Bond.pdf PDF
Notice to Bidders.pdf PDF
Proposal - Acknowledgement - Affidavit.pdf PDF