25-022 750 Mount Paran Road Stormwater Improvement Project
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66098-NONST-2025-000000068
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 30111510 Pipeline protection concrete mattress
- 81101513 Building construction management
- 40175401 Pipe stoppers
- 78101718 Offshore supply vessel service
- 40175400 Pipe support
- 20121459 Wireline entry guide
- 20123206 Swellable packer
- 20143305 Pig signalers
- 40175402 Pipeline launch/receive traps
- 40175403 Quick opening closures
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Sandy Springs, Georgia is seeking bids for the 25-022 750 Mount Paran Road Stormwater Improvement Project, a procurement opportunity located in Fulton County. This Invitation to Bid (ITB) solicits contractors to install two stormwater planter Best Management Practices (BMPs) along Mount Paran Drive, involving the removal of approximately 90 linear feet of curb and gutter and constructing stormwater planters with PVC underdrains connected to city-owned catch basins. The stormwater planters will be filled with a specific soil mixture to facilitate water infiltration, with work to be performed in accordance with Georgia Department of Transportation Standard Specifications. The bid is due on December 16, 2024 at 2:00 PM EST via Zoom, with a non-mandatory pre-bid conference scheduled for November 26, 2024 at 11:00 AM Eastern Time at the project site. The contract requires successful completion within 60 calendar days from the Notice to Proceed, and bidders must submit comprehensive documentation as outlined in the ITB.
The procurement appears to be open to all qualified contractors without specific set-aside designations for disadvantaged enterprises. The total contract amount will be determined by unit prices submitted in the Bid Schedule, with a 10% contingency included. While specific budget ranges are not explicitly stated, the project involves infrastructure improvement and stormwater management work. The City reserves the right to reject all bids, indicating a competitive selection process. Payment terms and liquidated damages are outlined in the contract documents, suggesting a structured procurement approach. Potential bidders should carefully review the ITB documentation, which provides detailed bidding instructions and required submission materials. The project represents a targeted municipal infrastructure enhancement focusing on stormwater management and environmental best practices.
Opportunity text
This project involves the installation of two stormwater planter Best Management Practices (BMP¿s) along the right-of-way of Mount Paran Drive in the City of Sandy Springs, Ga. The project involves removing approximately 90 Linear Feet (LF) of curb and gutter and construction two stormwater planters. The planters will have a PVC underdrain that is connected to City owned catch basins. The stormwater planters will be filled with a soil mixture as species on the plans to facilitate water infiltration.
Files
| File | Type | Posted |
|---|---|---|
| 25_022 230 750 Mount Paran Stormwater Improve.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity