24ARPA12 - Public Safety Center 3rd Floor Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- S-KR1079-00017955
- State
- Oregon
- Responses due
Opportunity facts
- NIGP codes
- 54091 Structural Wood Products (Not Otherwise Classified): Beams, Framing Lumber, Planks, Joists, Etc.
- 90638 General Construction - Architectural
- 90658 Lighting (Interior, Exterior) - Architectural Services
- 93633 Fire Protection Equipment And Systems Including Fire Hydrants, Fire Sprinkler Systems, Smoke Detectors, Jaws Of Life, Fire Protection Material Treatment, Firestop And Fire Barriers, Etc.inspection, Maintenance And Repair
- UNSPSC codes
- 11122000 Engineered wood products
- 30103601 Wood beams
- 30103610 Crib block
- 72101509 Fire protection system and equipment maintenance or repair service
- 73151702 Fire protection material treatment services
- 30103616 Composite framework
- 72151103 Irrigation sprinkler system installation service
- 30266300 Wood structural materials
- 30103605 Wood planks
- 46171647 Flammable vapour detector
Show all 19
- 72101516 Fire extinguisher inspection maintenance and repair service
- 11122008 Cross laminated timber
- 30103602 Wood composite beams
- 30103603 Framing lumber
- 30103607 Wood joists
- 30103609 Brattice board
- 30103617 Wooden framework
- 30103625 Topside Module
- 72151102 Fire sprinkler system installation service
- Points of contact
-
- Amy Nytes anytes@roseburgor.gov (541) 492-6866
- Amy Nytes bids@roseburgor.gov (541) 492-6866
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The City of Roseburg, Oregon is requesting bids for interior improvements to the third floor of the Public Safety Center located at 700 S.E. Douglas Avenue, with proposals due September 30, 2026 under solicitation 24ARPA12.
The scope comprises three improvement areas totaling approximately 2,240 square feet: Improvement Area A (office tenant improvement, 1,785 sf); Improvement Area B (two single-occupant showers and storage room, 300 sf); and Improvement Area C (new reception window, 155 sf). Work includes wall framing, roofing repairs, interior doors and frames, gypsum board finishes, flooring, ceiling, tile, painting, toilet accessories, plumbing, HVAC, lighting, power, fire alarm modifications, and fire sprinkler modifications. The project is funded through ARPA (American Rescue Plan Act) mechanisms.
All contract employees must complete CJIS (Criminal Justice Information Services) fingerprinting, background checks, and security training before beginning on-site work. The contractor is responsible for project coordination, scheduling, compliance with Oregon building codes and accessibility standards, dust control, and temporary barriers separating construction from adjacent occupied police operations. Construction access is restricted to hallway 352. The contractor assumes responsibility for trade permits; the City retains responsibility for building permits and associated fees. Owner-furnished, owner-installed items include furniture and building intrusion security systems.
Deliverables include final punch lists, record drawings, operations and maintenance manuals in both digital PDF and three-ring binder formats organized by specification section, and warranty documentation. The contractor must conduct final cleaning with demonstration and instruction of Owner personnel on all systems and equipment.
Consultants include architect Curt Wilson (Wilson Architecture), mechanical engineer Steve Schual, plumbing engineer Steven Savich (both Systems West Engineers), and electrical engineer Jim Krumsick (Paradigm Engineering). The Project Manual, drawing set (25 MB), and specification documents are available to prospective bidders.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity