24-027 1025-1075 Crest Valley Drive Drainage Maintenance and Improvement Project

Awarded State & local contract opportunity Posted

Solicitation number
PE-66098-NONST-2024-000000012
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 33

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The state and local contracting opportunity is for the 1025-1075 Crest Valley Drive Drainage Maintenance and Improvement Project, located in Fulton County, Georgia. The project involves the rehabilitation of an existing 84-inch diameter culvert, replacement of a brick headwall with a reinforced concrete headwall, and replacement of an 18-inch corrugated metal pipe with an 18-inch reinforced concrete pipe. The procurement is an Invitation to Bid (ITB) issued by the City of Sandy Springs, with bids due on November 13, 2023, by 2:00 PM EST. A non-mandatory submittal conference will be held on October 24, 2023, at 3:00 PM EST, and questions are due by October 31, 2023, at 5:00 PM. The contract term is 120 calendar days from the Notice to Proceed. The project will be funded through the City's stormwater management budget, with an estimated annual value of $150,000.

The ITB does not mention any set-aside designations or restrictions on the types of organizations that can respond. It also does not list any incumbent vendors or current contractors. The Bid Tabulation included in the materials shows bids from two vendors - Site Engineering with a total bid of $551,320.00 and Vertical Earth with a total bid of $386,401.69. Contractors must be registered in the State of Georgia and comply with the Georgia Security and Immigration Compliance Act.

Opportunity text

The existing storm sewer at 1025-1075 Crest Valley Drive is composed of an 84" diameter culvert, a brick headwall, and an 18" corrugated metal storm sewer pipe that daylights at brick headwall. The 84" corrugated metal pipe culvert has extensive invert corrosion and some separation at the connection rings. The brick headwall is cracked, undermined, and settled. The 18" CMP is deteriorated due to extensive corrosion. This project aims to resolve the deterioration and settlement problems by rehabilitation of the pipe culvert, replacing the brick headwall with a reinforced cast in place concrete headwall, and replacing the 18" CMP with an 18" reinforced concrete pipe.