This document is a Request for Proposals (RFP) issued by the Town of Crest Valley for 1025-1075 Crest Valley Drive Drainage Maintenance. The RFP seeks proposals from qualified contractors to perform drainage maintenance services within the specified project area, including cleaning, repairing, and maintaining drainage ditches, culverts, and associated infrastructure. The work is to be performed on an annual, as-needed basis for a period of three years, with two additional one-year renewal options. Proposals are due by 2:00 PM on November 15, 2021, and a mandatory pre-proposal site visit is scheduled for November 1, 2021.
The RFP outlines pricing requirements, with contractors to provide unit prices for various maintenance activities. There are no set-asides or incumbent contractors identified. Funding for the project will be provided through the Town's stormwater management budget, with an estimated annual value of $150,000. Contractors must demonstrate experience with similar drainage maintenance projects and provide references, insurance, and other documentation as part of their proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_027 1025_1075 Crest Valley Drive Drainage .pdf | ||
| Addendum 1.pdf | ||
| Bid Tabulation 24_027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JB
CREST VALLEY DRIVE
DAVID CORTS, SR.
DAVID CORTS, JR.
PROPOSED RIP RAP
PROPOSED 84" REINFORCED
CONCRETE HEADWALL
22 LF OF 18" DETERIORATED CMP
TO BE REPLACED WITH 18" RCP
P
R
O
P
R
C
P
THE ENTIRE LENGTH OF THE 84"
CULVERT WILL BE REHABILITATED
PERMANENT
DRAINAGE
EASEMENT
MODIFY 4' INSIDE DIA. JB FOR
NEW 18" RCP PENETRATION
PROPOSED 22 LF
OF 18" RCP
S
T
A
T
E
S
T
R
E
A
M
B
U
F
F
E
R
S
T
R
E
A
M
N
T
U
R
L
B
O
U
N
D
A
R
Y
S
T
R
E
T
U
R
U
N
D
A
R
Y
S
T
A
T
E
S
T
R
E
A
M
B
U
F
F
E
R
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
1025-1075 CREST VALLEY DRIVE
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
PROJECT OVERVIEW
NEELU INC.
Consulting Engineers
Drawing
No.
Description
COVER SHEET
EXISTING CONDITIONS & DEMO PLAN
PROPOSED IMPROVEMENTS PLAN
LIST OF DRAWINGS
GENERAL NOTES
SEDIMENT & EROSION CONTROL DETAILS
12 SEDIMENT & EROSION CONTROL PLAN 1
TRAFFIC CONTROL PLAN
18" STORM SEWER PIPE PROFILE
HEADWALL DETAILS AND BAR SCHEDULE
SEDIMENT & EROSION CONTROL NOTES AND TREE
SEDIMENT & EROSION CONTROL DETAILS
CULVERT REHABILITATION
HEADWALL DESIGN FORMWORK & REINFORCEMENT
THE CITY OF SANDY SPRINGS
DEPARTMENT OF PUBLIC WORKS
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
1 OF18
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
Project Location:1025-1075 Crest Valley Drive
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
LOCATION MAP
N
COVER SHEET
THE PROJECT SITE IS LOCATED NEAR THE ROAD RIGHT OF WAY
AT 1025-1075 CREST VALLEY DRIVE
SCOPE OF WORK:
THE STORM SEWER AT 1025-1075 CREST VALLEY DRIVE IS COMPOSED OF AN 84" DIAMETER CULVERT, AN 84"
BRICK HEADWALL, AND AN 18" CORRUGATED METAL STORM SEWER PIPE THAT DAYLIGHTS AT THE BRICK
HEADWALL.
THE 84" CORRUGATED METAL PIPE CULVERT HAS EXTENSIVE INVERT CORROSION AND DETERIORATED
CONNECTION RINGS. THE BRICK HEADWALL IS CRACKED, UNDERMINED AND SETTLED. THE 18" CMP IS
DETERIORATED DUE TO EXTENSIVE CORROSION.
THIS PROJECT AIMS TO RESOLVE THE DETERIORATION AND SETLEMENT PROBLEMS BY REHABILITATION OF THE
PIPE CULVERT, REPLACING THE BRICK HEADWALL WITH A REINFORCED CAST IN PLACE CONCRETE HEADWALL, AND REPLACING THE 18" CMP WITH AN 18" REINFORCED CONCRETE PIPE.
PROPERT ADDRESS PROPERTY OWNER
1 1025 CREST VALLEY DR NW KURT D. SWENSSON AND FRANCES D. SWENSON, PID 17 0176 LL 0904
2 1075 CREST VALLEY DR NW DAVID CORTS, JR., AND DAVID CORTS, SR., PID 17 0176 LL 1027
HEADWALL DESIGN
STREAMBANK RIP RAP AND CURB AND GUTTER DETAILS
DRAINAGE EASEMENT PLATS
24-HOUR CONTACT EMERGENCY CONTACT:
DEPARTMENT OF PUBLIC WORKS: 770 730 5600
SEDIMENT & EROSION CONTROL PLAN 2
SEDIMENT & EROSION CONTROL PLAN 3
A K.A
JULY 05, 23
ISSUED FOR CONSTRUCTION
UTILITY COMPANIES:
ATLANTA GAS & LIGHT COMPANY
GEORGIA POWER ELECTRIC
TELECOM COMMUNICATIONS
CITY OF ATLANTA WATER
FULTON COUNTY SEWER
NO UTILITY CONFLICT ANTICIPATED.
CONTRACTOR MUST MARK ALL UTILITIES AND VERIFY NO CONFLICT.
1025 CREST VALLEY DR NW
PROTECTION DETAIL
CITY OF SANDY SPRINGS PUBLIC WORKS PROJECT
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
08/16/2023
LDP23-00052
GENERAL NOTES
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description THE CITY OF SANDY SPRINGS
DEPARTMENT OF PUBLIC WORKS
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
2 OF18
Project Location:1025-1075 Crest Valley Drive
GENERAL NOTES
1. PROJECT SPECIFICATIONS: ALL WORK TO BE DONE IN ACCORDANCE WITH THE GEORGIA
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR THE
CONSTRUCTION OF TRANSPORTATION SYSTEMS, CURRENT EDITION, AND
SUPPLEMENTS THERETO, AS APPROVED BY THE FEDERAL HIGHWAY ADMINISTRATION.
2. UTILITY LOCATIONS: ALL KNOWN UTILITY FACILITIES ARE SHOWN SCHEMATICALLY ON,
PLANS AND ARE NOT NECESSARILY ACCURATE IN LOCATION AS TO PLAN OR ELEVATION.
UTILITY FACILITIES SUCH AS SERVICE LINES OR UNKNOWN FACILITIES NOT SHOWN ON
PLANS WILL NOT RELIEVE THE CONTRACTOR OF HIS OR HER RESPONSIBILITY UNDER
THIS REQUIREMENT. "EXISTING UTILITY FACILITIES” MEANS ANY UTILITY THAT EXISTS
ON THE PROJECT IN ITS ORIGINAL, RELOCATED, OR NEWLY INSTALLED POSITION. ALL
UTILITY FACILITIES WHICH ARE IN CONFLICT WITH CONSTRUCTION AND ARE NOT
COVERED AS SPECIFIC ITEMS IN THE DETAILED ESTIMATE ARE TO BE REMOVED OR
RELOCATED TO CLEAR CONSTRUCTION IN ADVANCE OF THE WORK. DISRUPTION TO
SERVICES OUTSIDE THE HOURS OF 9:00 AM AND 4:00 PM REQUIRE PRIOR APPROVAL BY
THE CITY OF SANDY SPRINGS.
3. UTILITY WORK: UTILITY WORK COORDINATION WILL BE REQUIRED AS PART OF THIS
CONTRACT. THE CONTRACTOR WILL BE REQUIRED TO USE THE ONE-CALL CENTER
TELEPHONE NUMBER, 811, FOR THE PURPOSE OF COORDINATING THE MARKING OF
UNDERGROUND UTILITIES. THE CONTRACTOR'S ATTENTION IS CALLED TO SUBSECTION
105.06 OF THE GDOT STANDARD SPECIFICATIONS "COOPERATION WITH UTILITIES."
4. UTILITY COMPANIES: THE FOLLOWING UTILITIES HAVE FACILITIES IN THE PROJECT AREA:
ATLANTA GAS & LIGHT CO. ZAYO FILBER SOLUTIONS TELECOM
10 PEACHTREE PLACE 11TH FLOOR 470-249-5124
ATLANTA, GA 30309
404-805-2613 GEORGIA POWER ELECTRIC
EMRG: B00-427-5463 EXT 1 404-506-6539
DAMAGES: 888-891-0938 EXT 2
CITY OF ATLANTA WATER SUITE 6001
FULTON COUNTY SEWER ATLANTA, GA 30303
DEPARTMENT OF PUBLIC WORKS 404-612-4248
CITY OF ATLANTA DISPATCH
55 TRINITY AVENUE TELECOM COMMUNICATIONS
SUITE 1600 770-784-3972
ATLANTA, GA 30303 DAMAGES: 877-737-2478
404-602-4459
DAMAGES: 404-658-6500
5. CAUTION: CONTRACTOR TO TAKE EXTREME CAUTION EXCAVATING NEAR THE GAS
MAIN AND WATER MAIN AND THEIR SERVICE LINES.
6. QUANTITIES: THE TOTAL EARTHWORK QUANTITY SHOWN ON THE PLANS FOR CLEARING
AND GRUBBING IS FOR INFORMATION ONLY. THE CITY OF SANDY SPRINGS PUBLIC
WORKS DEPARTMENT ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY, THE
CONTRACTOR SHALL INCLUDE GRADING WORK AS PART OF THE BID PRICE FOR
GRADING COMPLETE AND IT SHALL BE HIS OR HER RESPONSIBILITY TO DETERMINE THE
ACTUAL EARTHWORK QUANTITY TO BE GRADED. NO CLAIMS WILL BE CONSIDERED FOR
EXTRA COMPENSATION IF THE CONTRACTOR RELIES ON THE QUANTITY SHOWN ON THE
PLANS. CLEARING AND GRUBBING ON THIS PROJECT IS LIMITED TO THE ACTUAL
CONSTRUCTION LIMITS UNLESS DIRECTED BY THE ENGINEER. COST FOR CLEARING AND
GRUBBING SHALL BE INCLUDED IN THE BID PRICE FOR GRADING COMPLETE.
7. GRADING COMPLETE: LUMP SUM SHALL INCLUDE ALL UNCLASSIFIED EXCAVATION,
BORROW EXCAVATION, CHANNEL EXCAVATION, BYPASS PUMPING, FOUNDATION
BACKFILL MATERIAL TYPE I, ROCK EXCAVATION, ASPHALT CUTS, CLEARING &
GRUBBING, TREE REMOVAL, DEBRIS/SOLID WASTE REMOVAL, AND REMOVAL OF ALL
ITEMS NOT SHOWN AS SEPARATE PAY ITEM. THIS SHALL ALSO INCLUDE ALL
COMPACTIVE EFFORTS NECESSARY TO ACHIEVE THE COMPACTION REQUIREMENTS
SPECIFIED IN THE PLANS.
8. DUST CONTROL: THE CONTRACTOR SHALL STRICTLY ADHERE TO DUST CONTROL
REGULATIONS. ALL AREAS SUBJECTED TO DUST FORMATION MUST BE PERIODICALLY
WATERED SUFFICIENT TO RETARD DUST. NO SEPARATE PAYMENT WILL BE MADE FOR
ANY COST INCURRED TO COMPLY WITH THIS REQUIREMENT.
9. PROJECT GRASSING AREA: ( SEE PLANS)
10. DISCREPANCY: IF THE CONTRACTOR, IN THE COURSE OF THE WORK, FINDS ANY
DISCREPANCIES BETWEEN THE PLANS AND THE PHYSICAL CONDITIONS OF THE
LOCALITY, ON ANY ERRORS OR OMISSIONS IN THE PLANS OR IN THE LAYOUT AS GIVEN
BY THE ENGINEER, IT SHALL BE HIS DUTY TO IMMEDIATELY INFORM THE ENGINEER, IN
WRITING, AND THE ENGINEER WILL PROMPTLY VERIFY THE SAME ANY WORK DONE
AFTER SUCH A SEPARATE PAYMENT SHALL BE MADE FOR ANY COST INCURRED TO
COMPLY WITH THIS REQUIREMENT.
11. INGRESS AND EGRESS: INGRESS AND EGRESS SHALL BE MAINTAINED AT ALL TIMES TO
ADJACENT PROPERTIES. REFER TO SUB-SECTION 107.07 OF THE GDOT STANDARD
SPECIFICATIONS
12. BORROW MATERIAL: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FURNISH
SUITABLE BORROW MATERIAL FOR THE PROJECT AND DISPOSE OF ANY UNSUITABLE OR
WASTE MATERIAL.
13. DRIVEWAYS: SHOULD A DRIVEWAY BE DAMAGED DUE TO CONSTRUCTION, THE
DRIVEWAY SHALL BE REPLACED, IN KIND, I.E. ASPHALT FOR ASPHALT, CONCRETE FOR
CONCRETE, AND BRICK PAVERS FOR BRICK PAVERS; EXCEPT EARTH AND GRAVEL
DRIVEWAYS SHALL BE REPLACED WITH ASPHALT TO THE CONSTRUCTION LIMITS.
DRIVEWAYS CONTAINING BRICK PAVERS SHALL BE CONSTRUCTED USING GDOT
SPECIFICATIONS. THE DRIVEWAY LOCATIONS INDICATED ON THE PLANS ARE FROM THE
BEST AVAILABLE DATA. THE CONTRACTOR SHALL CONSTRUCT NEW DRIVEWAYS TO
MATCH ACTUAL FIELD LOCATION OF EXISTING DRIVEWAYS WHERE THEY ARE NOT IN
CONFLICT WITH RULES AND REGULATIONS. THE CONTRACTOR SHALL OBTAIN THE
APPROVAL OF THE ENGINEER PRIOR TO MAKING ANY REVISIONS SUCH AS TO LOCATION,
WIDTH AND/OR NUMBER OF DRIVES TO BE CONSTRUCTED, WHERE REQUIRED, THE
DRIVES SHALL BE PAVED AS FOLLOWS:
ASPHALTIC DRIVES
RESIDENTIAL 1-1/2" RECY. ASPHALTIC CONCRETE, 9.5mm SUPERPAVE, GP 2 ONLY, INCL. BITUM. MAT'L & H. LIME, 6" GRADED AGGREGATE BASE
COMMERCIAL 1-1/2" RECY.ASPHALTIC CONCRETE, 9.5mm SUPERPAVE, GP 2 ONLY, INCL. BITUM. MAT'L & H. LIME, 2" RECY. ASPHALTIC CONC. 19mm SUPERPAVE, GP 1 OR 2
INCL. BITUM. MAT'L & H. LIME, 8" GRADED AGGREGATE BASE
CONCRETE DRIVES
RESIDENTIAL - 6" CONCRETE VALLEY GUTTER, and 6" CONCRETE DRIVEWAY COMMERCIAL - 8" CONCRETE VALLEY GUTTER, and 8" CONCRETE DRIVEWAY
ALL DRIVEWAYS SHALL BE PAVED TO THE LIMITS OF CONSTRUCTION. EXISTING
DRIVEWAYS SHALL NOT BE USED FOR PROJECT ACCESS.
14. WET SUBGRADE: WHERE WET SUBGRADE IS ENCOUNTERED AND IDENTIFIED BY THE
ENGINEER, UNDERDRAIN PIPE WITH DRAINAGE AGGREGATE SHALL BE PLACED AS
DIRECTED BY THE ENGINEER TO AID IN DEWATERING THE SUBGRADE.
15. PIPE INSTALLATION: THE CONTRACTOR SHALL OBSERVE ALL APPLICABLE LOCAL, STATE,
AND FEDERAL SAFETY REGULATIONS REGARDING PIPE INSTALLATION IN TRENCHES. NO
SEPARATE PAYMENT WILL BE MADE FOR ANY COST INCURRED TO COMPLY WITH THIS
REQUIREMENT.
16. STORM SEWER PIPES AND MANHOLES REMOVAL: THE EXISTING STORMWATER PIPE
SHALL BE REMOVED WHERE INDICATED ON THE COSTRUCTION DRAWINGS UNLESS
OTHERWISE DIRECTED BY THE ENGINEER. ALL COST FOR REMOVAL SHALL BE INCLUDED IN
THE BID PRICE FOR PIPE AND MANHOLE/CATCH BASIN REMOVAL AND REPLACEMENT.
17. PAVEMENT REMOVAL REPLACEMENT: AT LOCATIONS WHERE NEW PAVEMENT IS TO BE
PLACED ADJACENT TO EXISTING PAVEMENT WITHOUT AN OVERLAY OR WHERE CURBING
IS TO BE PLACED ACROSS A PAVED AREA, A JOINT SHALL BE SAWED ON A LINE
ESTABLISHED BY THE ENGINEER TO ENSURE PAVEMENT REMOVAL TO A NEAT LINE. THE
COST FOR ASPHALT SAWED JOINTS, WHEN REQUIRED, SHALL BE INCLUDED IN THE BID
PRICE FOR PAVEMRNT REMOVAL AND REPLACEMENT.
18. PAVEMENT MARKINGS: WHERE EXISTING PAVEMENT MARKINGS AND LINES ARE IN
CONFLICT WITH THE TRAFFIC PATTERN BEING USED ON CONSTRUCTION, THE
CONTRACTOR SHALL REMOVE OR OVERLAY LINES TO THE SATISFACTION OF THE
ENGINEER, SUCH THAT THE LINES DO NOT CONFUSE THE TRAVELING PUBLIC. ALL
REMAINING LINES OR MARKINGS SHALL BE IN ACCORDANCE WITH THE "MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES", OR AS DIRECTED BY THE ENGINEER. TRAFFIC
SHALL NOT BE ALLOWED ON ANY PAVEMENT NOT PROPERLY STRIPED.
19. BID PRICE AND CONSTRUCTION MAITENANCE: THE BID PRICE SHALL INCLUDE, BUT IS NOT
LIMITED TO CONSTRUCTION, MAINTENANCE, AND REMOVAL OF TEMPORARY SIGNING
AND PAVEMENT MARKINGS, BARRICADES, CHANNELIZING DEVICES ETC. REQUIRED FOR
MAINTENANCE OF TRAFFIC DURING CONSTRUCTION.
20. GRASSING: ALL CUT AND FILL SLOPES SHALL BE COVERD WITH MULCH AS DIRECTED BY
THE ENGINEER IMMEDIATELY AFTER THE SLOPES ARE ESTABLISHED IN ORDER TO REDUCE
EROSION.
21. DRAINAGE MAINTENANCE: THE CONTRACTOR SHALL ENSURE THAT POSITIVE AND
ADEQUATE DRAINAGE IS MAINTAINED AT ALL TIMES WITHIN THE PROJECT LIMITS. THIS
MAY INCLUDE, BUT NOT BE LIMITED TO, REPLACEMENT OR RECONSTRUCTION OF
EXISTING DRAINAGE STRUCTURES THAT HAVE BEEN DAMAGED, REMOVED OR REGRADED
AS REQUIRED BY THE ENGINEER, EXCEPT FOR THOSE DRAINAGE ITEMS SHOWN AT
SPECIFIC LOCATIONS IN THE PLANS. NO SEPARATE PAYMENT WILL BE MADE FOR ANY
COSTS INCURRED TO COMPLY WITH THIS REQUIREMENT.
22. QUANTITIES: QUANTITIES SHOWN ON THE PLANS ARE FOR ESTIMATION PURPOSES ONLY.
CONTRACTOR IS TO VERIFY ALL QUANTITIES TO BE INCLUDED IN THE BID PRICE.
23. TEMPORARY SIGNAGE: CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY
SIGNAGE AND BARRICADES AND FOLLOW THE PROJECT TRAFFIC CONTROL PLAN. ALL
TEMPORARY SIGNAGE AND PAVEMENT MARKING SHALL BE IN ACCORDANCE WITH THE
"MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES", CURRENT EDITION AND/OR AS
DIRECTED BY THE ENGINEER.
24. EROSION CONTROL 1: EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO
LAND DISTURBANCE ACTIVITIES AND SHALL BE MAINTAINED AT ALL TIMES. ADDITIONAL
EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED IF DEEMED NECESSARY
BY ON SITE INSPECTION OR AS DIRECTED BY THE ENGINEER.
25. EROSION CONTROL 2: ALL SILT FENCES MUST BE PLACED AS ACCESS IS OBTAINED DURING
CLEARING. NO GRADING SHALL BE DONE UNTIL SILT FENCE INSTALLATION IS COMPLETE.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ALL SILT FENCES AND TO REPAIR
OR REPLACE ANY SILT FENCE THAT IS NOT SATISFACTORY. EROSION CONTROL GATES
SHALL BE PLACED IMMEDIATELY AFTER DRAINAGE STRUCTURES ARE IN PLACE. ALL
EROSION CONTROL DEVICES SHALL BE PLACED ACCORDING TO THE PLANS AND AS
DIRECTED BY THE ENGINEER. SEE THE GEORGIA STANDARD SPECIFICATIONS AND THE
"MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA", CURRENT EDITION
REGARDING EROSION CONTROL. THE CONTRACTOR SHALL BE RESPONSIBLE TO KEEP
WETLAND AREAS FREE FROM SILTATION. THE CONTRACTOR SHALL OBTAIN AND ABIDE BY
ALL CORPS OF ENGINEERS RULES AND REGULATIONS CONCERNING CONSTRUCTION
ADJACENT TO WATERWAYS AND MAINTAIN WATER QUALITY.
26. EROSION CONTROL 3: THIS PROJECT HAS A TOTAL AREA OF 0.1 ACRES AND THE
EXPECTED DISTURBED AREA IS 0.1 ACRES. THE TOTAL AREA IS WITHIN THE
RIGHT-OF-WAY, AND THE DISTURBED AREA IS THE AREA ASSOCIATED WITH CLEARING,
GRADING, EXCAVATING, FILLING OF LAND, OR OTHER SIMILAR ACTIVITIES WHICH MAY
RESULT IN SOIL EROSION, AS DEFINED UNDER "CONSTRUCTION ACTIVITIES" IN THE STATE
OF GEORGIA NATURAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL
PERMIT NO. GAR100002.
27. TEMPORARY DRIVEWAYS: AGGREGATE SURFACE COURSE FOR TEMPORARY DRIVEWAYS,
INCLUDING MATERIAL, HAUL AND PLACEMENT SHALL BE USED AT THE ENGINEER'S
DIRECTION TO FACILITATE THE MOVEMENT OF THE LOCAL TRAFFIC THROUGH THE
CONSTRUCTION AREA DURING INCLEMENT WEATHER. WHEN USED FOR THIS PURPOSE,
SECTION 318 OF THE GEORGIA D.O.T. STANDARD SPECIFICATIONS IS MODIFIED TO
PERMIT TRUCK DUMPING ON UNPREPARED WET, MUDDY SUBGRADE. SECTION 318 IS
FURTHER MODIFIED TO PERMIT THE USE OF CRUSHED STONE AS DESCRIBED IN SECTION
318.2.
28. AGGREGATES: THE CONTRACTOR WILL HAVE THE USE OF THE FOLLOWING MATERIALS:
A. GRADED AGGREGATE, ARTICLE 815.2.01
B. COARSE AGGREGATE, SIZE 467, ARTICLE 800.2.01
C. STABILIZED AGGREGATE, TYPE I OR II, SECTION 803.2 OR 803.2.02
D. CRUSHED STONE, ARTICLE 806.2.01
29. CONSTRUCTION LAYOUT AND STAGING PLAN: WILL BE REQUIRED BY THE CONTRACTOR.
ALL COST FOR THIS ITEM WILL BE INCLUDED IN THE BID PRICE.
30. NOTIFICATION BEFORE CONSTRUCTION: CITY OF SANDY SPRINGS PUBLIC WORKS
DEPARTMENT SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF ALL
CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COORDINATE THIS ACTION WITH
THE PROJECT MANAGER.
31. THE GEORGIA D.O.T. STANDARDS AND CONSTRUCTION DETAILS REQUIRED FOR THIS
PROJECT ARE LISTED ON THIS SHEET WITH THE LATEST KNOWN REVISION DATE BUT ARE
NOT INCLUDED AS PART OF THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING AND MAINTAINING ON THE PROJECT SITE THE CURRENT GEORGIA D.O.T.
STANDARD DRAWINGS AND THE CONSTRUCTION DETAIL DRAWINGS LISTED ON THIS
SHEET.
32. RELOCATION OF THE CITY FACILITIES: ANY ADJUSTMENTS OR RELOCATIONS OF THE CITY
OF SANDY SPRINGS PUBLIC WORKS DEPARTMENTS' FACILITIES SHALL BE IN ACCORDANCE
WITH THE CITY OF SANDY SPRINGS ORDINANCE NO. 2008-09-48. THIS DOCUMENT IS
AVAILABLE AT THE DEPARTMENT'S OFFICE AT 1 GALAMBOS WAY SANDY SPRINGS,
GEORGIA 30328, TELEPHONE 770-730-5600. THE 24 HR EMERGENCY CONTACT NUMBER
FOR THE CITY OF SANDY SPRINGS IS 770-730-5600.
33. ENSTORM DRAINAGE FOR THE ROADWAY MUST BE MAINTAINED DURING
CONSTRUCTION.
34. IRRIGATION SYSTEMS: UNLESS OTHERWISE SPECIFIED, FOR ANY IRRIGATION SYSTEM
COUNTERED WITHIN THE LIMITS OF CONSTRUCTION CONTRACTOR TO REESTABLISH THE
IRRIGATION SYSTEM (INCLUDING TESTING). THE CONTRACTOR IS TO CUT AND CAP
IRRIGATION SYSTEM OUTSIDE OF LIMITS OF CONSTRUCTION DURING CONSTRUCTION.
35. REMOVAL OF DEBRIS: PRIOR TO PROCEEDING WITH CONSTRUCTION, ANY DEBRIS
REMAINING AFTER THE REMOVAL OF THE EXISTING STORM SEWER PIPES/STRUCTURES
AND OTHER DELETERIOUS NON-SOIL MATERIALS SHOULD BE STRIPPED FROM PROPOSED
CONSTRUCTION AREAS.
36. EXCAVATION BRACING (SHORING) DESIGN AND INSTALLATION IS THE RESPONSIBILITY OF
THE GENERAL CONTRACTOR. ANY SHORING (INCLUDING TRENCH BOXES) GREATER THAN
FOUR FEET MUST BE SIGNED AND SEALED BY STRUCTURAL ENGINEER CURRENTLY
REGISTERED IN THE STATE OF GEORGIA.
37. FILL MATERIALS SHOULD BE LOW PLASTICITY SOIL (PLASTICITY INDEX LESS THAN 30), FREE
OF NON-SOIL MATERIALS AND ROCK FRAGMENTS LARGER THAN 3 INCHES IN ANY ONE
DIMENSION.
38. SOIL MOISTURE CONTENT SHOULD BE MAINTAINED WITHIN 3 PERCENT OF THE
OPTIMUM MOISTURE CONTENT.
39. ORGANIC AND/OR DEBRIS LADEN MATERIAL (>3% ORGANICS, BY WEIGHT) IS NOT
SUITABLE FOR RE-USE AS STRUCTURAL FILL.
40. FILL MATERIAL COMPACTION: FILL SHOULD BE PLACED IN THIN, HORIZONTAL LOOSE LIFTS
(MAXIMUM 8-INCH) AND COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD
PROCTOR MAXIMUM DRY DENSITY (ASTM D-698). THE UPPER 8 INCHES OF SOIL BENEATH
PAVEMENTS SHOULD BE COMPACTED TO AT LEAST 98 PERCENT.
41. COMPACTION TESTING: CONTRACTOR SHALL PROVIDE INDEPENDENT GEOTECHNICAL
TESTING TO VERIFY THAT THE SOIL COMPACTION MEETS THE CITY OF SANDY SPRINGS
STANDARDS IF A ROADWAY REPAIR IS NEEDED.
42. FILL MATERIALS USED IN STRUCTURAL AREAS SHOULD HAVE A TARGET MAXIMUM DRY
DENSITY OF AT LEAST 95 POUNDS PER CUBIC FOOT (PCF).
43. COMPACTION: OPEN-GRADED CRUSHED STONE SHOULD BE PLACE IN RELATIVELY THIN
LIFTS OF 8 INCHES OR LESS AND DENSIFIED WITH VIBRATORY COMPACTION EQUIPMENT
44. GROUND WATER LEVEL: WATER LEVELS SHALL BE MAINTAINED AT LEAST ONE FOOT
BELOW WORKING SUBGRADE SURFACES TO AVOID DEGRADING SUBGRADE.
45. SUBGRADE DRAINAGE: THE SUBGRADE SHOULD BE WELL-DRAINED TO PREVENT THE
ACCUMULATION OF WATER.
46. WATER MAIN CROSSING: WHERE WATER MAINS CROSS SEWERS, A MINIMUM VERTICAL
SEPARATION OF 18” MUST BE PROVIDED BETWEEN THE TWO PIPES, (MEASURED EDGE
TO EDGE). AT SUCH CROSSINGS ONE LENGTH OF WATER PIPE MUST BE LOCATED SUCH
THAT BOTH JOINTS ARE AS FAR FROM THE CROSSING AS POSSIBLE. THIS DOES NOT APPLY
TO THE REMOVAL AND REPLACEMENT OF THE EXISTING STORM SEWER PIPES.
47. BURRIED ELECTRICAL LINES: MINIMUM COVER REQUIRED FOR BURIED ELECTRICAL
UTILITIES IS 30 INCHES. CONTRACTOR TO ENSURE COVER REQUIREMENT IS MET.
CONTRACTOR SHALL ENSURE THAT AT LEAST 6” OF SEPARATION IS PROVIDED BETWEEN
THE STORM SEWER AND ANY ELECTRICAL UTILITIES.
48. PRECAST CONCRETE MATERIALS: SPIN CAST SHALL BE PERMACAST PL-8000 OR
EQUIVALENT.
49. DISTURBED AREAS: ANY AREA DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO
CONDITION PRIOR TO CONSTRUCTION.
50. JOINT SEALANT: ASTM C990-01a IS THE SPECIFICATION FOR THE JOINTS OF CONCRETE
PIPES, MANHOLES, AND PRECAST BOX SECTIONS USING PREFORMED FLEXIBLE JOINT
SEALANTS.
51. MANHOLE COVER LIDS WITH OTHER MUNICIPALITIES NAME WILL NOT BE ACCEPTED.
52. CONSTRUCTION ENTRANCE SHALL BE REQUESTED BY THE CONTRACTOR AND APPROVED
BY THE CITY ENGINEER.
Survey Note:
1. HORIZONTAL CONTROL IS BASED UPON GEORGIA STATE PLANE COORDINATE SYSTEM.
2. THE SURVEY FOR THIS PROJECT WAS PREPARED BY GeoSURVEY LTD, USING
TOPOGRAPHIC FIELD SURVEYING METHODS AND SUPPLEMENTED BY CITY OF SANDY
SPRINGS GIS DATA.
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A
JUNE 19, 23
ISSUED FOR CONSTRUCTION
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
(50' R/W)
DAVID CORTS, SR.
DAVID CORTS, JR.
ERNEST T. BROWN
ReD
HEINZ CARRINGTON
MARTHA PENELOPE
EXISTING BRICK HEADWALL
TO BE REMOVED
REMOVE EXISTING TREE
REMOVE 22 LF OF
DETERIORATED 18" CMP
TEMPORARY
CONSTRUCTION
EASEMENT
PERMANENT
DRAINAGE
EASEMENT
CAUTION: OVERHEAD
ELECTRIC CABLES
REMOVE APPROXIMATELY
85 LF OF EXISTING
CONCRETE CURB
EX. STONE CURB
EX. CONCRETE HEADER CURB
X EL. 837.25
X EL. 836.98
X EL. 836.87
X EL. 836.75
X EL. 836.49
X EL. 836.19
X EL. 836.11
X EL. 836.06 X EL. 836.00
X EL. 835.93 X EL. 835.90
X EL. 835.58
SLOPE 1.9%
SLOPE 1.9%
SLOPE 0.55%
SLOPE 0.5%
SLOPE 2.1%
S
T
A
T
E
S
T
R
E
A
M
B
U
F
F
E
R
S
T
R
E
T
U
R
U
N
D
A
R
Y
S
T
R
E
T
U
R
U
N
D
A
R
Y
S
T
A
T
E
S
T
R
E
A
M
B
U
F
F
E
R
EXISTING REINFORCED
CONCRETE HEADWALL
WITH ENERGY DISSIPATERS
EXISTING TYPE 1
RIP RAP 3 FEET DEEP.
EXISTING CONDITIONS & DEMO PLAN
EXISTING CONDITIONS & DEMO PLAN
Scale: 1"= 10'
THE CITY OF SANDY SPRINGS
DEPARTMENT OF PUBLIC WORKS
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
3 OF18
Project Location:1025-1075 Crest Valley Drive
X
X
X
X
X
X
X
X
Know what's below.
before you dig.Call Dial 811
Or Call 800-282-7411
NOTES:
1. THE TEMPORARY CONSTRUCTION EASEMENT IS THE STAGING AREA. CUT
THE TREES IN THIS AREA AND FILL WITH SOIL MATERIAL TO MAKE IT
USABLE FOR MACHINARY AND CONSTRUCTION MATERIAL STORAGE.
THE SIDE SLOPES TO BE 3:1.
2. FOR EASEMENT DIMENSIONS SEE PLATS OF EASEMENT ON SHEET 15.
3. SURVEY PREPARED BY GEOSURVEY LAND SURVEYORS DATE 6/2/2020.
HEADWALLS AND STORM SEWER UPDATED SOUTH OF THE STREET
CENTERLINE BY NEELU INC.
4. GUTTER ELEVATIONS NORTH SIDE OF THE STREET ADDED BY NEELU INC.
X
X
X
X
X
(SEE NOTE 2)
(SEE NOTE 2)
SEE NOTE 1
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
CAUTION: OVERHEAD
ELECTRIC CABLES
REMOVE:
ONE 8" POPLAR TREE
ONE 15" POPLAR TREE
ONE 5" BEECH TREE
ONE 4" BEECH TREE
ONE 38" PINE TREE
ONE CLUSTER HARDWOOD TREE
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A ISSUED FOR CONSTRUCTION
JULY 05, 23
X
X
X
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
JB
(50' R/W)
DAVID CORTS, SR.
DAVID CORTS, JR.
ERNEST T. BROWN
HEINZ CARRINGTON
MARTHA PENELOPE
PROPOSED RIP RAP
PROPOSED 84" REINFORCED
CONCRETE HEADWALL
22 LF OF 18" DETERIORATED CMP
TO BE REPLACED WITH 18" RCP
P
R
O
C
P
THE ENTIRE LENGTH OF THE 84"
CULVERT WILL BE REHABILITATED
TEMPORARY
CONSTRUCTION
EASEMENT
PERMANENT
DRAINAGE
EASEMENT
MODIFY 4' INSIDE DIA. JB FOR
NEW 18" RCP PENETRATION
PROPOSED 22 LF
OF 18" RCP
EX. STONE CURB
110 LF OF DETERIORATED 6"
CONCRETE HEADER CURB
(TYPE 2) TO BE REPLACED
SEE SHEET 10 FOR DETAIL
S
T
A
T
E
S
T
R
E
A
M
B
U
F
F
E
R
S
T
R
E
T
U
R
U
N
D
A
R
Y
S
T
R
E
T
U
R
U
N
D
A
R
Y
S
T
A
T
E
S
T
R
E
A
M
B
U
F
F
E
R
EXISTING REINFORCED
CONCRETE HEADWALL
WITH ENERGY DISSIPATERS
EXISTING TYPE 1
RIP RAP 3 FEET DEEP.
PROPOSED IMPROVEMENTS PLAN
PROPOSED IMPROVEMENTS PLAN
Scale: 1"= 10'
Know what's below.
before you dig.Call Dial 811
Or Call 800-282-7411
THE CITY OF SANDY SPRINGS
DEPARTMENT OF PUBLIC WORKS
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
4 OF18
Project Location:1025-1075 Crest Valley Drive
STREAMBANK RIP RAP
H=3' @ 1.5:1 SLOPE
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A ISSUED FOR CONSTRUCTION
JULY 05, 23
B K.A ISSUED FOR CONSTRUCTION
JULY 20, 23
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
THE CITY OF SANDY SPRINGS
DEPARTMENT OF PUBLIC WORKS
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
5 OF18
Project Location:1025-1075 Crest Valley Drive
THIS IMAGE SHOWS AN EXAMPLE OF A CMP WITH REINFORCED
90°
50°
GROUT PORTS @ 6' SPACING (TYP)
@ 5, 7 O'CLOCK CIRCUMFERENTIAL POSITIONS
FILL VOIDS UNDER THE CULVERT
WITH SLURRY CEMENT BACKFILL
4" CONCRETE INVERT PAVING
(FROM TOP OF CORRUGATIONS)
2"
84" CMP CULVERT PIPE LINING DETAIL REHABILITATION
1. DIVERT STREAM RUNOFF AND DEWATER THE UPSTREAM
HEADWALL AREA.
2. REMOVE THE RUST AND COATING FROM THE 84" CMP
INVERT PAVING AREA AND CLEAN.
3. USE CHEMICAL EXPANSION GROUT TO FILL VOIDS OUTSIDE OF THE PIPE.
4. THE FOLLOWING JOINTS NEED REPAIR AND EXPANSION RINGS:
THE JOINTS AT 21', 41', AND 62' FROM THE DOWNSTREAM END.
5. SEAL JOINTS USING STEEL EXPANSION RINGS AND RUBBER
GASKETS AT THE REPAIRED JOINTS.
6. INSTALL STUDS, TACK WELD WIRE FABRIC AND PLACE CONCRETE.
SLO
PE 5
:1
CONCRETE LINING
#10 WELDED WIRE FABRIC 6"X6"
TACK WELD TO METAL STUDS
TRANSVERSELY AND 24" LONGITUDINALLY
METAL STUDS
1/2" DIA. 2-1/2" LONG METAL STUDS WELDED
TO CREST OF CORRUGATION @24"
CULVERT REHABILITATION
EXISTING 84" CORRUGATED
METAL PIPE CULVERT
CORRUGATION SPACING: 5"
CORRUGATION DEPTH: 1"
SLO
PE 5:1
A A
2'-0"
SECTION A-A
INTERNAL EXPANDING TYPE COUPLING BAND WITH GASKETS AND SEALING MATERIAL
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A
JUNE 19, 23
ISSUED FOR CONSTRUCTION
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
6 OF18
Project Location:1025-1075 Crest Valley Drive
Storm Sewer Tabulation
Stormwater Studio 2023 v 3.0.0.31
Project Name: 1025 Crest Valley Drive.
04-27-2023
Line
ID
(ft )
22 LF 18" RCP
Drng Area
Incr Total
(ac ) (ac ) (C )
22.00 0.000 2.200 0.00 0.00 1.43
C x A
Incr Total
Tc
Inlet Syst
(min )
0.0
Line
(in/hr ) (cfs ) (ft/s )
5.94 8.74 13.59 35.40 10.84
Size Slope
(in )
Invert Elev
Up
11.36 828.50
Dn
826.00
HGL Elev
Up
829.81
Dn
826.77
Surface Elev
Up
836.54
Dn
830.0 1
Line
No
Notes: IDF File = AlpharettaGA (1).idf, Return Period = 25-yrs. Total Qs limited to inlet captured flows.
Project File: Crest Valley Storm Sewer Model 4-27-23.sws
L e n g t h
R a t i o n a l
I n t e n s i t y
T o t a l
Q
C a p a c i t y
V e l o c i t y
18" STORM SEWER PIPE PROFILE
18" STORM SEWER PIPE PROFILE
TRENCH DETAIL
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
PR
O
PO
SE
D
HE
AD
W
AL
L
REMOVE EXISTING 18" CMP AND REPLACE WITH 18" RCP
P
R
O
P
O
S
E
D
G
O
U
N
D
E
X
G
R
O
U
N
D
25-YR HGI
22Lf- 18"@
11.3 6%
825.00
827.00
829.00
831.00
833.00
835.00
837.00
839.00
841.00
10 15 20 25 30 823.00
843.00
845.00
847.00
Grnd Surface
LINE 1- 22FL 18" RCP
St a
0+
O ut fa ll
EX
. G rn d.
E l.
9.
In v.
E l.
6.
HG
L
6.
St a
0+
Li ne :1
In v.
E l.
8.
In
HG
L
9.
O ut
Ri m
. E l.
6.
In v.
E l.
8.
O ut
HG
L
9.
In
HGL
-10
825.00
827.00
829.00
831.00
833.00
835.00
837.00
823.00
-20
821.00
819.00
817.00825.00
827.00
829.00
831.00
833.00
835.00
837.00
839.00
841.00
823.00
843.00
845.00
847.00
825.00
827.00
829.00
831.00
833.00
835.00
837.00
823.00
821.00
819.00
817.00 0 10 20 30 40 50 60 70 80 90 100
EL. 819.0
EL. 823.1
EL. 832.11
EL. 828.0
839.00 839.00
EL. 836.6
Y
R
H
G
L
P
I
E
I N
I N
G
EX. 84" CORRUGATED METAL
PIPE CULVERT
EX
. R
EI
N
F.
C
O
C.
HE
AD
W
AL
L
EX
. G
AS
P
IP
E
EX
. S
AN
W
AT
ER
M
AI
N PROP. SLOPE
18" STORM SEWER PIPE
EX
. C
G
EX
. C
G
EX. PAVEMENT
SE
W
ER
EX
. J
U N
CT
IO
N B
O X
84" CORRUGATED METAL PIPE CULVERT PROFILE
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A
JUNE 19, 23
ISSUED FOR CONSTRUCTION
MODIFY EX. JB FOR NEW 18" DIA.
RC PIPE PENETRATION
EL. 832.1 PR
O
P.
EL
. 8
.0
EX
IS
TI
N
G
JU
N
CT
IO
N
B O
X
PP
RO
PO
SE
D
HE
AD
W
AL
L
6.0'
82.0'
6.0'
SCALE: 1in = 2.5 ft H, 1in = 5 ft V
SCALE: 1in = 15 ft H, 1in = 5 ft V
84" CMP CULVERT TABULATION ( 100-YR RETURN PERIOD PIPE CHART)
Discharge Velocity Depth HGL @ Hw/D = 0.88
Invert
Total Culvert
Over Top
Down
Up
Down
Up
Down
Up
Down
Up
Hw
(cfs ) (cfs ) (ft/s ) (in )
257.60 257.60 0.00 16.29 10.60 36.1 50.7 822.01 826.83 828.77 828.00 832.10
(min ) (cfs ) (ft ) (ft ) (ft ) (ft ) (ft ) (ft )
(cfs ) (ft/s ) (in ) (ft/s ) (ft/s ) (ft/s ) (ft/s ) (ft/s )
NOTE: THE ACTUAL DOWNSTREAM VELOCITY IS BELOW 15 FT/S DUE TO THE ENERGY DISSIPATERS.
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
B B
C
C
Scale: 1"=2'
BEDDING STONE
Scale: 1"=2'
THE CITY OF SANDY SPRINGS
DEPARTMENT OF PUBLIC WORKS
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA Project Location:1025-1075 Crest Valley Drive
HEADWALL DESIGN
Scale: 1"=2'
0'-8"
5'-4"
0'-10" 5'-2"
17'-0"
INVERT LINING
1'-0"
7'-5" 2'-6"
1'-0"
DRAWING NO.
7 OF18
HEADWALL CONSTRUCTION NOTES:
1. CONTRACTOR SHALL CONTACT "GEORGIA 811" PRIOR TO STARTING ANY EXCAVATION.
2. CONTRACTOR SHALL VERIFY ANY CONFLICTS WITH EXISTING UTILITIES. IF A CONFLICT IS
ENCOUNTERED, CONTRACTOR SHALL NOTIFY ENGINEER AND CITY OF SANDY SPRINGS AND A
RESOLUTION SHALL BE REACHED BEFORE WORK PROCEEDS IN THE AFFECTED AREA.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE AND MAINTAIN ANY AND ALL WORK
NECESSARY TO PROTECT EXISTING UTILITIES (INCLUDING PIPELINES, POWER, AND COMMUNICATION
LINES) IN THE PROJECT VICINITY. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED TO THE
SATISFACTION OF THE ENGINEER AND CITY OF SANDY SPRINGS AT THE SOLE EXPENSE OF THE
CONTRACTOR AND/OR HIS SUB-CONTRACTORS.
4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE AND MAINTAIN ANY AND ALL WORK
NECESSARY TO PROTECT EXISTING FACILITIES (THIS INCLUDES PAVEMENT, SIDEWALKS, DRAINAGE
STRUCTURES, TREES, AND PLANTED AREAS). ANY DAMAGE TO EXISTING FACILITIES SHALL BE
REPAIRED TO THE SATISFACTION OF THE OWNER AT THE SOLE EXPENSE OF THE CONTRACTOR AND/OR
HIS SUB-CONTRACTORS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND ERECTION OF ALL NECESSARY
FORM-WORK, TEMPORARY BRACING, AND SHORING REQUIRED DURING EXCAVATION OF SOIL
ADJACENT TO EXISTING STRUCTURES AND FACILITIES.
6. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND GRADE CONDITIONS (BOTH NEW
AND EXISTING), REPORTING ANY DISCREPANCIES TO THE ENGINEER PRIOR TO ORDERING MATERIALS
OR PROCEEDING WITH ANY PHASE OF THE WORK.
7. REFER TO CIVIL DRAWINGS FOR BEDDING BELOW THE HEADWALL.
8. CONTRACTOR SHALL CONTROL SITE GROUNDWATER AND/OR SURFACE WATER BY ALL MEANS
NECESSARY TO MAINTAIN A WATER LEVEL A MINIMUM 1 FEET BELOW FOUNDATION SUB-GRADE SO AS
TO NOT DAMAGE FOUNDATION EXCAVATIONS. THE BASE OF ALL FOUNDATION EXCAVATIONS SHOULD
BE FREE OF ALL WATER AND LOOSE SOIL PRIOR TO PLACING CONCRETE. ANY SUB-GRADE SOILS WHICH
HAVE BEEN WEAKENED DUE TO SATURATION OR DISTURBANCE SHALL BE RE-COMPACTED OR
REMOVED AND REPLACED WITH STRUCTURAL FILL AS DIRECTED BY THE PROJECT ENGINEER.
9. LOOSE OR SOFT SOILS SHALL BE CLEANED FROM FOUNDATION EXCAVATION BOTTOMS PRIOR TO
PLACING OF CONCRETE. SUB-GRADES NEEDING UNDERCUTTING SHALL BE BACKFILLED TO THE
ORIGINAL SUB-GRADE ELEVATION WITH COMPACTED FILL MATERIAL UNLESS DIRECTED OTHERWISE BY
THE ENGINEER. THE OVER-EXCAVATED AREA SHALL EXTEND A MINIMUM OF 1 FOOT BEYOND THE
EDGES OF THE STRUCTURE BASE SLAB OR FOOTING.
10. CONCRETE SLAB SHOULD BE PLACED AS SOON AS POSSIBLE AFTER EXCAVATIONS ARE MADE. IF THE
BEARING SOILS ARE SOFTENED BY SURFACE WATER INTRUSION OR EXPOSURE, THEN THE SOFTENED
SOILS MUST BE REMOVED FROM THE FOUNDATION EXCAVATION BOTTOM IMMEDIATELY PRIOR TO
PLACING OF CONCRETE. IF THE EXCAVATION MUST REMAIN OPEN OVERNIGHT, OR IF RAINFALL IS
IMMINENT WHILE THE BEARING SOILS ARE EXPOSED, THEN A 2- TO 3-INCH-THICK LAYER OF LEAN
CONCRETE (500 PSI MINIMUM STRENGTH) SHALL BE PLACED ON THE BEARING SOILS BEFORE THE
PLACEMENT OF REINFORCING STEEL. THE SUB-GRADE SHALL BE EXCAVATED AS REQUIRED TO
ACCEPT THE LEAN CONCRETE SO THAT THE INTENDED BOTTOM OF FOUNDATION ELEVATION IS NOT
CHANGED.
11. THE HEADWALL SLAB SHALL BE PLACED IN ONE CAST, NO HORIZONTAL JOINTS ARE PERMITTED.
12. ALL EXCAVATIONS SHALL CONFORM TO APPLICABLE OSHA REGULATIONS.
13. UNLESS NOTED OTHERWISE, ALL CONCRETE WORK, DETAILING, FABRICATION, AND PLACING OF
REINFORCING AND CONCRETE FOR THE HEADWALL STRUCTURE SHALL BE GOVERNED BY THE LATEST
REVISIONS OF: · ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE". · ACI 306 AND ACI 305 FOR
COLD AND HOT WEATHER CONCRETING. · ACI 318 BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE. · CRSI RECOMMENDED PRACTICE OF PLACING REINFORCING BARS.
14. ALL CONCRETE WORK SHALL MEET GDOT STANDARD SPECIFICATION SECTION 500 EXCEPT WHERE
NOTED OTHERWISE ON THE CONSTRUCTION DRAWINGS. IF A CONFLICT EXISTS BETWEEN THE
DRAWINGS AND GDOT SPECIFICATIONS, THE MORE STRINGENT SHALL APPLY.
15. ALL CONCRETE SHALL BE NORMAL WEIGHT GDOT CLASS A AIR-ENTRAINED WITH A MAXIMUM UNIT
WEIGHT OF 150 POUNDS PER CUBIC FOOT AND SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE
STRENGTH OF 3,000 PSI.
16. PROVIDE A 3/4" CHAMFER AT ALL EXPOSED CONCRETE CORNERS.
17. UNLESS NOTED OTHERWISE, REINFORCING STEEL SHALL CONFORM TO ASTM A 615, AND SHALL BE
GRADE 60.
18. CULVERT REINFORCING LAP SPLICES SHALL BE PER GDOT STANDARD 2324. REINFORCING BAR HOOK
DIMENSIONS, AND ALL OTHER REINFORCING BAR LAP SPLICES SHALL BE CLASS "B" TENSION LAPS AND
SHALL BE AS REQUIRED PER THE SCHEDULE ON CULVERT DRAWING.
19. UNLESS OTHERWISE NOTED ON THE DRAWINGS, THE FOLLOWING CONCRETE COVER SHALL BE
PROVIDED OVER REINFORCEMENT: · CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO
EARTH: 2” · ALL OTHER CONCRETE: 1.5”
1'-0"
EL. 823.1
D
D
11'-2"
17'-0"
2'-6"1'-0"
13'-0"
EX. 84" CMP
REINF. CONC.
PIPE LINING
89" OPENING
2'-6" OPENING
FOR 18" RCP
EL. 823.1
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
EL. 832.1
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A
JUNE 19, 23
ISSUED FOR CONSTRUCTION
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
REINFORCEMENT
C
L
1'-6"
8"
1'-6" MIN. LAP ABOVE
CONSTR. JT. (BASIC REINF.)
RAKED CONSTR. JT.
2" CL.
NO. 4 BARS
12" C. TO C.
BOTH WINGS
ADDITIONAL BARS 45"
ABOVE SLAB & IN
BOTTOM SLAB
POS.
Scale: N.T.S.
Scale: N.T.S.
Scale: N.T.S.
NO. 4 BARS
12" C. TO C.
BOTH FACES
NO. 4 BARS
12" C. TO C.
BOTH FACES
POS.
POS.
NO. 4 BARS 12" C.
TO C. BOTH FACES
BOTH WINGS
A
A
BB
NO. 4 BARS
12" C. TO C.
BOTH FACES
POS.
Scale: N.T.S.
NO. 4 BARS
8" C. TO C.
BOTH FACES
2" CL.
POS.
NO. 4 BARS
8" C. TO C.
BOTH FACES
POS.
2" CL.
NO. 4 BARS
12" C. TO C.
BOTH FACES
NO. 4 BARS
12" C. TO C.
BOTH FACES
POS.
2" CL.
B B
NO. 4 BARS 12" C. TO C. BOTH FACES
BOTH WINGS
2- NO. 4 BARS 12" C. TO C.
BOTH FACES POS.
POS.
2- NO. 4 BARS 12" C. TO C.
BOTH FACES
POS.
NO. 4 BARS
BOTH FACES
POS.
NO. 4 BARS
12" C. TO C.
BOTH FACES
POS.
NO. 4 BARS
12" C. TO C.
BOTH FACES
POS.
NO. 4 BARS 12" C. TO C.
BOTH FACES
POS.
NO. 4 BARS
12" C. TO C.
BOTH FACES
POS.
THE CITY OF SANDY SPRINGS
DEPARTMENT OF PUBLIC WORKS
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
8 OF18
Project Location:1025-1075 Crest Valley Drive
HEADWALL DESIGN FORMWORK &
REINFORCEMENT
2- NO. 4 BARS 12" C. TO C.
BOTH FACES
NO. 4 BARS 12" C. TO C.
BOTH FACES
NO. 4 BARS 12" C. TO C.
BOTH FACES
C C
EL. 823.1
NO. 4 BARS
12" C. TO C.
BOTH FACES
POS.
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
0'-8"
0'-10"
13'-0"
POS.
ADDITIONAL NO. 4
BARS BOTH FACE
NO.4 BARS
BOTH FACES
POS.
POS.
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A
JUNE 19, 23
ISSUED FOR CONSTRUCTION
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
9 OF18
Project Location:1025-1075 Crest Valley Drive
CONSTRUCT STONE VENEER FACING ON 84" HEADWALL. STONE VENEER
TO BE ATTACHED TO THE HEADWALL USING BRICK TIES AT 24"X24".
SEE MANUFACTURER SPECIFICATIONS
Note: Dimensions and quantities are for information only.
The contractor must take measurements after formwork is completed.
d b
90° BEND
SECTION
CRITICAL
LDH
180° HOOK
LDH
R
4db
(2-1/2" MIN.
LD
STANDARD
CLASS "B"
LAP AND
TOP BAR LAP
TOP BAR - DEFINED AS A BAR
LOCATE SUCH THAT 12 IN. OR
MORE OF FRESH CONCRETE IS CAST
IN THE MEMBER BELOW THE SPLICE
MINIMUM OUTSIDE RADIUS OF BEND,
R, SHALL BE 4db
LD - STANDARD DEVELOPMENT LENGTH OF BAR
LDH - STANDARD DEVELOPMENT LENGTH OF HOOK
F'c - SPECIFIED COMPRESSIVE STRENGTH OF CONCRTE db - BAR DIAMETER PER ASTM
REBAR SPLICE AND HOOK
DIMENSIONS IN REIINF. CONCRETE
F'c =4.500 PSI
NOTES :
ASTM
BAR
SIZE
LD
CLASS
B
LAP
TOP
BAR
LAP
LDH
12"
12"
17"
14"
12"
14"
21"
18"
14"
19"
28"
23"
7"
9"
28"
23"
SEE SPLICE SCHEDULE
HORIZ. BARS
VERT. BARS
NO. 4 BARS
"U" BARS AT ENDS OF
WALLS, MATCH SIZE AND
SPACING OF HORIZ. WALL RINFORCING
12db 12db
12db
SEE PLAN
S E
E
P
L A
N
TYP.
WALL ANGLE
WALL ANGLE
90° STD. HOOK
TYPICAL
NO. 4 BAR
FOR WALL CORNERS WHERE
" WALL ANGLE " IS GREATER THAN
120° BUT LESS THAN 180°
FOR WALL CORNERS WHERE
" WALL ANGLE " IS GREATER THAN
60° BUT LESS THAN 120°
NO. 4 BAR
NO. 4 BAR
Corner reinforcement and U-bars not included.
HEADWALL DETAILS AND BAR SCHEDULE
POS. SIZE SHAPE QTY.
Length
TOTAL LENGTH
REINFORCEMENT MTO
TOTAL LENGTH ( ft )
UNIT WEIGHT ( lbs/ft )
TOTAL WEIGHT BY SIZE ( lbs )
#1
#4
#2 #3 #4 #5 #6
#4
#4
#4
#4
#4
#4
#4
#4
#4
5'-2"
5" 5"
13' ~ 17'
5" 5"
9'-8"
4" 4"
12'-8"
4" 4"
16'-8"
5" 5"
2'-6"
5" 5"
3'-6" ~ 8'-6"
4" 4"
1'-8"
3'-6"
6'-2"
4"
6'-0"
4"
6' 17x2
7x2
2x2
8x2
4x2
204'
VAR. 224'
6'-10" 27'
10'-4"
160'
13'-4"
107'
3x2
105'
17'-6"
24x2
163'
7x2x2VAR.
4x2x26'-10"
177'
30x2
310'
3'-4"
5'-2"
110'
0.668
12 #4 1'-8" ~ 3'-0"
4" 4"
11x2VAR.
70'
13 #4 1' ~ 5'
5" 5"
6x2VAR.
44'
#4 1' ~ 8'-6"
4" 4"
6x2x2VAR.
220'
5"5"
14 #4
4'-4"
2x25'-2" 21'
5"5"
15 #4 4x23'-0" 24'
2'-2"
5"5"
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A
JUNE 19, 23
ISSUED FOR CONSTRUCTION
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
Rip-Rap Type and Installation
Rip-Rap slope will be used to stabilize the eroding stream banks. Rip-Rap installation shall be in accordance to GDOT section 805, Section 881, and
GSWCC 2016 Edition appendix C - Rip Rap.
· GDOT Section 805 - Rip Rap and Curbing Stone
· GSWCC 2016 Edition - Appendix C - Rip Rap
· GDOT Section 881 - Fabrics
1. Site preparation:
Streambanks shall be prepared for rip-rap installation by clearing any existing rocks and plants and creating a smooth sloped surface and compacted. The slope and location of final graded streambanks shall be according to the project construction drawings.
2. Geotextile Fabric
The geotextile fabric shall be placed over the graded and compacted sloped streambanks according to the detail provided on construction drawings. US
670 geotextile is recommended and meets the AASHTO M-288-06 requirements for Permanent Erosion Control & Subsurface Drainage.
3. Rip-Rap Stone
Type 3 rip-rap shall be used for streambanks protection. See GSWCC 2016
Edition, Appendix C, Table C-3 for Graded Rip-Rap Stone.
4. Rip-Rap Installation
Stones shall be placed from the base of the slope to the top in one operation.
The base of the rip-rap shall be a minimum of 1.5 feet below the stream natural grade. Placing of the rocks must not damage or disturb the geotextile fabric. The stones shall be placed by hand in an interlocking manner.
Dumping of rocks is not allowed. Riprap shall extend up the bank to an elevation where vegetation will provide adequate protection.
THE CITY OF SANDY SPRINGS
DEPARTMENT OF PUBLIC WORKS
1 GALAMBOS WAY
SANDY SPRINGS, GA 30328
PHONE: (770) 730 5600
SANDY SPRINGS
GEORGIA
Neelu, Inc.
601 Basset Ct., SE, Smyrna, GA 30080
Phone: (770) 312 2014
REVISIONS TABLE
Revision ByDate Description
REG I STEREDG E O R G I A
REENIGNE
RAM
ESH KA LVAKAALV
A
PROFESSIONAL
No. 26993 * *
SANDY SPRINGS
GEORGIA
DRAWING NO.
10 OF18
Project Location:1025-1075 Crest Valley Drive
DRAINAGE MAINTENANCE AND IMPROVEMENT PROJECT
0 K.A
JUNE 10, 23
ISSUED FOR COMMENT
A K.A ISSUED FOR CONSTRUCTION
STREAMBANK RIP RAP AND CURB AND
GUTTER DETAILS
JULY 05, 23
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
SEDIMENT & EROSION CONTROL NOTES
AND TREE PROTECTION DETAIL
EROSION, SEDIMENTATION, AND POLLUTION CONTROL
NOTES
PRIOR TO LAND-DISTURBING ACTIVITIES, THE CONTRACTOR SHALL SCHEDULE A
PRE-CONSTRUCTION MEETING WITH THE AREA EROSION CONTROL INSPECTOR.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE
INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES
PRIOR TO LAND DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE
EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS
SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING.
ALL DISTURBED AREAS LEFT MULCHED AFTER 30 DAYS SHALL BE STABILIZED WITH
PERMANENT VEGETATION.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST
WEEKLY, AFTER EACH RAIN, AND REPAIRED AS NECESSARY.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF
DETERMINED NECESSARY BY ON-SITE INSPECTION.
ALL SILT FENCES MUST BE TYPE C, WIRE BACKED, AND MEET THE REQUIREMENTS
OF SECTION 171-TEMPORARY SILT FENCE FOR THE GEORGIA DEPARTMENT OF
TRANSPORTATION, QUALIFIED PRODUCTS LIST #36.
ALL AMENDMENTS AND REVISIONS TO THE EROSION & SEDIMENT CONTROL PLANS
WHICH WILL HAVE A SIGNIFICANT EFFECT ON BEST MANAGEMENT PRACTICE (BMP)
WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN
PROFESSIONAL.
ALL TEMPORARY AND PERMANENT SEEDING MUST BE PERFORMED AT THE
APPROPRIATE SEASON. IN SUCH INSTANCES WHERE THE ESTABLISHMENT OF
VEGETATION IS INOPPORTUNE DUE TO SEASON OR DROUGHT, DISTURBED AREAS
SHALL BE TEMPORARILY STABILIZED USING 2”-4” OF MULCH (DS1). ADDITIONAL
PLANTINGS WILL BE NECESSARY IF A SUFFICIENT STAND OF GRASS FAILS TO GROW.
THE CITY'S DESIGNEE WILL VERIFY ADEQUATE VEGETATIVE COVER (100% COVER,
70% DENSITY) OF PERMANENT STABILIZATION (Ds3, Ds4).
SEDIMENT AND EROSION CONTROL MEASURES SHOULD BE CHECKED AFTER EACH
RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT
ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DEVICE.
CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH
WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING PROPERLY.
FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL MEASURES
WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH
MEASURES ARE CORRECTED BACK TO THE APPROVED EROSION CONTROL PLANS.
THE SITE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION
CONTROL MEASURES INCLUDING REPLACING OR REPAIRING ANY DAMAGED
DEVICES DUE TO ANY CONSTRUCTION ACTIVITY BY OTHERS.
DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN CAREFUL
SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND STRIPPED OF ITS
NATURAL GROUND COVER IS EXPOSED ONLY IN SMALL QUANTITIES AND
THEREFORE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .