2026006-BID5200 2026 Storm Drain UV Rehabilitation Projects
Closed State & local contract opportunity Posted
- Solicitation number
- 2026006-BID5200 2026 Storm Drain UV Rehabilitation Projects
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 89016 Complete Water Treatment Systems, Nonchemical: Ultraviolet Water Supply Sterilization, Etc.
- 89087 Water Treatment Equipment (Not Otherwise Classified)
- 91063 Public Utilities: Water, Sewer And Gas Maintenance And Repair
- 91378 Maintenance And Repair, Pipeline (Includes Removal And Relocation)
- 91381 Maintenance And Repair, Sewer And Storm Drain (Including Removal)
- UNSPSC codes
- 47101574 Sequencing batch reactor
- 47101564 Waste crusher
- 47101562 Drum screen
- 47101543 Surface aerator
- 47101569 Wastewater plane screen
- 47101547 Surface washing device
- 47101572 Disc screen
- 47101528 Water treatment dryers
- 47101541 Ozone water treatment equipment
- 47101545 Rotating biological contactor RBC
Show all 42
- 47101548 Filter control console
- 47101553 Fiber filter
- 47101560 Filter underdrain equipment
- 47101570 Oxidation ditch
- 47101573 Flocculator
- 48101619 Water sterilization system
- 20142600 Production control system instrumentation
- 47101517 Ultraviolet wastewater disinfection equipment
- 47101522 Packaged water treatment systems
- 47101525 Dewatering equipment
- 47101540 Chemical feeder
- 47101542 Air flotation equipment
- 47101550 Compression filter
- 47101551 Up flow filter
- 47101552 Moving bed filter
- 47101554 Jar tester
- 47101555 Baffle wall
- 47101557 Inclined plate settler
- 47101558 Foam breaker
- 47101559 Scum removal equipment
- 47101561 Adulteration treatment equipment
- 47101566 Multiple media filter
- 47101571 Chlorine gas neutralization unit
- 47101577 Flow arrangement wall
- 41103210 Laboratory ultraviolet UV sterilizers
- 47101523 Collection tanks
- 47101546 Grit removal system
- 47101549 Gravity filter
- 47101563 Wastewater coalescer
- 47101556 Water trough
- 47101565 Waste gas burner
- 47101567 Electrodialysis machine
Opportunity details come from columbiacountyga.bonfirehub.com. Updated .
About this opportunity
Columbia County, Georgia seeks competitive bids for the 2026 Storm Drain UV Rehabilitation Projects (Bid No. 2026006-BID5200), a public works construction contract procured through electronic bidding via the Bonfire Interactive platform. The project involves the rehabilitation of existing drainage pipes at two locations—308 Timberidge Drive and 108 Morehead Drive—using ultraviolet (UV) lining technology as the primary repair method. Deliverables include mobilization, site preparation (including sprinkler repair, shed removal, and fencing/concrete removal and replacement), UV lining installation for pipes ranging from 18 to 42 inches in diameter, erosion and sediment control measures, and site stabilization activities across 24 line items with estimated quantities provided. Qualified contractors must hold a valid State of Georgia Contractors License and comply with project-specific licensing requirements. The bid schedule requires electronic submission by February 19, 2026, at 12:00 PM Eastern Time, with a mandatory pre-construction conference before work commencement and a contract completion timeframe of 120 calendar days. Written questions must be submitted by February 11, 2026, at 5:00 PM Eastern Time. Bidders must submit a list of at least five previous projects of comparable size and complexity, identify all major subcontractors across relevant trades, and acknowledge that no guaranteed minimum work volume applies and that unit prices cannot be modified post-bid opening. The public bid opening will occur virtually on February 19, 2026, at 2:00 PM Eastern Time via WebEx.
The procurement contains no disclosed set-aside designations or restrictions limiting bidder eligibility to specific enterprise classifications. All bids must be accompanied by a 10 percent bid bond of the lump sum bid amount, with the successful contractor required to provide performance and payment bonds each equal to 100 percent of the contract value. Contractors must maintain comprehensive general liability insurance with minimum limits of $1,000,000 per person and $1,000,000 aggregate, along with workers' compensation and automobile liability insurance. The contract is structured as a unit price contract where final payment is based on actual quantities multiplied by bid unit prices, with the owner reserving the right to adjust, cancel, or expand work scope within the general project parameters. Liquidated damages are assessed at $500 per calendar day for project completion delays. No incumbent vendors or existing contractor relationships are identified in the procurement documents. The specific award value or budget range is not disclosed in the available materials; however, the project scope and cost can be estimated by contractors based on the provided engineering plans, detailed specifications, and estimated quantities for each line item.
Opportunity text
Bids for the complete work in one general contract shall be made on the electronic forms provided for all materials, equipment and labor for the construction of: Repair existing drainage pipes using ultraviolet lining
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity