2026 Yakima River Gap to Gap Project

Closed State & local contract opportunity Posted

Solicitation number
FC 3707
State
Washington
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Yakima County is soliciting bids for the 2026 Yakima River Gap to Gap Project, a floodplain restoration contract with proposals due August 26, 2026. The work spans ecological, geomorphic, and hydraulic restoration of the Yakima River floodplain between Selah Gap and Union Gap in Washington State.

The scope encompasses clearing and grubbing; side channel construction; engineered log jam installation; placement of large woody material; native material nourishment berms and channel armoring; habitat island construction; a pile-supported pre-cast reinforced concrete boardwalk across wetlands; culvert replacement for fish passage; and associated work per contract plans, contract provisions, and standard specifications. All work must conform to detailed technical specifications in the attached specification document (FC3707.pdf, 380 KB).

The project is funded through two grant sources: the Washington State Department of Ecology's Floodplains by Design program and the U.S. Federal Emergency Management Agency's Building Resilient Infrastructure and Communities program. Contract value, contract term, evaluation criteria, and pre-bid or site-visit dates are not specified in the available source material.

Opportunity text

This Contract provides for the improvement of the floodplain of the Yakima River from Selah Gap to Union Gap, reversing and restoring degraded ecological, geomorphic, and hydraulic processes. Work includes clearing and grubbing, Yakima River side channel construction, construction of engineered log jams, placement of large woody material, placement of native material of nourishment berms and channel armoring, construction of habitat islands, construction of a pile-supported pre-cast reinforced concrete boardwalk across wetlands, replacement of culverts to allow for fish passage, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The work is funded by grant funding from: Washington State Department of Ecology through Floodplains by Design (FBD) and U.S. Federal Emergency Management Agency through the Building Resilient Infrastructure and Communities (BRIC).

Files

File Type Posted
FC3707.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity