2026 RTU Replacements

Closed State & local contract opportunity Posted

Solicitation number
RFP MDP 260000002249 3
State
Michigan
Responses due

Opportunity facts

Jurisdictions
NIGP code

Updated .

About this opportunity

Madison District Public Schools is requesting proposals for labor services to replace three rooftop HVAC units at Wilkinson Middle School under the 2024 Sinking Fund Program, with proposals due July 1, 2026 at 2:00 PM EST. The District has issued two addenda as of June 25, 2026; all proposers must acknowledge receipt of Addendum No. 2 in their submissions.

The scope covers removal and replacement of existing RTU roof-mounted supports (four each location), painting of exposed natural gas piping (approximately 25 linear feet per location) with manufacturer-specified surface preparation, installation labor, mechanical and electrical connections, start-up, and all related materials and labor—but excludes the RTU equipment itself, which the District is prepurchasing through Griffin International. The three units specified are an HTDM-600-82-DX-MZ4 model (488 MBH input, multi-zone) and two HTDM-400-82 models (312 MBH input each) equipped with natural gas indirect-fired heat exchangers, variable frequency drives, BACnet controls, and modulating gas valves. No roofing work is required; units will sit on existing RTU curbs. All labor and materials must be warranted for a minimum of one year.

Minimum qualifications require five consecutive years in business, Michigan licensure, public sector experience, and completion of at least five RTU replacement projects exceeding $250,000 for public sector clients within the last ten years. Work must be completed in a single block not exceeding one week, with scheduling negotiated based on equipment delivery (target before September 2, 2026, or during off-hours and school breaks if delivery occurs during the school year). A 5% bid bond and Performance and Payment Bond (for work exceeding $50,000) are required. No prevailing wage applies. A non-mandatory pre-proposal meeting and site walkthrough occurred June 24 at Wilkinson Middle School. Questions were due June 26 at 2:00 PM EST. Bidder interviews are anticipated for July 3, 2026, by invitation only. Award may be made to the lowest responsive and responsible proposer or in the District's best interest.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity