26-041 - 2026 Lift Station Rehabilitation CCC - Tech Specs.pdf
PDF 14 MB Posted
- Solicitation number
- IFB 720 WUD 26-041 1
- Issued by
- Palm Beach County, Florida
About this file
This technical specifications document outlines a continuing construction contract for the 2026 Lift Station Rehabilitation project administered by Palm Beach County Water Utilities Department (PBCWUD) in Florida. The contract encompasses comprehensive rehabilitation of existing submersible wastewater lift stations, including demolition, installation or rehabilitation of wet wells, valve vaults, and manholes with corrosion barrier coatings; replacement of submersible pumps, guide rails, piping systems, and electrical panels; installation of new gravity sanitary sewer mains and point repairs; construction of access driveways and site restoration; and installation of remote telemetry units and control systems. Work will be performed on an as-needed basis through individual Work Authorizations, Work Orders, and Work Supplements, with no guaranteed minimum work volume. The County does not guarantee any work under this contract. Access to lift station sites is limited to 7:00 a.m. to 3:00 p.m. on weekdays, and the contractor must ensure that no more than three lift stations within a single sanitary sub-catchment basin or zone are on bypass simultaneously without prior written authorization.
The contract is structured as a unit-price contract with lump-sum allowances totaling $45,000 (Owner's Allowance of $25,000 and Utility Relocation Allowance of $20,000). Mobilization and demobilization costs may not exceed 3.5 percent of the total contract price. The contractor must provide all labor, materials, equipment, temporary facilities, testing services, permits, and utilities required for project completion. All costs related to preparing and implementing outage plans, temporary pumping and bypass operations, and coordination with the Owner's personnel are included in the bid prices with no additional compensation. The contractor is responsible for all OSHA compliance, traffic control in accordance with AASHTO MUTCD standards, environmental protection to prevent bypassing of untreated sewage, and maintaining NPDES permit compliance; penalties resulting from discharge violations caused by the contractor's actions will be borne entirely by the contractor and deducted from progress payments. Remaining funds from allowances will be credited to the Owner in a final adjusting change order upon contract closeout.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PBCWUD
STANDARD DESIGN SPECIFICATION SECTIONS
TABLE OF CONTENTS
PBCWUD No. 26-041
2026 LIFT STATION REHABILITATION
CONTINUING CONSTRUCTION CONTRACT
TECHNICAL SPECIFICATIONS
DIVISION 01 – General Requirements
01 11 00 Summary of Work 01 14 00 Work Restrictions 01 14 13 Access to Site 01 20 00 Price and Payment Procedures 01 21 00 Allowances 01 25 13 Product Substitution Procedures 01 26 63 Change Orders 01 29 00 Measurement and Payment 01 29 73 Schedule of Values 01 31 13 Project Coordination 01 32 16 Construction Progress Schedule 01 32 36 Video Monitoring and Documentation 01 33 00 Submittal Procedures 01 35 13 Special Project Procedure 01 35 29 Health, Safety, and Emergency Response Procedures 01 35 53 Security Procedures 01 42 13 Abbreviations and Acronyms 01 42 19 Reference Standards 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 01 55 26 Traffic Control 01 57 00 Temporary Controls 01 57 13 Temporary Erosion and Sediment Control 01 60 00 Products Requirements 01 66 00 Product Storage and Handling Requirements 01 71 13 Mobilization 01 71 23 Field Engineering 01 72 00 Project Record Drawing 01 73 29 Cutting and Patching 01 74 20 Gravity Pipeline Testing 01 75 00 Starting and Adjusting 01 76 10 Protection of Existing Facilities 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data
DIVISION 02 – Existing Conditions
02 00 00 Existing Conditions 02 41 00 Demolition 02 41 13.23 Utility Line Removal
DIVISION 03 – Concrete
03 00 00 Concrete 03 11 00 Concrete Forming 03 15 16 Concrete Construction Joints 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 60 00 Grouting 03 70 00 Concrete Repair
DIVISION 05 – Metals
05 50 00 Metal Fabrication
DIVISION 07 – Thermal and Moisture Protection
07 26 00 Vapor Retarder 07 90 00 Joint Protection
DIVISION 09 – Finishes
09 96 00.1 Corrosion Barrier System 09 96 10 Painting
DIVISION 26 – Electrical
26 00 00.1 Electrical General Requirements 26 00 10 Electrical Demolition 26 05 00 Basic Materials and Methods 26 05 26 Grounding 26 10 00 Conductors 26 29 13.16 Reduced Voltage Motor Controllers 26 30 00 Raceways 26 36 23.1 Automatic Transfer Switches 26 41 16 Lighting Prevention and Dissipation 26 91 05 Remote Terminal Unit
DIVISION 31 – Earthwork
31 10 00 Site Clearing 31 11 00 Clearing and Grubbing 31 20 00 Earth Moving 31 22 13 Rough Grading 31 22 19 Finish Grading 31 23 00 Excavation and Fill 31 23 13 Subgrade Preparation 31 23 19 Dewatering 31 23 33 Trenching and Backfilling 31 25 00 Erosion and Sedimentation Controls
DIVISION 32 – Exterior Improvements
32 01 18 Pavement Repair and Resurfacing 32 10 00 Bases, Ballasts, and Paving 32 12 16 Asphalt Paving 32 16 13 Curbs and Gutters
32 16 23 Sidewalks 32 16 33 Driveways 32 17 23 Pavement Markings 32 31 13 Chain Link Fences and Gates 32 90 00 Planting 32 91 13 Soil Preparation 32 92 23 Sodding
DIVISION 33 – Utilities
33 01 12 Sewer Flow Control 33 01 30.13 Sewer and Manhole Testing 33 01 30.16 TV Inspection of Gravity Pipelines 33 01 30.41 Cleaning of Sewers 33 01 30.61 Sewer and Pipe Joint Sealing 33 01 30.71 Rehabilitation of Sewer Utilities 33 05 13 Manholes and Structures 33 95 50 PVC Pressure Piping, Rubber Joints 33 95 60 Hot–Tapping Valves and Appurtenances
DIVISION 40 – Process Interconnections
40 05 00 Piping, General 40 05 07 Pipe Supports 40 05 19 Ductile Iron Process/Pressure Pipe 40 60 00 Process Control and Enterprise Management Systems 40 80 00 Cellular Phone Autodialer Alarm System 40 90 00 Process Control and Instrumentation 40 90 20.1 Control Panels 40 90 30 Remote Terminal Unit 40 90 40 Programming 40 97 00.1 Variable Frequency Drives
DIVISION 43 – Process Gas and Liquid Handling, Purification, and Storage Equipment
43 25 00.1 Submersible Pumps 43 25 00.2 New MOPS (4-ft diameter) Fiber Glass Wetwell and Appurtenance 43 30 00 Valves General 43 30 16 Check Valves 43 30 22 Gate Valves 43 55 10 Pump Station Fall Protection System 43 60 00 Inside Drop System
PBCWUD 26-041 SUMMARY OF WORK
REVISION DATE – 06/29/2023 PAGE 01 11 00 - 1
SECTION 01 11 00 – SUMMARY OF WORK
PART 1 -- GENERAL
1.1 THE SUMMARY
The work covered by these Contract Documents (Construction Drawings as per each approved Work Authorization/Order/Supplement and Technical Specifications) is in general the furnishing of all labor, materials, equipment, supplies, tools and manufactured articles of every kind required to conduct the work as described by the contract documents.
1. Provide the materials, equipment, and incidentals required to make the Project completely and fully operable.
2. Only the materials listed in Palm Beach County Water Utilities Department Engineering Services Division - Approved Materials and Equipment List (Latest Version) are approved for use within the PBCWUD service area, or as specified herein.
3. Provide the labor, equipment, tools, and consumable supplies required for a complete Project.
4. Provide the civil, and all other Work required for a complete and operable Project.
5. Test and place the completed Project in operation.
6. Provide the special tools, spare parts, lubricants, supplies, or other materials as indicated in Contract Documents for the operation and maintenance of the Project.
7. Arrange and coordinate with Supplier for deliveries of OWNER purchased products in accordance with construction schedule, coordinate to avoid conflict with work and conditions at the site. Unload the products at the site, and store and protect the products in accordance with the Supplier’s instructions.
8. The WORK shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the WORK in good faith shall be provided by the CONTRACTOR and coordinated with the ENGINEER as though originally so indicated, at no increase in cost to the OWNER.
9. CONTRACTOR shall comply with all applicable federal, state and local safety regulations, laws and standards, as well as any specific Palm Beach County or Water Utilities Department requirements while completing the work.
10. Except as specifically noted, the CONTRACTOR shall provide and pay for:
a. Labor, materials, and equipment.
b. Tools, equipment and machinery.
REVISION DATE – 06/29/2023 PAGE 01 11 00 - 2
c. Water, electricity, and other utilities required to complete project.
d. Other facilities and services necessary for proper execution and completion of the work.
e. Permits, surveys, and testing.
B. The work shall also include all transportation and all temporary services, utilities, systems and construction, including those not expressly shown or called for in the Bid Items of the Contract, necessary to properly accomplish and complete the work for each approved Work Authorization/Order/Supplement in accordance with the requirements of the Contract Documents.
C. The CONTRACTOR and its SUBCONTRACTORS shall meet the qualification requirements as defined in the front end specifications (Invitation to Bid, Instructions to Bidders, Palm Beach County Code Sections 2-51 through 2-54, as amended and to Florida Law, Appendix B).
1.2 DESCRIPTION OF WORK
Work is described in general, non-inclusive terms as:
1. Approved Work Authorization/Order/Supplements under this contract shall generally consists of the following major elements:
a. Rehabilitation of existing submersible type wastewater lift stations, including but not limited to: demolition and/or abandonment of existing facilities as necessary; installation of new wet wells/valve vaults/manholes or rehabilitation of existing wet wells/valve vaults/manholes, including application of coatings, safety grate installation, concrete top slab replacement including hatch covers, bypass piping and pumping; installation of new electrical panels; installation of a new electrical services where indicated; installation of new submersible wastewater pumps, guide rails, piping (force main replacement, tie-ins/tapping and line-stops; installation of new gravity sanitary sewer main and point repairs on existing gravity sanitary sewer mains), fittings, valves, concrete pads, fencing, water services with reduced pressure zone (RPZ) backflow preventers; new electrical services and electrical panels, wiring, controls, remote telemetry units with antennas, etc.; construction of access driveways, restoration of pavement and curbing, irrigation system, landscape restoration, and sod restoration.
b. Rehabilitation of lift station sites and work to be performed under this contract shall be outlined in each approved Work Authorization/Order/Supplement and any associated construction drawings.
c. The work under this contract shall be on an as-needed basis issued through Work Authorizations, Work Order, and Work Supplements. The County does not guarantee any work under this contract.
REVISION DATE – 06/29/2023 PAGE 01 11 00 - 3
d. The Contractor shall work within the right-of-way of Palm Beach County, Florida Department of Transportation, utility easements, temporary utility easements and other property only as directed and authorized by the County.
2. The Contractor shall complete all work as described in each approved Work
Authorization/Order/Supplement, and as shown in any associated construction drawings. All work and materials shall meet the requirements outlined in the contract Technical Specifications and the latest edition of the Palm Beach County Water Utilities Department’s Minimum Design and Construction Standards”. In case of discrepancies, the requirements in these Technical Specifications shall prevail.
1.3 CONTRACT METHOD
The WORK hereunder will be constructed under a single unit-price contract per each approved Work Authorization/Order/Supplement based in the Construction drawings.
1.4 WORK UNDER OTHER CONTRACTS
The following construction work is not included in this Contract, but may impact construction scheduling, testing, and startup:
Owner Description Palm Beach County Engineering &
Public Works Road Improvement Projects
Florida Department of transportation (FDOT) Road Improvement Projects
Obtain clarification from the OWNER in the case of a disagreement between the above list and those specified elsewhere in the Contract Documents.
Completion of the Work described in this Contract may impact the construction and testing of the items listed above.
1. Coordinate construction activities through the OWNER.
2. Pay claims for damages which result from the late completion of the Project or any specified Milestones.
1.5 WORK BY OTHERS
Where 2 or more contracts are being performed at one time on the same Site or adjacent land in such manner that work under one contract may interfere with work under another, the OWNER will determine the sequence and order of the Work in either or both contracts. When the Site of one contract is the necessary or convenient means of access for performance of work under another, the OWNER may grant privilege of access or other reasonable privilege to the CONTRACTOR so desiring, to the extent, amount, and in manner and at time that the OWNER may determine. No OWNER determination of method or time or sequence or order of the work or access privilege shall be the basis for a claim for delay or damage except under provisions of the General Conditions for temporary suspensions of the work. The CONTRACTOR shall conduct
REVISION DATE – 06/29/2023 PAGE 01 11 00 - 4
its operations so as to cause a minimum of interference with the work of such other CONTRACTOR’s, and shall cooperate fully with such CONTRACTOR’s to allow continued safe access to their respective portions of the Site, as required to perform work under their respective contracts.
Interference With Work On Utilities: The CONTRACTOR shall cooperate fully with all utility forces of the OWNER or forces of other public or private agencies engaged in the relocation, altering, or otherwise rearranging of any facilities which interfere with the progress of the WORK, and shall schedule the WORK so as to minimize interference with said relocation, altering, or other rearranging of facilities.
1.6 WORK SEQUENCE
The CONTRACTOR's attention is directed to the fact that during the period of time determined by the Engineer, no interruption in the flow can be accommodated, and the CONTRACTOR shall schedule its construction operations that no interference with the operation of the system will occur during this critical period.
Access to the site is limited to the hours of 7:00am to 3:00pm during weekdays.
Lift station rehabilitation work will proceed in an orderly fashion. The Contractor is responsible for preparing a complete and detailed schedule and work sequence plan prior to commencing any work (in accordance with Section 01-32-16) in the form acceptable to the Engineer/Owner. The schedule shall indicate a detailed breakdown of the work tasks to be performed, and how the work will proceed in order to achieve final completion of the work on or before the final time allotted as per each approved Work Authorization/Order/Supplement. This schedule shall be submitted to the Owner and Engineer for review
The OWNER may have other lift station projects ongoing through the project area. The CONTRACTORS work shall be sequenced and scheduled to allow no more than three (3) lift station to be on by-pass within a sanitary sub-catchment basin and/or Zone, as defined by the OWNER, at a single time during the construction of the project without prior written authorization from the OWNER or ENGINEER. The contractor's schedule will be reviewed at the pre-construction meeting and adjusted as necessary to meet the above requirement.
1.7 CONTRACTOR USE OF SITE
The CONTRACTOR's use of the Site shall be limited to its construction operations, including on-site storage of materials, on-site fabrication facilities, and field offices.
The CONTRACTOR shall not use any of the private properties or any portion of the Site until and authorization from the property owner is granted for any of its construction operations.
1.8 OUTAGE PLAN AND REQUESTS
Unless the Contract Documents indicate otherwise, the CONTRACTOR shall not remove from service, de-energize, or modify settings for any existing lift station, pipeline, valve, equipment, structure, road, or any other facility without permission from the ENGINEER.
REVISION DATE – 06/29/2023 PAGE 01 11 00 - 5
Where the WORK requires modifications to existing facilities or construction of new facilities and connection of new facilities to existing facilities, the CONTRACTOR shall submit a detailed outage plan and schedule for the ENGINEER'S approval a minimum of 2 weeks in advance of the time that such outage is planned.
The outage plan shall be coordinated with the construction schedule and shall meet the restrictions and conditions of the Contract Documents. The outage plan shall describe the CONTRACTOR's method for preventing bypassing of system; the length of time required to complete said operation; any necessary temporary power, controls, instrumentation or alarms required to maintain control, monitoring, and the manpower, and equipment which the CONTRACTOR will furnish for proper operation of associated system. All costs for preparing and implementing the outage plans shall be at no increase in cost to the OWNER.
The ENGINEER shall be notified in writing at least one week in advance of the required outage if the schedule for performing the work has changed or if revisions to the outage plan are required.
The CONTRACTOR shall provide written confirmation of the shutdown date and time 7 working days prior to the actual shutdown.
1.9 OWNER USE OF THE SITE AND OCCUPANCY
The OWNER may utilize all or part of the existing facilities during the entire period of construction for the conduct of the OWNER's normal operations. The CONTRACTOR shall cooperate and coordinate with the ENGINEER to facilitate the OWNER's operations and to minimize interference with the CONTRACTOR's operations at the same time. In any event, the OWNER shall be allowed access to the Site during the period of construction.
B. Testing of equipment and appurtenances including specified test periods, training, and startup does not constitute acceptance for operation.
C. OWNER may accept the facility for continued use after startup and testing at the option of the Owner. If acceptance is delayed at the option of the OWNER, shut down facilities per approved Operation and Maintenance procedures.
D. The execution of bonds indicates the consent of the surety to these provisions for occupancy of the structures and use of equipment.
E. Provide an endorsement from the insurance carrier permitting occupancy of the structures and use of equipment during the remaining period of construction.
F. Conduct operations to ensure the least inconvenience to the Owner and general public.
1.10 CONSTRUCTION OF UTILITIES
Utility companies or their CONTRACTOR’s will provide new or enhanced utilities for this Project.
Coordinate with others performing Work associated with this Project.
A. Power and Electrical Services:
REVISION DATE – 06/29/2023 PAGE 01 11 00 - 6
1. Pay for temporary power, including but not limited to construction cost, meter connection, fees and permits.
2. CONTRACTOR may use the permanent power source in lieu of temporary power source when permanent power is available at the Site.
a. Notify ENGINEER and OWNER to use the permanent power source.
b. Arrange with the power utility and pay the charges for connections and monthly charges for use of this power.
3. Pay for the power consumed until the Project has been accepted as substantially complete, unless noted otherwise.
4. The Contractor shall furnish and install the electric meter base, current transformers including cabinet (if required) in accordance with PBC Building Department standards and requirements.
5. The utility company is to provide the electric meter and shall install and connect upon notification of completed work by the CONTRACTOR.
6. Utility pole mounted transformer to be provided and installed to the new overhead lines by the utility company.
7. If required, the utility is to provide power cable from the secondary of the transformer to the weatherhead.
1.11 REQUIREMENTS OF OTHER AGENCIES
A. When performing Work on facilities owned by agencies other than OWNER, comply with all requirements of such agencies which are more restrictive than those specified herein.
1.12 PROTECTION OF EXISTING STRUCTURES
A. The CONTRACTOR shall assume full responsibility for the protection of all existing buildings, structures, poles, signs, services to buildings, hydrants, drains, duct banks and electric and telephone cables, whether or not they are shown on the Drawings. The CONTRACTOR shall carefully support and protect all such structures and utilities from injury of any kind. Any damage resulting from the CONTRACTOR’s operations shall be repaired by the CONTRACTOR at CONTRACTOR’s expense.
B. Protection and temporary removal and replacement of existing structures as described in this Section shall be a part of the Work under the Contract and all costs in connection therewith shall be included in the Unit Bid Price.
PART 2 -- PRODUCTS (NOT USED)
PART 3 -- EXECUTION (NOT USED)
END OF SECTION
PBCWUD 26-041 WORK RESTRICTIONS
REVISION DATE – 03/31/2017 PAGE 01 14 00- 1
SECTION 01 14 00– WORK RESTRICTIONS
PART 1 -- GENERAL
1.1 THE SUMMARY
A. WORK shall be scheduled, sequenced, and performed in a manner which minimizes disruption to the public and to the operation and maintenance of existing facilities along the pipeline alignment.
B. The CONTRACTOR shall incorporate the construction and schedule constraints of this Section in preparing the construction schedules required under Section 01 32 16 – Construction Progress Schedule.
1.2 EXISTING WASTEWATER PUMP STATIONS
A. The WORK shall be executed while the existing wastewater pump stations are in operation. Operation of the existing wastewater pump stations shall not be jeopardized nor shall the efficiency of wastewater pump stations be reduced as a result of the execution of the WORK.
B. Unless indicated otherwise, temporary pumping, piping, power, lighting, controls, instrumentation, alarms, security devices, and safety devices shall be provided by the CONTRACTOR whenever its activity or interruption due to its activity affects the existing facility.
C. The construction constraints in this Section do not include every item affecting the completion of the WORK, but are intended to describe the sequence of critical events necessary to minimize disruption to the ongoing utility system and to ensure compliance with all Federal, State and County Permit requirements. It shall be understood and agreed by the CONTRACTOR that the critical events described are not inclusive and that additional items of WORK not included may be required to minimize disruption and ensure compliance. Deviation from or modification of these suggested sequences is permitted if techniques and methods known to the CONTRACTOR will result in reducing disruption to the facility operation and maintaining treatment efficiency, and if deviation is approved in advance by the ENGINEER.
1.3 OPERATION OF PLANT EQUIPMENT
A. Operational functions or shutdown of the existing system required to facilitate CONTRACTOR's operation will be done by the OWNER's personnel only.
B. The system operation and maintenance personnel will cooperate in every way that is practical in order to facilitate CONTRACTOR's operation. However, certain shutdown and connections may only be permissible at times other than normal working hours such as nights or weekends. No additional payment will be made to the CONTRACTOR for any night, weekend, or holiday premium or overtime payments.
C. If it becomes necessary for the proper operation or maintenance of portions of the system, the OWNER may require the CONTRACTOR to reschedule an approved shutdown. The CONTRACTOR shall then reschedule its operations so there shall be no conflict with
REVISION DATE – 03/31/2017 PAGE 01 14 00- 2
necessary operations or maintenance of the system. The CONTRACTOR shall, within 2 Days, furnish the ENGINEER a revised outage request and a plan for rescheduling the shutdown in accordance with the requirements of the construction schedule.
1.4 BYPASSING
A. Bypassing of untreated or partially treated sewage to surface waters or drainage courses is prohibited during construction. In the event accidental bypassing is caused by the CONTRACTOR's operations, the OWNER shall immediately be entitled to employ others to stop the bypassing and costs incurred therefore will be deducted from the CONTRACTOR's construction progress payments.
1.5 COMPLIANCE WITH NPDES PERMIT
A. If applicable, the NPDES permit specifies the water quality limits that the plant must meet prior to discharging its effluent. A copy of the NPDES permit shall be available at the site by the CONTRACTOR. In scheduling and performing the WORK, the CONTRACTOR shall not, directly or indirectly, prevent the piping system from achieving the discharge requirements. Penalties imposed on the OWNER as a result of any discharge violation caused by the actions of the CONTRACTOR or its employees, or subcontractors shall be borne in full by the CONTRACTOR, including fines, legal fees, and other expenses to the OWNER resulting directly or indirectly from such discharge violations. The OWNER may recover such sums by deductions from the construction progress payments.
B. The CONTRACTOR shall take necessary precautions to ensure that no damage occurs to the OWNER’S facilities, including piping, utilities, roads, and structures, that are to remain in operation and are not to be modified or replaced, in accordance with Section 01 76 10 – Protection of Existing Facilities. Any temporary facilities, materials, equipment, and labor required for the project to continue to meet the terms of the NPDES permit during construction shall be provided by the CONTRACTOR as part of the WORK. At the completion of work, such temporary facilities, materials, and equipment shall be removed from the Site as part of the WORK.
1.6 OUTAGE REQUESTS
A. Modifications to existing facilities, the construction of new facilities, and the connection of new to existing facilities may require the temporary outage or bypass of existing facilities.
In such cases, the CONTRACTOR shall coordinate WORK with the ENGINEER as described below. The CONTRACTOR shall submit a detailed outage plan and time schedule for construction activities which will make it necessary to remove a tank, pipeline, channel, electrical circuit, equipment, structure, road, or other facilities from service.
B. The outage plans shall be submitted to the ENGINEER for acceptance a minimum of 2 weeks in advance of the time that such outages are required. The outage plans shall be coordinated with the construction schedule and shall meet the restrictions and conditions of this Section. The outage plan shall describe the CONTRACTOR's method for preventing bypassing of pump station; the length of time required to complete the operation; any necessary temporary power, controls, instrumentation, or alarms required to maintain control, monitoring, and alarms for the utility system; and the manpower and equipment which the CONTRACTOR shall provide in order to ensure proper operation of
REVISION DATE – 03/31/2017 PAGE 01 14 00- 3
associated utility system. Costs for preparing and implementing the outage plans shall be the responsibility of the CONTRACTOR as part of the WORK.
C. The CONTRACTOR shall not begin any alteration affecting existing facilities until specific written approval has been granted by the ENGINEER in each case.
D. The ENGINEER will coordinate the CONTRACTOR's planned procedure with the Maintenance and Operation personnel. The ENGINEER has the authority to modify any proposed shutdown procedures if such procedures would adversely impact the utility system operation.
E. The ENGINEER shall be notified in writing at least one week in advance of the required outage if the schedule for performing the WORK has changed or if revisions to the outage plan are required. The CONTRACTOR shall provide written confirmation of the shutdown date and time 2 Days prior to the actual shutdown.
1.7 TEMPORARY CONNECTIONS
A. Making connections to existing facilities or other operations that interfere with the operation of the existing equipment shall be thoroughly planned in advance, and required equipment, materials, and labor shall be on hand at the time of undertaking the connections. WORK shall be completed as quickly as possible and with as little delay as possible and shall proceed continuously (24 hours a day and seven days a week) if necessary to complete modifications and/or connections in the minimum time.
B. The cost of any temporary facilities and night, weekend, or holiday activity and overtime payments required during process interruptions shall be included in the WORK.
C. Temporary facilities and piping shall be located to minimize interference with CONTRACTOR's construction facilities and OWNER's operation and maintenance of the utility system. Unless otherwise indicated, each temporary pipeline shall be of the same size as its connection to the existing or permanent facility at the downstream end of the pipeline. Piping materials shall be suitable for the material being conveyed and be as required in the Contract Specifications.
D. When temporary electrical power, controls, instrumentation, or alarms are required for routine continuous operations of existing or new equipment, the CONTRACTOR shall provide the necessary equipment and appurtenances. Prior to installing said equipment and appurtenances, CONTRACTOR shall furnish a submittal on the proposed components and installation for ENGINEER's review and approval.
E. A plan showing the size and location of the temporary facilities and piping shall be submitted to the ENGINEER at the same time as the outage plan required under this Section. Costs for design, provision, operation, and removal of temporary facilities and piping shall be part of the WORK.
1.8 CONSTRUCTION SEQUENCING
A. Construction activities shall be scheduled and sequenced to ensure continuous operation of the existing utility system. The CONTRACTOR's scheduling shall develop construction sequencing so that the WORK will not adversely impact the utility system. The
REVISION DATE – 03/31/2017 PAGE 01 14 00- 4
CONTRACTOR shall be responsible for development of the construction sequencing. In implementing the construction sequencing, the CONTRACTOR shall maintain the existing facilities in service until new facilities are constructed and are operational to supplement the existing capacity. When new facilities are operational, the existing facilities may be taken out of service. The following general guidelines shall be used by the CONTRACTOR in planning the sequence of construction.
1. Safe working conditions for personnel shall be maintained during rehabilitation, modification, and demolition WORK. The foregoing includes at least proper trench excavation, the provision of temporary equipment guards, supports, warning signs, walkways, covers over openings, handrailing, and protection of electrical equipment and power supply.
2. Temporary facilities shall be constructed in accordance with applicable codes and regulations to operate safely and properly.
3. Valves to be temporarily shut off during the WORK shall be tagged as such.
4. Electrical and mechanical equipment shall be similarly shut down.
1.9 PERMITS
A. The CONTRACTOR shall abide by the conditions of permits and shall obtain proof of satisfaction of conditions from issuers of permits prior to acceptance of the WORK by the
OWNER.
B. Conditions affecting the CONTRACTOR are found in the applicable permits. Copies of permit conditions are attached at the end of this Section.
1.10 SEQUENCE AND SCHEDULE CONSTRAINTS
A. General: It is the CONTRACTOR's responsibility to coordinate and plan the construction activities to integrate each schedule constraint into performance of the overall WORK.
B. The listing of sequence and schedule constraints below does not mean that every constraint or special condition has been identified. The list does not substitute for the CONTRACTOR's coordination and planning for completion of the WORK within the Contract Times.
C. The following constraints affect the construction sequence and schedule.
1. Schools normal operations
2. Church normal operations
3. Crop Harvesting Season.
4. Access to Hospitals and Fire Stations,
1.11 PRODUCTS (NOT USED)
PART 2 -- EXECUTION (NOT USED)
REVISION DATE – 03/31/2017 PAGE 01 14 00- 5
PBCWUD 26-041 ACCESS TO SITE
REVISION DATE – 03/31/2017 PAGE 01 14 13- 1
SECTION 01 14 13– ACCESS TO SITE
PART 1 -- GENERAL
1.1 THE SUMMARY
A. The CONTRACTOR shall provide safe access to the project site with minimal disruption to vehicular and pedestrian traffic.
B. Related sections:
1. Section 01 11 00 – Summary of Work
2. Section 01 66 00 – Product Storage and Handling Requirements
1.2 CONTRACTOR SUBMITTALS
A. The CONTRACTOR shall submit 3 copies of a traffic control plan to the appropriate permitting entity for approval a minimum of 6 weeks prior to construction. The appropriate permitting shall be allowed access to observe these traffic control plans in use and to make any changes as field conditions warrant. Any changes required by the appropriate permitting shall supersede these plans and be done solely at the CONTRACTOR's expense.
1.3 HIGHWAY LIMITATIONS
A. The CONTRACTOR shall make its own investigation of the condition of available public and private roads and of clearances, restrictions, bridge load limits, and other limitations affecting transportation and ingress and egress to the site of the WORK. It shall be the CONTRACTOR's responsibility to construct and maintain any haul roads required for its construction operations.
1.4 TEMPORARY CROSSINGS
A. General:
1. Continuous, unobstructed, safe, and adequate pedestrian and vehicular access shall be provided to fire hydrants, commercial and industrial establishments, churches, schools, parking lots, service stations, motels, fire and police stations, and hospitals.
2. Safe and adequate public transportation stops and pedestrian crossings at intervals not exceeding 300-feet shall be provided.
3. The CONTRACTOR shall cooperate with parties involved in the delivery of mail and removal of trash and garbage so as to maintain existing schedules for such services.
4. Vehicular access to residential driveways shall be maintained to the property line except when necessary construction precludes such access for reasonable periods of time.
B. Temporary Bridges:
1. Wherever necessary, to maintain vehicular crossings, the CONTRACTOR shall provide suitable temporary bridges or steel plates over unfilled excavations, except in
REVISION DATE – 03/31/2017 PAGE 01 14 13- 2
such cases as the CONTRACTOR shall secure the written consent of the responsible individuals or authorities to omit such temporary bridges or steel plates, which written consent shall be delivered to the ENGINEER prior to excavation.
2. Such bridges or steel plates shall be maintained in service until access is provided across the backfilled excavation.
3. Temporary bridges or steel plates for street and highway crossing shall conform to the requirements of the authority having jurisdiction in each case, and the CONTRACTOR shall adopt designs furnished by said authority for such bridges or steel plates, or shall submit designs to said authority for approval, as may be required.
C. Street Use:
1. Nothing herein shall be construed to entitle the CONTRACTOR to the exclusive use of any public street, alleyway, or parking area during the performance of the WORK hereunder, and it shall conduct its operations to not interfere unnecessarily with the authorized work of utility companies or other agencies in such streets, alleyways, or parking areas.
2. No street shall be closed to the public without first obtaining permission of the ENGINEER and proper governmental authority.
3. Where excavation is being performed in primary streets or highways, one lane in each direction shall be kept open to traffic at all times unless otherwise indicated.
4. Toe boards shall be provided to retain excavated material if required by the ENGINEER or the agency having jurisdiction over the street or highway.
5. Fire hydrants on or adjacent to the WORK shall be kept accessible to fire-fighting equipment.
6. Temporary provisions shall be made by the CONTRACTOR to assure the use of sidewalks and the proper functioning of gutters, storm drain inlets, and other drainage facilities
D. Safety:
1. The CONTRACTOR shall take necessary precautions for the protection of the WORK and the safety of the public.
2. All signs, signals, and barricades shall conform to the requirements of Subpart G, Part 1926, of the OSHA Safety and Health Standards for Construction.
E. Traffic Control:
1. For the protection of traffic in public or private streets and ways, the CONTRACTOR shall provide, place, and maintain necessary barricades, traffic cones, warning signs, lights, and other safety devices in accordance with the requirements of the "Manual on Uniform Traffic Control Devices," published by American Association of State Highway and Transportation Officials (AASHTO MUTCD-10) and other authorities having jurisdiction over the street or highway.
REVISION DATE – 03/31/2017 PAGE 01 14 13- 3
2. The CONTRACTOR shall take necessary precautions for the protection of the WORK and the safety of the public. Barricades and obstructions shall be illuminated at night, and lights shall be kept burning from sunset until sunrise.
3. The CONTRACTOR shall station such guards or flaggers and shall conform to such special safety regulations relating to traffic control as may be required by the public authorities within their respective jurisdictions.
4. Signs, signals, and barricades shall conform to the requirements of Subpart G, Part 1926, of the OSHA Safety and Health Standards for Construction.
5. The CONTRACTOR shall remove traffic control devices when no longer needed, repair damage caused by installation of the devices, and shall remove post settings and backfill the resulting holes to match grade.
F. Temporary Street Closure:
1. If closure of any street is required during construction, the CONTRACTOR shall apply in writing to the City Engineer and any other jurisdictional agencies at least 30 Days in advance of the required closure. A Detour and Traffic Control Plan shall accompany the application.
G. Temporary Driveway Closure:
1. The CONTRACTOR shall notify the owner or occupant (if not owner-occupied) of the closure of the driveways to be closed more than one 8 hour work day at least 3 working days prior to the closure.
2. The CONTRACTOR shall minimize the inconvenience and minimize the time period that the driveways will be closed. The CONTRACTOR shall fully explain to the owner/occupant how long the closure will take and when closure will start.
1.5 PARKING
A. The CONTRACTOR shall:
1. Provide temporary parking areas as follows:
2 spaces for the OWNER
1 spaces for the ENGINEER
1 spaces designated for the handicapped
2. When space on the Site is not available, the CONTRACTOR shall make 2 additional spaces available for the OWNER's use.
3. The CONTRACTOR shall direct its employees to park in areas indicated and/or requested by the ENGINEER.
4. Traffic and parking areas shall be maintained in a sound condition, free of excavated material, construction equipment, mud, and construction materials. The CONTRACTOR shall repair breaks, potholes, low areas which collect standing water, and other deficiencies.
REVISION DATE – 03/31/2017 PAGE 01 14 13- 4
1.6 SECURITY PROGRAM
A. The CONTRACTOR shall:
1. Protect WORK, existing premises, and OWNER'S operations from theft, vandalism, and unauthorized entry.
2. Initiate program in coordination with OWNER'S existing security system at mobilization.
3. Maintain program throughout construction period until OWNER'S occupancy/acceptace
1.7 ENTRY CONTROL
A. The CONTRACTOR shall:
1. Restrict entry of persons and vehicles into Site and existing facilities.
2. Allow entry only to authorized persons with proper identification.
3. If required, maintain log of workmen and visitors and make log available to OWNER on request.
4. Coordinate access of OWNER'S personnel to Site in coordination with OWNER'S security forces.
B. The CONTRACTOR shall control the entrance of persons and vehicles to those related to the OWNER'S operations.
1.8 PERSONNEL IDENTIFICATION
A. The CONTRACTOR shall:
1. Provide identification card to each person authorized to enter premises.
2. Maintain a list of authorized persons and submit copy to OWNER on request.
3. Require return of cards.
B. Card shall include personal photograph, name and assigned number, expiration date]]] and employer identification number
1.9 SECURITY SERVICE
A. The CONTRACTOR shall:
1. If required, engage a service to furnish a uniformed guard at the Site during non-working hours, 24 hours a day, 7 days a week or during construction hours.
2. If required, engage a patrol service to provide uniformed surveillance of Site on a 4 hour basis, during non-working hours, 24 hours a day, 7 days a week, or other time requirements.
REVISION DATE – 03/31/2017 PAGE 01 14 13- 5
1.10 RESTRICTIONS
A. The CONTRACTOR shall not allow cameras on site or photographs taken except by written approval of OWNER.
PART 2 -- PRODUCTS (NOT USED)
PBCWUD PRICE AND PAYMENT PROCEDURES
REVISION DATE 06/29/2023 PAGE 01 20 00- 1
SECTION 01 20 00– PRICE AND PAYMENT PROCEDURES
PART 1 -- GENERAL
1.1 THE SUMMARY
A. Submit Applications for Payment to the Owner in accordance with the schedule established by the General Conditions of the Contract Documents.
B. The Contract Price is to include costs for:
1. All home office overhead costs and expenses, including profit made directly or indirectly for the Project;
2. Project management, contract administration, field office and field operations staff, including supervision, clerical support, and technology system support;
3. Professional services including design fees, legal fees, and other professional services;
4. Bonds and insurance;
5. Permits, licenses, patent fees, and royalties;
6. Taxes;
7. Providing all documentation and submittals required by the Contract Documents;
8. Facilities and equipment at the Site including:
a. Field offices, office furnishings, and all related office supplies, software, and equipment,
b. Storage facilities for CONTRACTOR’s use, storage facilities for stored materials and equipment, including spare parts storage,
c. Shops, physical plant, construction equipment, small tools, vehicles, technology, and telecommunications equipment,
d. Safety equipment and facilities to provide safe access and working conditions for workers and for others working at the Site,
e. Temporary facilities for power and communications,
f. Potable water and sanitation facilities, and
g. Mobilization and demobilization for all of these facilities and equipment;
9. Products, materials, and equipment stored at the Site or other suitable location;
10. Products, materials, and equipment permanently incorporated into the Project;
REVISION DATE 06/29/2023 PAGE 01 20 00- 2
11. Temporary facilities for managing water, including facilities for pumping, storage, and treatment as required for construction and protection of the environment;
12. Temporary facilities for managing environmental conditions and Constituents of Concern;
13. Temporary facilities such as storage facilities, working areas, and other facilities required for construction of the Project;
14. Temporary and permanent facilities for protection of all overhead, surface, or underground structures or features;
15. Temporary and permanent facilities for removal, relocation, or replacement of any overhead, surface, or underground structures or features;
16. Products, materials, and equipment consumed during the construction of the Project;
17. CONTRACTOR labor and supervision to complete the Project, including that provided through Subcontractors or Suppliers;
18. Correcting Defective Work during the Contract Times, during the Correction Period, or as required to meet any warranty provision of the Contract Documents;
19. Risk associated with weather and environmental conditions, startup, and initial operation of facilities including equipment, processes, and systems;
20. Maintenance of facilities, including equipment, processes, and systems until operation is transferred to OWNER;
21. Providing warranties, extended or special warranties, or extended service agreements;
22. Cleanup and disposal of any and all surplus materials; and
23. Demobilization of all physical, temporary facilities not incorporated into the Project.
C. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price.
D. Submit Payment Application for completed Work and for materials and equipment in accordance with the Contract Documents.
E. Related Sections:
1. Agreement / Work Authorization/Order between the OWNER and the
CONTRACTOR.
2. General Conditions of the Contract Documents
3. Section 01 26 63 – Change Orders
4. Section 01 29 00 – Measurement and Payment
REVISION DATE 06/29/2023 PAGE 01 20 00- 3
5. Section 01 32 16 – Construction Progress Schedule
1.2 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. Section 01 29 73 – Schedule of Values
B. Section 01 77 00 – Closeout Procedures
1.3 FORMAT AND DATA REQUIRED
A. Submit applications on the form required by and provided by the OWNER, with itemized data typed on 8-1/2 inch X 11-inch white paper continuation sheets, and Excel computer file.
B. Provide itemized data on continuation sheets:
1. Format, schedules, line items and values: Those of the Schedule of Values accepted by the OWNER, Section 01 29 73 – Schedule of Values.
1.4 CONTRACTOR SUBMITTALS
A. Submit a schedule of the anticipated Payment Applications showing the application numbers, submission dates, and the anticipated amount to be requested.
B. Update the schedule of anticipated payments as necessary to provide a reasonably accurate indication of the funds required to make payments each month to the CONTRACTOR for Work performed.
1.5 PROCEDURES FOR SUBMITTING A PAYMENT APPLICATION
A. Submit a draft Payment Application to the OWNER at the end of the payment period as established in the Agreement / Work Authorization/Order. Review the draft Payment Application with the OWNER to determine concurrence with:
1. The earned value for each lump sum item including the value of properly stored and documented materials and equipment for each item in the original Contract;
2. The quantity of Work completed for each unit price item;
3. Values requested for materials and equipment consistent with invoices for materials and equipment; and
B. Submit Payment Applications as a Working File. Do not leave any cells empty or incomplete. If information is not applicable, enter NA in the space provided.
1. Number each application sequentially and include the dates for the application period.
2. Show the total amounts for Earned Value of Original Contract Performed, Earned Value for Work on Approved Contract Modifications, and Net Set-offs. Show total amounts that correspond to totals indicated on the attached tabulation for each.
REVISION DATE 06/29/2023 PAGE 01 20 00- 4
Execute the Certification with the signature of a responsible officer of the CONTRACTOR’s firm. The Certification shall state that “all Work, including materials, covered by this Application for Payment has been completed or delivered and stored in accordance with the Contract Documents, that all amounts have been paid for Work, materials, and equipment for which previous payment has been made by the OWNER, and that the current payment amount shown in this Payment Application is now due.”
1.6 SUBSTANTIATING DATA FOR PROGRESS PAYMENTS
A. The CONTRACTOR shall submit suitable information, with a cover letter identifying:
1. Project Name.
2. Application number, date and period of coverage.
3. Detailed list of enclosures.
4. For stored products:
a. Item number and identification as shown on the application.
b. Description of specific material.
5. Submit updated Construction Schedule.
6. Provide record drawings for piping installation within the payment period.
B. Submit one (1) copy of data with each original application.
1.7 PREPARATION OF APPLICATION FOR FINAL PAYMENT
A. Fill in Application form as specified for progress payments.
B. Use continuation sheet for presenting the final statement of accounting.
C. Final payment requires additional procedures and documentation per Section 01 77 00 Closeout Procedures.
D. The final Payment Application is to incorporate adjustments to the Contract Price including those for:
1. Adjustments of estimated quantities to actual quantities;
2. Approved Change Orders;
3. Allowances not previously adjusted by Change Order;
4. Deductions for Defective Work that has been accepted by the OWNER;
5. Penalties and bonuses;
REVISION DATE 06/29/2023 PAGE 01 20 00- 5
6. Deductions for liquidated damages;
7. Deduction for all final Set-offs; and
8. Other adjustments if needed.
1.8 SUBMITTAL PROCEDURE
A. Submit Applications for Payment to the OWNER at the times stipulated.
B. Submit not less than three (3) originals of each Application.
C. When the OWNER finds the Application to be properly completed and correct, it will be processed for payment.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION (NOT USED)
PBCWUD 26-041 ALLOWANCES
REVISION DATE – 03/31/2017 PAGE 01 21 00 - 1
SECTION 01 21 00 – ALLOWANCES
PART 1 -- GENERAL
1.1 THE SUMMARY
A. Include in the Contract Sum all allowances stated in the Contract Documents.
B. Designate in the Schedule of Values the amount of each Allocation approved by the
OWNER.
1.2 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. General Conditions of the Contract Documents.
B. Section 01 20 00 – Price and Payment Procedures
C. Section 01 26 63 – Change Orders
D. Section 01 32 16 – Construction Progress Schedule
E. Section 01 32 36 – Video Monitoring and Documentation
1.3 CONTRACT ALLOWANCES
A. Include in the Contract the following lump sum allowances:
1. OWNER’s Allowance: Lump sum amount not to exceed $25,000.00 net
2. Utility Relocation Allowance: Lump sum amount not to exceed $20,000.00
B. Do not include any additional amounts for installation, overhead or profit in the Contract Sum. Change Orders will include such additional amounts as provided in the General Conditions of the Contract Documents.
C. The CONTRACTOR shall make arrangements for all testing services required. The costs of testing services shall be paid by the CONTRACTOR.
D. The CONTRACTOR shall pay the entire cost of all re-testing and of all additional or supplemental testing that is required or requested by the OWNER.
E. At the close-out of the Contract, monies remaining in the Allowances will be credited to the OWNER in the Final Adjusting Change Order.
1.4 ADJUSTMENT OF COSTS
A. Should the net cost be more or less than the specified amount of the Allowance, the Contract Sum will be adjusted accordingly by Change Order.
B. Submit any claims for anticipated additional costs at the site or other expenses caused by the selection under the Allowance, prior to execution of the Work.
PBCWUD 26-041 ALLOWANCES
REVISION DATE – 03/31/2017 PAGE 01 21 00 - 2
C. Failure to submit claims within the designated time will constitute a waiver of claims for additional costs.
D. At contract close-out, reflect all approved changes in Contract Amounts in the final statement of accounting.
PART 2 -- PRODUCTS (NOT USED)
PBCWUD 26-041 PRODUCT SUBSTITUTION PROCEDURES
REVISION DATE 03/31/2017 PAGE 01 25 13- 1
SECTION 01 25 13 – PRODUCT SUBSTITUTION PROCEDURES
PART 1 -- GENERAL
1.1 THE SUMMARY
A. Section Includes:
1. Furnish and install products specified, under options and conditions for substitutions stated in this Section.
B. Related sections:
1. Section 01 60 00 – Product Requirements
2. Section 01 77 00 – Closeout Procedures
1.2 CONTRACTOR SUBMITTALS
A. Products List:
1. Within thirty days after Award of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .