About this opportunity
The Douglasville-Douglas County Water and Sewer Authority issued an Invitation for Bids (IFB #309) for the Bear Creek Water Treatment Plant High Service Pump Addition project, a capital construction procurement managed by Douglas County, Georgia. The project scope requires contractors to furnish all materials, equipment, and labor to install an additional 2,500 horsepower high service pump within the existing high service pump station building and to install a variable speed drive and control panel in the existing electrical building. Deliverables include installation of new 48-inch diameter discharge piping and associated valves, a 24-inch diameter pump ball check valve, wiring, conduit, and SCADA control instrumentation for the new pump system. Contractors must hold a valid State of Georgia Utility Contractors License, with the license number displayed on the sealed bid envelope. A non-mandatory prebid conference will be held on Wednesday, February 11, 2026, at 10:00 a.m. at the Authority's Administrative Offices, located at 8763 Hospital Drive, Douglasville, Georgia 30134. Sealed bids must be received by 2:00 p.m. local time on Wednesday, February 25, 2026, at the same address, with no late submissions accepted. Bids cannot be withdrawn for a minimum of 60 days after the closing time, except as permitted under state law.
The documentation provided does not specify any set-aside designations for disadvantaged enterprises, small businesses, or other protected classifications. No incumbent vendors or current contractors are identified in the available materials. The Authority has already procured the 2,500 horsepower high service pump and related equipment, indicating that the contractor's primary responsibility involves installation and integration of this existing infrastructure with the facility's current systems and controls. No contract award value, budget range, or estimated project cost is disclosed in the Invitation for Bids documentation. The contract term, final award date, and any other financial or scheduling terms remain unavailable in the posted materials.
Opportunity text
INVITATION FOR BIDS DOUGLASVILLE-DOUGLAS COUNTY WATER AND SEWER AUTHORITY BEAR CREEK WATER PLANT HIGH SERVICE PUMP ADDITION 1B #309 Sealed Bids will be received by the Authority at its Administrative Offices located at 8763 Hospital Drive, Douglasville, Georgia 30134 until the date and time listed below for the project titled BEAR CREEK WATER TREATMENT PLANT HIGH SERVICE PUMP ADDITION. Bids shall be sealed and mailed or delivered to the Authority so that they are received no later than the date and time listed below. Bids received after this time will not be accepted. Bids shall be received by 2:00 local time, on Wednesday February 25, 2026. A non¿mandatory pre¿bid conference will be held at the Authority' s Administrative Offices located at 8763 Hospital Drive, Douglasville, Georgia 30134 on the date and time listed below. Non-Mandatory Pre¿Bid Conference shall be at 10:00 am local time on Wednesday, February 11, 2026. Contractor shall hold a Utility Contractors License . The appropriate State of Georgia Utility Contractors License Number should appear on the face of the sealed bid envelope . Sealed bids will be accepted at the Authority prior to the bid opening, but no bid may be withdrawn after scheduled closing time for the period of at least 60 days, except as allowed by state law. The work to be accomplished consists of furnishing all materials, equipment, personnel, plus perform all the necessary labor to construct a complete and functioning project as follows : This project will consist of Contractor installing an additional 2500 hp High Service Pump in the existing High Service Pump Station Building and installing a High Service Pump Variable Speed Drive and Control Panel in the existing Electrical Building. This project includes installing New Pump 48" diameter Discharge Piping and Valves, 24" diameter Pump Ball Check Valve, wiring and conduit for providing power and instrumentation SCADA Controls . The Authority purchased: (1) the 2500 hp High Service V
Files
| File | Type | Posted |
|---|---|---|
| IFB_309 Ad_ Bear Creek Water Treatment Plant .pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity