About this file

This is an Invitation for Bids (IFB) issued by the Douglasville-Douglas County Water and Sewer Authority for the Bear Creek Water Treatment Plant High Service Pump Addition project (IFB #309). The project involves furnishing all materials, equipment, and labor to install an additional 2,500 horsepower high service pump in the existing high service pump station building, along with a variable speed drive and control panel in the existing electrical building. Work includes installation of new 48-inch diameter discharge piping and valves, a 24-inch diameter pump ball check valve, wiring, conduit, and SCADA control instrumentation. A non-mandatory prebid conference will be held on Wednesday, February 11, 2026, at 10:00 a.m. at the Authority's Administrative Offices located at 8763 Hospital Drive, Douglasville, Georgia 30134. Sealed bids must be received by 2:00 p.m. local time on Wednesday, February 25, 2026, at the same location. Bids received after the deadline will not be accepted. Bidders may not withdraw bids after the scheduled closing time for at least 60 days, except as allowed by state law.

Contractors must hold a valid State of Georgia Utility Contractors License, with the license number appearing on the face of the sealed bid envelope. The Authority has already purchased the 2,500 horsepower high service pump and related equipment. No pricing terms, set-asides, award dates, or contract term information is provided in the available documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .