EV Charging Station Installation and EV Purchase Phase I

Closed State & local contract opportunity Posted

Solicitation number
2026-09
State
California
Responses due

Opportunity facts

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The State of California is requesting bids for the 2026 Guardrail Replacement Project (C2615) at various locations in Nevada County and Torrance City, with bids due May 27, 2026.

The scope involves replacement of existing guardrails with either new Midwest guardrail systems or concrete barrier rail, selected based on site-specific requirements. The solicitation mandates site visits and a bidders' conference or pre-bid meeting for contractors to address questions.

The bid notice establishes pricing terms, evaluation criteria, and contractual conditions for the selection process and project performance. The documentation addresses bonding requirements, insurance specifications, and other terms necessary for bid preparation. Details regarding small business set-asides, incumbent contractor information, funding sources, contract duration, and any renewal or extension options are contained in the attached bid notice file.

Opportunity text

4 versions

Update #4 · Latest ·

The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the contract documents. The work to be performed includes the following activities for this contract: Furnishing and installing an EV Charging station, installation of a switchgear, installation of electrical transformer, trenching and installation of 2 electrical conduit, backfilling and compacting of the trench, restoration of the A.C. where the conduit is installed, installation of 60x40 P.C.C. pads for the switchgear and the EV Charging station, electrical improvements, thermoplastic striping for the parking and traffic control around the construction zones. All work to be completed within existing City of Imperial public right of way and property. The scope of work includes, prior to the start of construction, the coordination between the City of Imperial and the Contractor. The Contractor will be responsible for all quality control (QC) testing necessary to verify that its materials and workmanship comply with the Contract Documents. Contractor performed QC testing shall not replace or limit the Citys right to conduct independent QA, acceptance, or independent assurance testing.

Update #3 ·

Scope of Services: This Project will include the installation of up to 50 flow monitors in manholes throughout the Citys wastewater collection system. Approximately 42 of these locations are predetermined and will utilize the same locations used in the previous 2014/15 flow monitoring Project. Up to eight (8) additional preferred manhole locations have been identified and will need to be inspected; these preferred manholes are provided ahead of time. The flow monitoring/data collection phase is expected to last approximately four (4) months through the winter and spring of 2027. The entire Project duration including data analysis and all deliverables is expected to last approximately one (1) year and will require some coordination with a Wastewater Master Plan consultant to be hired by end of 2027 for transfer of data and response to questions on data. This Project will capture wet and dry weather flows and is critical information for our operations, the Wastewater Master Plan, and future utility planning for Citys expanded General Plan Update.

Update #2 ·

Victor Valley Transit Authority, located at 17150 Smoke Tree St, Hesperia, CA 92345, requires the provision and installation of Six (6) level 2 electric vehicle (EV) chargers along with the ability to monitor power use via meter or application/software. The EV Chargers will be located in the parking lot north of the VVTA Administration building, adjacent to VVTAs existing level 2 EV chargers. The Project will be a start to finish design-build project. VVTA does not currently have any of the designs, which will be the responsibility of the selected Proposer.

Update #1 ·

Project Description: Replacement of existing guardrail at various locations with either new midwest guardrail or concrete barrier rail.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity