The New Hampshire Department of Natural and Cultural Resources, Division of Parks and Recreation is seeking a contractor for the 2025 Cannon Mountain Snowbase Drainline Replacement project located in Grafton County. The Request for Bid (RFB) 2026-03 requires a vendor to replace the existing drain and cooling system infrastructure at the Cannon Mountain Ski Area, with all work to be completed prior to the start of the snowmaking season in October 2025. Specific project deliverables include replacing a 4" Schedule 40 drain line from valves to building exit, installing a 6" Schedule 40 cooling line from the pump room flange, removing old pipes, reinstalling grates, painting pipes to original colors, and reusing existing valves with new gaskets and bolts. The bid closing date is July 15, 2025 at 2:00 PM EST, with a target contract completion date of October 1, 2025. All work must be performed between 7:00 AM and 4:00 PM, with the vendor responsible for providing all necessary materials, labor, and equipment to complete the project. Vendors must be registered with the NH Bureau of Purchase and Property and have a completed Vendor Application Package. Corporations or limited liability companies must also be registered with the NH Secretary of State. Insurance requirements include comprehensive general liability coverage of $1,000,000 per occurrence and $2,000,000 aggregate, along with workers' compensation insurance as mandated by state law. The project has a fixed budget that cannot be exceeded without prior approval from Cannon Mountain management. While no specific set-aside designations were mentioned, the procurement appears to be open to qualified vendors who can meet the technical specifications and insurance requirements. The project involves infrastructure replacement at an existing ski area facility, suggesting potential integration with current mechanical and drainage systems. Though a specific contract value was not explicitly stated, the scope of work implies a moderate-sized infrastructure improvement project focused on upgrading critical ski area utility infrastructure.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
attachment_1_RFB DNCR 2026-03.pdf | 175KB | 7/2/25 | ||
RFB DNCR 2026-03.pdf | 387KB | 7/2/25 |