2025-2029 Quarton Lake Maintenance Dredging #15-24(M)

Closed State & local contract opportunity Posted

Solicitation number
15-24(M)
State
Michigan
Responses due

Opportunity facts

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

The City of Birmingham is soliciting sealed proposals for the 2025-2029 Quarton Lake Maintenance Dredging project, a comprehensive hydraulic dredging and environmental restoration initiative located in Oakland County, Michigan. The procurement seeks a qualified contractor to perform annual hydraulic dredging and dewatering of approximately 380 cubic yards, with disposal of approximately 190 cubic yards of accumulated sediment from Quarton Lake over a five-year period. Key project deliverables include soil erosion control measures such as turbidity curtains, catch basin inserts, silt fence, and straw blanket installations, along with comprehensive site restoration. Bidding documents will be available electronically through the Michigan Inter-governmental Trade Network (MITN) starting February 20, 2025, with an optional pre-bid meeting scheduled for March 4, 2024, at the northeast corner of Oak Avenue and Lake Park Drive. All questions are due by 10:00 am on March 6, 2025, and sealed proposals must be submitted by 2:00 p.m. on March 20, 2025. Bidders are required to provide a certified check or bid bond of 5% of the base bid, and proposals will remain firm for 60 days after opening. The City reserves the right to reject any proposals and will evaluate bids based on overall favorability to the city's interests.

The procurement does not specify explicit set-aside designations or restrictions for disadvantaged enterprises. The contract requires successful bidders to post performance and payment bonds and comply with City Charter requirements. While no incumbent vendor is mentioned, the project includes detailed specifications for dredging operations with strict environmental controls, equipment requirements, and disposal guidelines. Contractors must apply for a City of Birmingham Soil Erosion and Sedimentation Control (SESC) permit at no cost and adhere to specific environmental considerations, including avoiding fish habitats and maintaining non-erosive flow from dewatering bags. The project includes provisions for yearly price increases to account for inflation, with contractors required to provide percentage increases for each contract year from July 15, 2026, through October 31, 2029. The City Council is scheduled to award the contract on May 5, 2025, with executed contracts and insurance due by April 14, 2025. Though a specific budget range is not explicitly stated, the project involves annual dredging and disposal services with potential for a multi-year contract value.

Opportunity text

Sealed proposals endorsed "2025-2029 QUARTON LAKE MAINTENANCE DREDGING Contract # 15-25 (M) be received from contractors by the City of Birmingham, at the office of the City Clerk, located at 151 Martin Street, Birmingham, Michigan, until 2:00 p.m., on Thursday, March 20, 2025. The proposals will be publicly read aloud at that time. Bids submitted after the exact time specified for receipt will not be considered. The project will consist of: Hydraulic dredging and dewatering, of approximately 380 cyds and disposal of approximately 190 cyds per year for five (5) years of accumulated sediment from Quarton Lake; Soil erosion control measures including turbidity curtain, catch basin inserts, silt fence, and straw blanket; Other miscellaneous items of work including site restoration. Bidders shall review and comply with all Contract Documents, and supplemental information, as defined in the Instructions For Bidders. Bidding documents for this project must be obtained electronically through the Michigan Inter- governmental Trade Network (MITN), which may be accessed at https://www.bidnetdirect.com/mitn. Vendors wishing to obtain copies of the bidding documents will need to register through the MITN website. Electronic versions of bidding documents will be posted to MITN starting Thursday, February 20, 2025. All questions are due to nkolinski@hrcengr.com by 10:00 am, March 06, 2025. An optional pre-bid meeting will be held on March 04, 2024, at 10:00 a.m. in the City of Birmingham, at the northeast corner of Oak Avenue and Lake Park Drive. The successful bidder shall be required to post bonds, and to comply with the contract requirements of the City Charter. Bids are firm, and no bid may be withdrawn for a period of sixty (60) days after opening of bids. Procurement for the City of Birmingham will be handled in a manner providing fair opportunity for all businesses. This will be accomplished without abrogation or sacrifice of quality and as determined to be in the best interest of the City of Birmingham. The City reserves the right to reject any and all bid proposals, to waive any irregularity in any of the bid proposals submitted, and to accept any proposal which it shall deem to be the most favorable to the interest of the City. A certified check or bid bond in the amount of five percent (5%) of the base bid must accompany each bid proposal

Files

File Type Posted
20250217_Full_Specs_Issued_For_Bids.pdf PDF
20250220_Issued_for_Bids.pdf PDF
20250310_Addendum_No_1_Compiled.pdf PDF