The Town of Summerville is seeking a contractor for the comprehensive renovation of Doty Park Playground, located at 320 N Laurel St in Summerville, South Carolina. The project involves complete removal of existing playground equipment and engineered wood fiber surfacing, followed by installation of new drainage systems and accessible playground equipment designed for children ages 5-12. The procurement is a Request for Proposal (RFP) with a mandatory site walk-through scheduled for October 16, 2025, at 10 a.m., and proposal submissions due on November 10, 2025, at 1:00 p.m. Proposing firms must submit comprehensive documentation including an introductory letter, team member resumes, project references, proposed timeline, conceptual design, warranty information, surfacing specifications, and a detailed budget. The evaluation committee will score proposals based on specific criteria: unique facility use (0-30 points), inclusive play approach (0-15 points), equipment quality (0-25 points), surfacing quality (0-15 points), shade incorporation (0-10 points), and construction timeline (0-5 points). The playground will expand from its current area to approximately 5,225 square feet by incorporating an adjacent space, with a preference for inclusive design using artificial turf, poured-in-place safety surfacing, or a combination of both. The contract opportunity is partially funded through a U.S. Department of Housing & Urban Development Community Development Block Grant (CDBG), which mandates specific federal compliance requirements. All bidding entities must be registered in the Federal System for Award Management (SAM.gov) and comply with Davis-Bacon wage regulations. The total project budget is not to exceed $500,000, with the Town of Summerville anticipating proposal evaluations between November 12 and December 2, 2025, and final contract award by the Town Council on December 8, 2025. While no specific set-aside designations for disadvantaged businesses are explicitly mentioned, the complex federal funding requirements suggest potential opportunities for diverse contractors. The project requires comprehensive integration of new playground infrastructure, including drainage systems and potentially artificial turf or specialized safety surfacing. Bidders must demonstrate technical capability, design creativity, and compliance with accessibility standards, with proposals remaining valid for 90 days from the submission date.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
APENDIX I.pdf | 1MB | 10/2/25 | ||
BID SHEET Doty Park Playground.pdf | 598KB | 10/2/25 | ||
Doty Park Playground RFP Final.pdf | 1MB | 10/2/25 |