2025-000901 - Doty Park Playground
Closed State & local contract opportunity Posted
- Solicitation number
- 2025-000901
- State
- South Carolina
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 155 Buildings And Structures: Fabricated And Prefabricated
- 470 Hospital, Nursing Home Or Residential Specialized Equipment For The Disabled
- 578 Miscellaneous Products (Not Otherwise Classified)
- 595 Nursery (Plants) Stock, Equipment, And Supplies
- 650 Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
- 805 Sporting Goods, Athletic Equipment And Athletic Facility Equipment
- 870 Venetian Blinds, Awnings, And Shades
- 906 Architectural Services, Professional
- 909 Building Construction Services, New, Including Maintenance And Repair Services
- 911 Construction And Utilities, Higher Education
- Points of contact
-
- Kat Hill khill@summervillesc.gov
- Amy Evans aevans@summervillesc.gov
- Laura Danforth-Moorer lmoorer@summervillesc.gov
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Town of Summerville is seeking a contractor for the comprehensive renovation of Doty Park Playground, located at 320 N Laurel St in Summerville, South Carolina. The project involves complete removal of existing playground equipment and engineered wood fiber surfacing, followed by installation of new drainage systems and accessible playground equipment designed for children ages 5-12. The procurement is a Request for Proposal (RFP) with a mandatory site walk-through scheduled for October 16, 2025, at 10 a.m., and proposal submissions due on November 10, 2025, at 1:00 p.m. Proposing firms must submit comprehensive documentation including an introductory letter, team member resumes, project references, proposed timeline, conceptual design, warranty information, surfacing specifications, and a detailed budget. The evaluation committee will score proposals based on specific criteria: unique facility use (0-30 points), inclusive play approach (0-15 points), equipment quality (0-25 points), surfacing quality (0-15 points), shade incorporation (0-10 points), and construction timeline (0-5 points). The playground will expand from its current area to approximately 5,225 square feet by incorporating an adjacent space, with a preference for inclusive design using artificial turf, poured-in-place safety surfacing, or a combination of both.
The contract opportunity is partially funded through a U.S. Department of Housing & Urban Development Community Development Block Grant (CDBG), which mandates specific federal compliance requirements. All bidding entities must be registered in the Federal System for Award Management (SAM.gov) and comply with Davis-Bacon wage regulations. The total project budget is not to exceed $500,000, with the Town of Summerville anticipating proposal evaluations between November 12 and December 2, 2025, and final contract award by the Town Council on December 8, 2025. While no specific set-aside designations for disadvantaged businesses are explicitly mentioned, the complex federal funding requirements suggest potential opportunities for diverse contractors. The project requires comprehensive integration of new playground infrastructure, including drainage systems and potentially artificial turf or specialized safety surfacing. Bidders must demonstrate technical capability, design creativity, and compliance with accessibility standards, with proposals remaining valid for 90 days from the submission date.
Opportunity text
The Town of Summerville is seeking to hire a company for the removal of existing equipment and EWF surfacing, installation of drainage, and the design and installation of new accessible playground equipment at Doty Park located at 320 N Laurel St,
Files
| File | Type | Posted |
|---|---|---|
| Doty Park Playground RFP Final.pdf | ||
| APENDIX I.pdf | ||
| BID SHEET Doty Park Playground.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity